Monthly Management Report October 2012.
Submitted By Facility Management Team
1
Monthly Report-(Jul 2011)
![Page 2: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/2.jpg)
EXECUTIVE - SUMMARY
2
This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan.
The following points are put forward for review1. Scope and nature of services2. Proposed manpower distribution.3. Availability of manpower.4. Major incidents summary.5. Initiative taken. 6. Initiatives planned for next month.7. Power failure analysis8. Monthly HSD consumption.9. DG- Generated power KWH.10.EB power consumption.11.Average power consumption EB+DG.12.Liquid nitrogen consumption.13.Suggestions and requirements.14.Transition pending works.15.Help desk, Complaint register
![Page 3: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/3.jpg)
1.Scope & Nature of Services
3
CeNSE-Facility
Management
Electrical
HVAC Plumbing Help desk
ETP BMS
RO PlantUltra pure
water system
![Page 4: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/4.jpg)
2.PROPOSED MANPOWER DISTRIBUTION
4
![Page 5: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/5.jpg)
3.Availability of Manpower
5
DESIGNATION
Planed
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Facility Manag
er
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Technologist
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Electrician
4 0 2 3 3 4 4 4 4 4 4 4 4 4 4 4 4
Chiller operato
rs
1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BMS operato
r
3 0 1 1 1 1 1 1 1 1 1 1 1 1 3 2 2
Plumbers
1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1
Asst.Technicia
n
2 0 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2
Total 15
4 10 11 11 13 12 13 13 13 13 13 13 13 15 14 14
![Page 6: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/6.jpg)
4.Major Incidents Summary
6
Date Location Failure details Action taken & Status
05-10-12
Utility Di water drained out Wet bunch tap was in open position
11-10-12 Cleanroom PCW filter damaged at wet etch area.
Replaced the filter.
Microsoft Office Word 97 - 2003 Document
![Page 7: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/7.jpg)
5.Initiatives taken
7
1. FPS- pressure gauge fixed near BMS.2. Cleanroom wet etch area – new pipe
line provided at corridor.3. Scrap material shifted from open
area.4. PCW pump o-rings fixed.5. LT panel room cleaned.(Which is
maintaining by CCMD)6. ETP painting work done.7. General exhaust, chiller, AHU, DG,
UPS, FPS PPM done.
![Page 8: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/8.jpg)
6.Initiatives Planned for next month
8
DG “B” check. New bore well water tap connection for chiller cleaning. Electrical system taking over- CeNSE. Partition of utility 2nd floor area. A/C works at UPS area 2nd floor utility. AHU all- filters changing.
![Page 9: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/9.jpg)
7.POWER FAILURE ANALYSIS
9
SL
Date From To Total
1 1-10-12 11:30, 15:45
11:50,16:00 35 Mins
2 7-10-12 11:05,18:15
11:30,18:30 40 Mins
3 10-10-12
9:10, 9:20 10 Mins
4 12-10-12
9:45 9:55 10 Mins
5 13-10-12
10:50 12:10 (20 times power fluctuation)
1:20 Hrs
6 14-10-12
15:00 15:15 15 Mins
7 22-10-12
13:35,16:35
14:05,16:45 40 Mins
8 30-10-12
12:45 13:00 15 Mins
TOTAL HRS 6: 05 Hrs
![Page 10: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/10.jpg)
8.MONTHLY HSD CONSUMPTION
10
![Page 11: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/11.jpg)
9.DG Generated Power KWH
11
![Page 12: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/12.jpg)
10. EB Power Consumption
12
![Page 13: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/13.jpg)
11.AVERAGE POWER CONSUMPTION EB+DG
13
![Page 14: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/14.jpg)
12.LIQUID NITROGEN CONSUMPTION
14
![Page 15: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/15.jpg)
13.Suggestions and Requirements
15
•Shelters to be provided for DGs, Utility terrace & Fire pump house to avoid rain water and leaves come inside the DG cabin, utility building & Raw water tank in side.• Shelter with closed fencing can make on the Fire tank & this area use as storage place.•Uniform & Safety shoes to be provided for all maintenance staffs.•Walky-talky to provided for maintenance staff.•Dg-1&2 (CeNSE Building) B-Check pending.•A/C for UPS to be provided.•Chemical & Gas cabinet exhaust to be provided.
![Page 16: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/16.jpg)
14.Transition – Pending works
16
•
Microsoft Office Excel Worksheet
![Page 17: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/17.jpg)
15.Help desk, Complaints register
17
Microsoft Office Excel Worksheet
![Page 18: Monthly Management Report October 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)](https://reader030.fdocuments.in/reader030/viewer/2022032606/56649eb35503460f94bba387/html5/thumbnails/18.jpg)
Thanks
by, Facility Management Team18