Monitoring well performance

31
Monitoring SUEZ Production Well Performance 2016 AWWA PNWS Conference Roger Dittus P.G. May 6, 2016

Transcript of Monitoring well performance

Monitoring SUEZ Production Well Performance

2016 AWWA PNWS Conference

Roger Dittus P.G.

May 6, 2016

Well efficiency decline is obviously a bad thing…

Increased pump lift

Pump design becomes “wrong”

wasted energy

lowered ability to meet demand

may become “permanent”

2 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Monitoring well performance

3 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

?

??

Fine-grained Sediments

with sand lenses

? ?

C. Petrich

Interbedded sand, silt, clay

Mudstone

Conceptual Cross-Section (Regional Scale)

Shallow coarse-grained sediments and basalt

Volcanic

Rocks

4,000

2,000

2,000

4,000

0

Ele

va

tio

n (

fee

t)

W EMunicipal Domestic Municipal

Adapted from a cross section by S. Wood BSU Geosciences

Arsenic

Uranium

Concentration

> Primary MCL

= “not useful”

Decommission

Treat Fe/Mn

Re-drill

Decommission

Treat Fe/Mn

Re-drill

ASR

SUEZ “Well Op” tool helps us evaluate well performance

8 I

• SUEZ utility in New York modeled Well Op tool on original version of

“Well Watch” software developed under SUEZ R + i Alliance

• Well Op tool creates easily scalable graphs of SCADA system data

• Allows comparison of current/ recent well performance to previous

performance

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Well Op tool

9 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Well Op tool

10 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Well Op tool

11 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Reviewing well operation

12 I

80 feet

300 gpm

Airline problem

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Reviewing well operation

13 I

550 gpm

80 feet50 feet

300 gpm

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Pump & screens cleaned

Tracking well performance decline

14 I

SUEZ Clinton well

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Tracking well performance decline

15 I

1,000 gpm 600 gpm

Pump

throttled

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Tracking well performance decline

16 I

~30% decline

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Evaluating effectiveness of maintenance

17 I

screens

chemically

cleaned

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Evaluating effectiveness of maintenance

18 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Identification of impacts from pumping wells

19 I

SUEZ Goddard well

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Identification of well interference effects

20 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Reduction in specific capacity due to influence of another pumping well

21 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Well interference

22 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Another example

23 I

SUEZ River Run well

Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Another example

24 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

25 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Another example

26 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Another example

• Well Op tool allows for an easy comparison of current to historic well

performance

• Can be more confident of need to perform well, pump, and

monitoring equipment maintenance

• Currently working to translate observations from Well Op Tool into

work orders in GIS-based asset management system

• In a nut shell: Current tool use = we look for a problem to fix

Summary

27 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Always room for improvement

28 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

More advanced tool will be available soon

29 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

More advanced tool will be available soon

30 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA

Thank you

31 I Monitoring SUEZ Production Well Performance

May 6, 2016 PNWS AWWA