MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE...

36
MONROE BLOCKS PROJECT UPDATE SEPTEMBER 11, 2017

Transcript of MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE...

Page 1: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

MONROE BLOCKS

PROJECT UPDATE

SEPTEMBER 11, 2017

Page 2: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

Agenda

5:30 - 5:40pm Sign-in

5:40 - 5:50pm Welcome & Introductions

5:50 - 6:00pm Council Member Remarks

6:00 - 6:30pm Monroe Blocks Developer Project Overview

6:30 - 7:00pm Neighborhood Advisory Council / Developer Q&A

7:00 - 7:15pm Community / Public Q&A

7:15 - 7:30pm Next Steps

INTRODUCTION

Page 3: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

JEFFERSON AVE

WO

OD

WA

RD

AV

E

COBO

Development

Buildings

Green spaces

QLINE

People Mover

CAMPUS MARTIUS

HARMONIE PARK

GRAND CIRCUSPARK

CAPITOL PARK

MICHIGAN AVE

GRA

TIO

T A

VE

OVERVIEWPROJECT CONTEXT MAP

HART PLAZA

WA

SH

ING

TO

N B

LVD

BROADWAY ST

MO

NRO

E A

VE

RA

ND

OLPH

ST

FORT ST

MONROE BLOCKSIssued by Bedrock // September 11, 2017 3 of 36

Page 4: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

ONE CAMPUS MARTIUS GARAGE

MONROE BLOCKS

CADILLAC SQ. APTS

FIRSTNATIONALBUILDING

CADILLAC TOWER

ONE CAMPUS MARTIUS

HUDSON’SSITE

1001WOODWARD

OVERVIEWPROJECT CONTEXT MAP

MONROE BLOCKSIssued by Bedrock // September 11, 2017 4 of 36

Page 5: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

OVERVIEWAERIAL VIEW

5 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 6: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

CONNECT the surrounding Downtown districts through intelligent

urban and landscape design strategies

CREATE new vibrant public spaces mixed with active retail, food and

entertainment experiences.

REVIVE density and a variety of uses to the heart of Downtown with

iconic office and residential design.

CELEBRATE the historic significance of the Monroe District.

01

02

03

04

PROJECT PRINCIPLESMONROE BLOCKS

6 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 7: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

CONNECT the surrounding Downtown districts through intelligent

urban and landscape design strategies

CREATE new vibrant public spaces mixed with active retail, food and

entertainment experiences.

REVIVE density and a variety of uses to the heart of Downtown with

iconic office and residential design.

CELEBRATE the historic significance of the Monroe District.

01

02

03

04

PROJECT PRINCIPLESMONROE BLOCKS

7 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 8: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

DISTRICT STRATEGYCONNECTING NEIGHBORHOODS

GREEKTOWN

Housing a dense area of retail and

restaurants, Greektown provides

an activated streetscape with a

prominent night life, creating a

connection of activity from Monroe

Blocks to Greektown casino.

FINANCIAL DISTRICT

Detroit’s Financial District is one of

the city’s highest concentrations

of quality commercial architecture.

Thousands of office workers pass through its streets every day.

LOWER WOODWARD

Detroit’s Main Street: an iconic

avenue of fashion and retail.

Campus Martius is the “Heart” of

Downtown Detroit, programmed

year round to attract a diverse

population from the area.

BRICKTOWN

Perhaps best known for the People

Mover stop that bears its name,

the Bricktown District includes the

Wayne County Building, Jacoby’s

Pub, St Andrews Hall, as well as

the headquarters for Blue Cross

Blue Shield.

