    SUBJECT:- MONTORING REPORT REGARDING " CONSTRUCTION/IMPROVEMENT

    OF JUDICIAL LOCKUP (BAKSHI KHANA) IN KHYBER PAKHTUNKHWA

    ADP NO!#/$$%&''/%$#-$&

    SUB HEAD: - JUDICIAL LOCKUP IN DISTRICT SESSIONS COURT BUNER

    S/No Analysis and recommendation Replies

    1 The work which were going to be executed in the

    sub- scheme were invited and advertised through

    tenders in the only one o the local !ashto

    Newspaper "#ahdat$ dated %&th September %'1%

    which is against the rules( This should be

    advertised in at least two national dailies one in

    )nglish and other in *rdu as per !ublic

    !rocurement Rules %''+, !ara-% o Rule-1%( t is

    recommended that disciplinary action must be

    taken against all the relevant sta o the executing

    department or having such mismanagement andviolating the rules(

    The tender or the works were invited rom the

    bidders through !rint .edia and NT was

    submitted to normation epartment !eshawar

    or vide publicity under the Rules 0opy

    attached2( t was the normation epartment to

    ensure the proper advertisement o NT, and this

    oice has no involvement in its publication as

    such(

    3owever, as per Advertisement 4ill submitted to

    this oice by inormation epartment, the sub5ect

    NT was published in 6-No News !aper 0opy oAdvertisement 4ill and News !aper attached2(

    %- !roper 7uality test o the construction material and

    satisactory results gives surety o the designed

    strength and lie o the structure( 8n site when

    monitoring team asked or the material test record,

    no any record were ound with the department

    which makes the 7uality o the construction

    material 7uestionable( t is recommended or the

    executing agency to have proper material test

    record, also provide a copy to the monitoring team(

    9aboratory test are being carried in routine or

    every work along-with ield tests and visual

    examinations o the material( All the necessary

    tests have been done and record is available or

    veriication( The test reports were not available at

    site and instruction has been issued to ield sta

    to maintain separate ile or all laboratory test at

    site and copies thereo will be available to .:)

    at site in uture(;- -t rom outside

    and &(6-t rom inside which is as per approved

    scope and allocated unds( The scheme has also

    been handed over to istrict ?udiciary and height

    o wall may be increased i desired by the istrict

    ?udiciary sub5ect to provision o additional unds(

    )@)*T) )NBN))R S*4 S8NA9 8