    SUBJECT: - MONITORING REPORT OF THE SCHEMESTRENGTHENING & REHABILITATION OF

    EXISTING VETERINARY INSTITUTIONS IN KHYBER PAKHTUN KHWAADP NO.5!"##$%$# SH: DH' CIVIL VETERINARY HOSPITAL DAGGAR( DISTICT BUNER

    S/No. Analysis and recommendation Replies

    1 Before the construction work is commenced the Technical

    sanction (T.S) must e in hand as it certifies that the desi!n

    and specification and calculation in the estimate are ade"uate

    enou!h for the uildin! to last till its desired life. #n the

    su$ect scheme the work has een e%ecuted ut TS is still

    under process of appro&al which is a!ainst the rules. #t isrecommended that TS should e processed within 1' days

    failin! which action is proposed no e%ecution of work should

    e done until and unless technical sanction is in hand.

    Technical sanction estimate of the scheme

    amountin! to Rs .*+ ,illion has een sumitted

    to the Superintendin! -n!ineer 0 ircle

    ,ardan for appro&al which will e a&ailale for

    &erification in short time.

    23 #n the meetin! held with Su 4i&isional 5fficer of the 0

    4epartment Buner the concerned staff includin! the the su

    di&isional officer was re"uested to furnish the material test

    report of the su$ect scheme also they make it sure that the

    test reports will e made a&ailale to the 4,5 5ffice

    ,alakand 4i&ision till 16thof 7anuary 281 ut they failed in

    !i&in! practical shape to the re"uest forwarded. #t is

    recommended that non 4estructi&e Tests e applied on all thematerials under the trained staff of 9-T :eshawar.

    ;aoratory test are ein! carried in routine for e&ery

    work alon!3with field tests and &isual e%aminations

    of the material. All the necessary tests ha&e een

    done and record is a&ailale for &erification. The

    test reports were not a&ailale at site and instruction

    has een issued to field staff to maintain separate

    file for all laoratory test at site and copies thereof

    will e a&ailale to ,- at site in future.

    63 The uildin! of the i&il &eterinary hospital has not een

    constructed as per actual drawin! (:3#). han!es were made

    in the ori!inal drawin! y the 4istrict 4irector