Monitoring of SPP Practical approach to SPP monitoring within the Flemish Environment, Nature and Energy Department (ENED) Els Verwimp │ May 11, 2016

Transcript of Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01%...

Page 1: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

Monitoring of SPP

Practical approach to SPP monitoring within the Flemish Environment, Nature and Energy Department (ENED)

Els Verwimp │ May 11, 2016

Page 2: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 2 │ │

Introduction

Page 3: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 3 │ │

Procurement within ENED

• ENED → Personnel: ± 640 → 12 divisions → 10 locations

• Procurement → Dispersed (everyone = potential procurer) → Framework contracts are often used

(1 framework contract = 1 procurer) → Lots of small orders (< €8.500: 84% in number ↔ 6% in €) → Procurement in 2015 ± 4.900 tenders / orders ± €18.000.000

Page 4: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 4 │ │

Why monitoring of SPP

• Government of Flanders: 100% SPP by 2020 SPP = sustainable public procurement (↔ GPP)

• ISO 14001 within ENED → 3 goals for SPP 2015 ≥ 25% 2018 ≥ 75% 2020: 100%

→ For product groups for which minimum criteria are available Vehicles Cleaning products and services Furniture

Paper products PCs, laptops and monitors Imaging equipment

Electricity Textiles and clothing Websites

Studies Office supplies (pen, pencil …) Wooden products

Page 5: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 5 │ │

The ENED monitoring system

Page 6: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 6 │ │

History

• No system → In place until 12/31/2012 → No data

• ‘Old’ system (SPP: yes / no) → In place: 2013 – 2014 → No useful data

• ‘New’ system → Developped and tested (in 1 division) in 2014 → In place since January 1, 2015

Page 7: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 7 │ │

History

Old system New system

Includes all types of products, services, works No criteria for what is sustainable: based on ‘gut feeling’ of the procurer Takes wide range of criteria & techniques into account chance to discover good examples No comparable data Risk of ‘green washing’

Limited number of product groups Measures SPP using a predefined set of criteria Misses out on other good examples (e.g. other criteria & techniques used) Comparable data / data on level of product groups Risk of (transparant) ‘green washing’

Page 8: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 8 │ │

The ENED monitoring system

• Mandatory form for procurement / orders ≥ €8.500 (< €8.500 – mandatory handwritten reporting) → Form used to collect data for accounting system → To be filled out before closing contract / confirming order

(= internal proposal for supplier / service provider)

→ Form not used no money reserved no contract / order • 3 simple, mandatory questions in form:

→ Type of expenditure (Procurement / Subsidies / …)

Only visible when expenditure = procurement:

→ Product group → SPP criteria used (when available) Answers registered in 1 project code in the accounting system

• Information on SPP criteria in the form

Page 9: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 9 │ │

The ENED monitoring system

Source: Clipping from the mandatory form (fictitious example)

Stored in accounting system / Used for data analysis

L Z 0 0 H 1

Type of expenditure

Product group

SPP criteria used (yes/no)

Page 10: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 10 │ │

Results (1/1/2015 – 12/31/2015)

Page 11: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 11 │ │

Results (1/1/2015 – 12/31/2015)

Results 2015 → % SPP in €: 72,40% → % SPP in numbers: 66,83%

Page 12: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 12 │ │

From results to actions

Page 13: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 13 │ │

60%

0%

29%

11%

40%

Use of SPP criteria (€)

No SPP criteria available

No SPP criteria available (in development)

SPP criteria used

SPP criteria not used

Results (1/1/2015 – 12/31/2015)

76% study / research Information for future criteria actualisation

Information for future criteria development

59,87% ICT services / Software 7,58% Infrastructure works 5,29% Legal counsel 3,89% Communication 3,44% Maintenance of vehicles 19,94% Other

Page 14: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 14 │ │

99,50% 100,00%

38,66%

78,32%

100,00%

33,30%

0,00%

70,39%

7,25% 9,92%

40,50%

12,13%

0,00%

20,00%

40,00%

60,00%

80,00%

100,00%

% Use of SPP criteria (€)

3 types of action necessary 1) Use of SPP in framework contracts

Framework contracts: - Use of SPP criteria

- Monitoring on contract level Through influence (ENED ≠ contracting authority)

Page 15: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 15 │ │

99,50% 100,00%

38,66%

78,32%

100,00%

33,30%

0,00%

70,39%

7,25% 9,92%

40,50%

12,13%

0,00%

20,00%

40,00%

60,00%

80,00%

100,00%

% Use of SPP criteria (€)

3 types of action necessary 2) Talk to procurers on SPP

Talk to procurers: - Use of SPP criteria - Use of framework contracts (if sustainable)

Page 16: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 16 │ │

3 types of action necessary 3) Improve reporting

81,79%

42,71%

0,00%

20,00%

40,00%

60,00%

80,00%

100,00%

% of wrong project codes

Margin of error (in €)

Form not used (< €8.500) Form used (≥ €8.500)

Form not used (handwritten reporting) - Short term: talk to procurers (december 2015) - Long term (2017): mandatory digitalisation

Unclear productgroup descriptions - Change descriptions Done in november 2015 First results are positive

Page 17: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 17 │ │

0,01% 0,13% 0,22% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32%

76,01%

0,00%

10,00%

20,00%

30,00%

40,00%

50,00%

60,00%

70,00%

80,00%

% within indicator % SPP_€

Prioritise your actions

• Time is limited: prioritise your actions!

0,0064% 76,01%

Page 18: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 18 │ │

Conclusions

Page 19: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 19 │ │

Conclusions on SPP monitoring

• SPP monitoring is important: → To check weather you’ve reached your goal (results) → To improve the system (actions) Improve the monitoring Improve the (knowledge and availability of) SPP criteria

• Every system has it’s downsides – Think about why and what you want to monitor

Page 20: Monitoring of SPP · Done in november 2015 First results are positive . May 11,2016 │17 0,01% 0,22%0,13% 0,38% 0,51% 0,70% 1,23% 3,77% 3,98% 4,74% 8,32% 76,01% 0,00% 10,00% 20,00%

May 11,2016 20 │

Team Interne Milieuzorg Els Verwimp

Tel. 02 553 27 72 E-mail: [email protected]