    SUBJECT: - MONITORING REPORT OF THE SCHEME CONSTRUCTION OF EXAMINATION HALL,

    ADMIN: BLOCK, ADDATIONAL CLASS ROOMS AND BUS GIRAGES IN GOVT: COLLEGS IN

    KHYBER PAKHTUNKHWA ADP NO: 66!""#6$

    SUB HEAD: CONSTRUCTION OF BUS GIRAGE IN GDC DAGGAR BUNER

    S/No Analysis and recommendation Replies

    1 In the desk review it was notice that the work order for the sub

    scheme has been issued on 01/02/201 havin!

    No"2#$%/&"'R()R with date for completion was framed upto

    0/0*/201 from its commencement date i"e" 0*/02/201+ butin the monthly pro!ress report of the e,ecutin! department the

    date of completion is sent upto 0/0*/201-" .pon inuiry

    from the relevant staff of the & (epartment+ they were

    unable to 3ustify that why the sub scheme was under e,ecution

    phase and no action was taken by the department to restrict the

    contractor so as to achieve his tar!et within the permissible

    limit.It is recommended that the e,ecutin! a!ency must

    3ustify that why such slackness had been observed in the

    completion time period and no action has been taken on

    such time overrun"

    4he scheme is in pro!ress and the tar!et date of completion is

    0/*/201- as per A(5 20161-" Allocation for compact

    scheme for 78 920161-: is Rs; 22"00 9 thick which has been

    erroneously shown in the photo!raph as ramp thickness" i!ht

    breaka!e of the ed!e of ramp at manhole has been rectified+ and

    steel !ratin! will be installed over the manholes"

    D 4wistin! and bul!in! was observed in the R column

    of the !ara!e havin! a -> offset at the lower section

    while a $"$> offset at the upper section as shown in

    photo!raph+ makin! the section to have a reduced load

    takin! capacity and the with e,posure to failure"

    4he increase in offset of the column at upper section was

    due to over6concretin! as a result of shutterin! problem and

    same has been rectified at site"

  • 7/25/2019 Monitoring Report of the Scheme Construction of Bus Girage in Gdc Daggar Buner

    2/2

    )E)4ID) )NBIN))R S@ (IDISI'NA '77I)R S@ )NBIN))R

    & (IDISI'N @N)R & (IDISI'N @N)R & (IDISI'N @N)R