MONROE BLOCKSIssued by Bedrock // September 11, 2017 8 of 36

Page 9: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

DISTRICT STRATEGYCONNECTING NEIGHBORHOODS

FINANCIAL DISTRICT

LOWER WOODWARD

GREEKTOWN

BRICKTOWN

DISTRICT STRATEGYCONNECTING NEIGHBORHOODS

A

B

C

D

D

C

B

A

MONROE BLOCKS

MONROE BLOCKSIssued by Bedrock // September 11, 2017 9 of 36

Page 10: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

URBAN DESIGNWOODWARD GRID

HISTORIC STREET FABRIC CURRENT SITE CONDITIONS

MONROE BLOCKSIssued by Bedrock // September 11, 2017 10 of 36

Page 11: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

ept/

DISTRICT STRATEGYREINTRODUCE HISTORIC ALLEYWAYS

MONROE BLOCKSIssued by Bedrock // September 11, 2017 11 of 36

Page 12: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

DISTRICT STRATEGYCONNECT TO SURROUNDING CONTEXT

MONROE BLOCKSIssued by Bedrock // September 11, 2017 12 of 36

Page 13: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

DISTRICT STRATEGYCREATE NEW PUBLIC COURTYARDS

MONROE BLOCKSIssued by Bedrock // September 11, 2017 13 of 36

Page 14: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

90F

60F

DISTRICT STRATEGYADJUST FLOOR PLATES BY USE

MONROE BLOCKSIssued by Bedrock // September 11, 2017 14 of 36

Page 15: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

DISTRICT STRATEGYADJUST HEIGHT TO CONTEXT

MONROE BLOCKSIssued by Bedrock // September 11, 2017 15 of 36

Page 16: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

SITE PLAN MONROE BLOCKS

FARMER STREET

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

RA

ND

OLP

H S

TREET

ONE CAMPUS MARTIUS

ONE CAMPUS MARTIUS GARAGE

CADILLAC SQ. APTS

TO

GR

EEK

TO

WN

CAMPUS MARTIUSPARK

CADILLAC TOWER

A1

A2

B1

B2

B3

ONE CAMPUS MARTIUS

OFFICE TOWER [35 STORIES: 535’]

• 818,000 GSF Office• 64,000 GSF Retail

RESIDENTIAL MID-RISE [18 STORIES: 187’]

• 104,000 GSF Residential• 53,500 GSF Retail

RESIDENTIAL MID-RISE [12 STORIES: 122’]

• 122,000 GSF Residential• 38,000 GSF Retail

RESIDENTIAL MID-RISE [7 STORIES: 70’]

• 49,000 GSF Residential• 13,700 GSF Retail

RESIDENTIAL TOWER [26 STORIES: 341’]

• 158,000 GSF Residential

TOTAL DEVELOPMENT: 1.4M GSF*

a1

a2

b1

b2

b3

MONROE BLOCKSIssued by Bedrock // September 11, 2017 16 of 36

Page 17: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

CONNECT the surrounding Downtown districts through intelligent

urban and landscape design strategies

CREATE new vibrant public spaces mixed with active retail, food and

entertainment experiences.

REVIVE density and a variety of uses to the heart of Downtown with

iconic office and residential design.

CELEBRATE the historic significance of the Monroe District.

01

02

03

04

PROJECT PRINCIPLESMONROE BLOCKS

17 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 18: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

CAMPUS MARTIUS

Detroit’s Main Street: an iconic avenue of

fashion and retail. Campus Martius is the

“Heart” of Downtown Detroit, programmed

year round to attract a diverse population from

the area.

CADILLAC SQUARE

Adjacent to the “Heart” of Downtown

Detroit, Cadillac Square houses the largest

area for public activation and private events.

Surrounded by high foot traffic for both retail and office buildings, Cadillac Square acts as the hub of activity for both day and night time

events.

ESPLANADE

Located along the center of Woodward, the

Esplanade provides a connection point between

Campus Martius and the Q Line, a new light

rail transit system. The Esplanade provides

pedestrian connectivity to public events and

high end retail.

PUBLIC SPACESBUILDING ON SUCCESS

MONROE BLOCKSIssued by Bedrock // September 11, 2017 18 of 36

Page 19: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

FARMER STREET

MONROE AVENUE

CA

DIL

LAC

SQ

UA

RE

BATES STREET

RANDOLPH STREET

PUBLIC SPACEMONROE BLOCKS

CADILLAC TOWER

WATER BOARD

CA

DIL

LAC

SQ

UA

RE

MONROE PLAZA

FARMER STREET

BATES SQUARE

RANDOLPH SQUARE

1

2

3

4

1

2

3

CAMPUS MARTIUS

4

MONROE BLOCKSIssued by Bedrock // September 11, 2017 19 of 36

Page 20: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

RA

ND

OLP

H S

TREET

a1

a2

b1

b2

b3

CADILLAC SQUARE A1 LOBBY AND WALKWAY

MONROE BLOCKSIssued by Bedrock // September 11, 2017 20 of 36

Page 21: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

MONROE PLAZA BLOCK A COURTYARD

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

a1

a2

b1

b2

b3

RA

ND

OLP

H S

TREET

MONROE BLOCKSIssued by Bedrock // September 11, 2017 21 of 36

Page 22: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

a1

a2

b1

b2

b3

FARMER STREET PEDESTRIAN STREET

MONROE BLOCKSIssued by Bedrock // September 11, 2017 22 of 36

Page 23: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

BATES YARD BLOCK B COURTYARD

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

a1

a2

b1

b2

b3

RA

ND

OLP

H S

TREET

MONROE BLOCKSIssued by Bedrock // September 11, 2017 23 of 36

Page 24: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

CONNECT the surrounding Downtown districts through intelligent

urban and landscape design strategies

CREATE new vibrant public spaces mixed with active retail, food and

entertainment experiences.

