Montgomery County (Va.) Schools Capital Maintenance List

download Montgomery County (Va.) Schools Capital Maintenance List

of 3

Transcript of Montgomery County (Va.) Schools Capital Maintenance List

  • 7/29/2019 Montgomery County (Va.) Schools Capital Maintenance List

    1/3

    As of Sept. 10, 2012

    Page 1

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    A B C D E F G

    Priority Location Project Title Schedule StatusEstimated

    CostRunning To

    1 All Repair Roofs Complete

    2 CHS ADA Upgrades Complete $0

    3 All Building InspectionsFunded -In

    Process$350,000.00 $350,000

    4 CHSReplace Roof Over Business

    Classrooms Area

    Summer 2013 Funded -In

    Process$126,500.00 $476,500

    5Technology

    BuildingReplace Roof

    Summer 2013 Funded -In

    Process$132,250.00 $608,750

    6 Various Repair RoofsFunded -

    In house$57,068.00 $665,818

    7CHS,

    EMHS, SMS

    Install Ladder Safety Cages for

    Stages$9,000.00 $674,818

    8 BEL, CHSReplace Fire Alarm Panel

    (Design and Investigation)

    $250,000.00 $924,818

    9 BESInstall Sidewalk/Ramp Down

    Kindergarten Entrance$30,000.00 $954,818

    10Technology

    BuildingReplace/Repair Windows $144,000.00 $1,098,81

    11 VariousAbate Asbestos Containing

    Material$50,000.00 $1,148,81

    12 CHS

    Renovate/Replace Toilet

    Partitions In Restrooms Not

    Addressed By ADA Upgrade

    Funded -In

    Process$43,000.00 $1,191,81

    13 CPS Install Tile For Fire Exit Paths $12,000.00 $1,203,81

    14

    CES, HAE,

    GLE, SMS,

    MBE, CPS,

    OCMS/BMS

    Repave Parking Lots IncludesPrep and Repainting, (CPS

    Parent Drop Off Road $60K)

    $350,000.00 $1,553,81

    15 CHS, SMS Replace Stage Lighting/Rigging $105,000.00 $1,658,81

    16 SMS Replace Gym Floor $150,000.00 $1,808,81

    17 CHS Replace Gym Entrance Doors $60,000.00 $1,868,81

    18 SMS Replace Gymnasium Bleachers $40,000.00 $1,908,81

    19 CHS Replace Lockers $300,000.00 $2,208,81

    20 CHS Remove Mounds In Front ofBuildin

    $52,000.00 $2,260,81

    21 GLE, MBEUpgrade KG Building Air

    Conditioning$73,000.00 $2,333,81

    22 CHS Replace Auditorium Seats $135,000.00 $2,468,81

    23 SMSReplace Existing Fuel Oil Tank /

    Pursue Natural Gas$145,000.00 $2,613,81

    24 AES Refinish Gym Floor $13,000.00 $2,626,81

    25 Fac. Bldg. Replace All windows $44,000.00 $2,670,81

    Capital Maintenance Project Budget List

    FY 2012-13

  • 7/29/2019 Montgomery County (Va.) Schools Capital Maintenance List

    2/3

    As of Sept. 10, 2012

    Page 2

    1

    2

    3

    A B C D E F G

    Priority Location Project Title Schedule StatusEstimated

    CostRunning To

    Capital Maintenance Project Budget List

    FY 2012-13

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    26 GLE, MBEInstall Canopy over Walkway to

    Kindergarten$110,400.00 $2,781,21

    27 CHSAdd Fire Devices to Family and

    Consumer Sciences Kitchen

    In Process $2,500.00 $2,783,71

    28 HAE Replace AC Units $17,000.00 $2,800,71

    29 BEL Replace/Repair Windows $38,000.00 $2,838,71

    30

    NBMS,

    NCMS,

    EMHS

    Reduce Sunglare Issues In

    Libraries$15,000.00 $2,853,71

    31 FBEReplace/Repair Mobile Unit

    Sidewalks$29,000.00 $2,882,71

    32 KES Remove Courtyard Decking $10,000.00 $2,892,71

    33 BEL Install Clinic Bathroom $7,000.00 $2,899,71

    34 SMS Remove Old Stadium Lighting $13,000.00 $2,912,71

    35 GLE, MBE Replace Gas Burners On Boilers $18,000.00 $2,930,71

    36CES, GLE,

    MBE

    Replace Soffits (Asbestos

    Containing Material)$70,000.00 $3,000,71

    37NBMS,

    NCMSClean Dryvit $15,000.00 $3,015,71

    38 CPS, HAE Remove Old Fuel Oil Tanks $27,000.00 $3,042,71

    39 GLE Replace Music Room Carpet $1,700.00 $3,044,41

    40 SMS Repave Play Area $13,000.00 $3,057,41

    41 HAEReplace Carpet with Tile in

    Multipurpose Room$14,000.00 $3,071,41

    42 SMS Repave Bus Loop VDOTEstimating

    Cost$3,071,41

    43 FBE Install Fence at Play AreasEstimating

    Cost$3,071,41

    44

    HAE, MBE,

    GLE, CPS,

    FBE

    Repair/Replace Install Various

    Fencing Issues

    Estimating

    Cost$3,071,41

    45 CPS

    Replace/Repair

    Sidewalks/Curbing and Loading

    Dock

    Estimating

    Cost

    $3,071,41

    46 SMSUpgrade Heating and Ventilation

    S stem

    Estimating

    Cost$3,071,41

    47 OCMS/BMS Upgrade Boiler / Heat LoopEstimating

    Cost$3,071,41

    48 OCMS/BMSReplace Windows: If It Is Used

    For School$300,000.00 $3,371,41

    49 OCMS/BMSReplace/Repair Canopy: If It Is

    Used For School$275,000.00 $3,646,41

    50 SMS annex Demolish Annex Building $245,000.00 $3,891,41