Subject: - MONITORING REPORT REGARDING UP-GRADATION OF 100-MIDDLE SCHOOLS TO
HIGH LEVEL (!G" IN #H$ER PA#HTUN#H%A ON NEED ASIS&
ADP NO' 1)100*+, SH: GGMS CHARORAI UNER
S/No
.
Analysis and recommendation Replies
1- One of the basic requirements in planning of any facility is the
approach way to that facility. n case of educational facility this
point need a prime consideration. !he under discussioneducational facility is for girls in which proper approach way is
the main and ma"or consideration. #ut unfortunately no any
attention has been gi$en to the proper approach way regarding
site selection. !wo possible approach ways to the school found
but both ha$e steep slope% also large stones obstructed the way.
Remo$al of large stones and proper dressing of the approach is
highly needed. t is recommended for the department to clear the
approach way of the e&isting facility also 'eep this point it in
the planning of future wor's.
!he construction of approach path is not co$ered
in the appro$ed scope of wor'% and the site
selection is done by the client department% whichin normally handed o$er after the appro$al of
scheme. (owe$er the contractor has been as'ed
to remo$e the large stones and dressing the
approach way at his own cost.
)- *or' order which was issued to the contractor it is clearly
mentioned that !echnical Sanction from the competentauthority must be obtained before commencement of the
wor' also in +lause-, if +* +ode it is reflected the !S
must be accorded by the competent authority before the
construction wor' is commenced as it certified that the
design% specifications and calculations in the estimate are
adequate enough for the building. n the sub"ect scheme the
!S is still under process of appro$al while the wor' is
e&ecuted which is against the rules% also is shows the
intentionally mismanagement of the concerned authoriation.
t is recommended that !S should be processed within 1,-
days positi$ely failing which action is proposed against the
responsible indi$iduals for intentionally delayed of !S
appro$al. Also in future no e&ecution of wor' should be done
till and unless !S is in hand.
!echnical Sanction 0stimate is under process and
is submitted to the sanctioning authority whichwill be a$ailable for $erification in short time.
- A well-managed pro"ect will require a proper schedule and
related documents. ro"ect schedule will help to organie all
the related tas's related to pro"ect is an easy and manageable
way. Scheduling describes guidance and pathway for a
pro"ect to run. t defines certain deli$erables which are
needed that must be achie$ed on a timely basis so as to
pre$ent the time o$er run. 2or proper implementation andmonitoring of the pro"ect components% the +3* 4epartment
shall prepare a construction schedule so as to complete the
scheme well in time by a$oiding any time o$errun.
!he construction schedule is normally prepared
for the schemes% but due to funding issues/
intermittent releases the same is not possible to
follow strictly. (owe$er% it is ensured that the
progress of wor' remains At-ar with the
a$ailable funding and complete the scheme as
per stipulated period.
5 !he +3* 4epartment 6ala'and should maintain a site register
on the site to record the obser$ations and recommendations of
higher $isiting officers for guidance of the super$isory staff.
4irections ha$e been issued to the S4O7s for
maintaining Site Register at all sites and ensure
its compliance.
, Some substandard wor' found which need repair
immediately. On site the rectification wor' required
discussed with the department officers.
8+ pipe has been installed to the septic tan' for foul gas
disposal in place of 6S pipe as shown in photograph.
!he 8+ pipe for disposal of foul gas is more
economical than + pipe in the instant case. (owe$er%as "ointly discussed at site% the same has been replaced
b + pipe by contractor at his own cost.
+oncealed electric fitting has been planned in building but
now in classrooms e&posed fitting for lights in progress
which shows that pipe has been laid in slab without any
planning and drawing.
!he electric wiring has been done as concealed
in the school building e&cept at one location is a
class room as pointed out. !he same has been
corrected and done as concealed.
0lectric appliances are not completed installed. n class
rooms fans and lights are missing.
As the wor' on internal electrification was in
progress at the time of $isit% therefore electrical
accessories were not fully installed. !he wor' is
now completed and all the ceiling fans and lights
ha$e be installed at site.
-