REVIVE density and a variety of uses to the heart of Downtown with

iconic office and residential design.

CELEBRATE the historic significance of the Monroe District.

01

02

03

04

PROJECT PRINCIPLESMONROE BLOCKS

24 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 25: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

PROGRAM LAYOUTMONROE BLOCKS

OFFICE

Building A1: 818,000 SF

Total Office: 818,000 GSF

RESIDENTIAL

Building A2: 136 UNITS

Building B1: 153 UNITS

Building B2: 61 UNITS

Building B3: 130 UNITS

Total Residential: 482 UNITS

RETAIL

Building A1: 63,700 SF

Building A2: 53,500 SF

Building B1: 38,000 SF

Building B2: 13,800 SF

Total Retail: 169,000 GSF

PARKING

Underground Spaces: 900 SPACES

Total Parking Spaces: 900 SPACES

a1

a2

b1

b2

b3

MONROE BLOCKSIssued by Bedrock // September 11, 2017 25 of 36

Page 26: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

OFFICEA1 OFFICE TOWER

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

RA

ND

OLP

H S

TREET

a1

a2

b1

b2

b3

26 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 27: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

RETAILA1 SIGNATURE RETAIL CORNER

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

RA

ND

OLP

H S

TREET

a1

a2

b1

b2

b3

MONROE BLOCKSIssued by Bedrock // September 11, 2017 27 of 36

Page 28: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

RESIDENTIAL BUILDING A2

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

RA

ND

OLP

H S

TREET

a1

a2

b1

b2

b3

28 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 29: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

RESIDENTIAL BUILDINGS B1 & B2

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

RA

ND

OLP

H S

TREET

a1

a2

b1

b2

b3

29 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 30: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

RESIDENTIAL BUILDING B3

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

RA

ND

OLP

H S

TREET

a1

a2

b1

b2

b3

30 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 31: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

CONNECT the surrounding Downtown districts through intelligent

urban and landscape design strategies

CREATE new vibrant public spaces mixed with active retail, food and

entertainment experiences.

REVIVE density and a variety of uses to the heart of Downtown with

iconic office and residential design.

CELEBRATE the historic significance of the Monroe District.

01

02

03

04

PROJECT PRINCIPLESMONROE BLOCKS

31 of 36MONROE BLOCKSIssued by Bedrock // September 11, 2017

Page 32: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

MONROE BLOCKS VIBRANT URBAN DENSITY

The Monroe Blocks Historical District was

composed of three blocks comprised of a

series of unique buildings. These buildings

were part of a vibrant district containing

theaters, saloons, restaurants, hotels and

office spaces.

MONROE BLOCKSIssued by Bedrock // September 11, 2017 32 of 36

Page 33: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

As designed by Albert Kahn, the National Theatre opened in September 1911 as a vaudeville house. As vaudeville slowly died out and newer motion picture theaters opened in the new Detroit theater district, the National Theatre switched to burlesque entertainment.

In the 1970’s it became an X-rated movie venue. In 1975, the National Theatre was abandoned and has sat vacant for over 40 years.

The National Theater has been structurally compromised and the interior is badly deteriorated and has been stripped of its historic material.The facade remains marginally intact, and will be restored as part of the Monroe Blocks development.

1911 1970s TODAY

NATIONAL THEATERFACADE

MONROE BLOCKSIssued by Bedrock // September 11, 2017 33 of 36

Page 34: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

GATEWAYADAPTIVE REUSE

MONROE BLOCKSIssued by Bedrock // September 11, 2017 34 of 36

Page 35: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

2017 2018 2019 2020 2021 2022

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4

BUILD A1+ A2

DESIGN BI + B2 + B3

BUILD B1 + B2 + B3

DESIGN A1 + A2

SCHEDULEPROJECT MILESTONES

FARMER STREET

BATE

S ST

REET

MO

NRO

E A

VEN

UE

CADILLAC SQUARE

a1

a2

b1

b2

b3

MONROE BLOCKSIssued by Bedrock // September 11, 2017 35 of 36

Page 36: MONROE BLOCKS - Detroit · 2018. 9. 20. · VE VE COBO Development Buildings Green spaces QLINE People Mover CAMPUS MARTIUS HARMONIE PARK GRAND CIRCUS PARK CAPITOL PARK VE VE OVERVIEW

MONROE BLOCKS

PROJECT UPDATE

SEPTEMBER 11, 2017

MONROE BLOCKSIssued by Bedrock // September 11, 2017 36 of 36