VC117 February 2009 Jean-Sébastien Graulich Slide 1 MOM Report MOM Report o Yagmur Torun (June 15 - July 14) o J.S. Graulich (July 13 - August 7) Jean-Sebastien Graulich, Geneva

description

MOM Report. Jean-Sebastien Graulich, Geneva. Yagmur Torun ( June 15 - July 14) J.S. Graulich ( July 13 - August 7). Summary. Encouraging and visible progress in the hall Air conditioning operational DK Solenoid cool down started Electrical Installation Painting - PowerPoint PPT Presentation

Transcript of MOM Report

Page 1: MOM Report

VC117 February 2009 Jean-Sébastien Graulich Slide 1

MOM ReportMOM Report

o Yagmur Torun (June 15 - July 14)

o J.S. Graulich (July 13 - August 7)

Jean-Sebastien Graulich, Geneva

Page 2: MOM Report

SummarySummary

Encouraging and visible progress in the hallEncouraging and visible progress in the hall Air conditioning operational DK Solenoid cool down started Electrical Installation Painting Magnet cooling water on. Soak test scheduled for next

week TOF1, KL and BPM back in place

One Big QuestionOne Big Question Will the target be ready in time

One focus pointOne focus point ISIS shut down: August 13 to September 15

Not much more to sayNot much more to say So I have included many pictures…

VC117 February 2009 Jean-Sébastien Graulich Slide 2

Page 3: MOM Report

R78R78

I have tried to tidy upI have tried to tidy up Please CooperatePlease Cooperate

No more tools stored in the office Individual paper trays

VC117 February 2009 Jean-Sébastien Graulich Slide 3

Page 4: MOM Report

Hall ProgressHall Progress

Electrical installation (see Andy’s Electrical installation (see Andy’s talk)talk)

Nearly finished Fiat Lux

VC117 February 2009 Jean-Sébastien Graulich Slide 4

Page 5: MOM Report

Hall ProgressHall Progress

PaintingPainting Mainly finished Hall clean and shiny

VC117 February 2009 Jean-Sébastien Graulich Slide 5

Page 6: MOM Report

DK SolenoidDK Solenoid

Cool down in progress (See Mike’s Cool down in progress (See Mike’s talk)talk)

VC117 February 2009 Jean-Sébastien Graulich Slide 6

Transfer line repaired

Cooling faster than in April

Pierrick provided an EPICS app to ease the readings

Page 7: MOM Report

DetectorsDetectors

Back in placeBack in place Still have to be aligned KL offset by 20 cm

due to the moving platform

VC117 February 2009 Jean-Sébastien Graulich Slide 7

TOF1

KL

BPM1

BPM2

Page 8: MOM Report

MagnetsMagnets

Water to the downstream magnets ONWater to the downstream magnets ON One leak on Q9 had to be fixed (pressure regulator

valve)

Chillers tend to go on AlarmChillers tend to go on Alarm Just because we are not enough demanding

(no heat load)

Marco Apollonio is preparing for soak testMarco Apollonio is preparing for soak test

VC117 February 2009 Jean-Sébastien Graulich Slide 8

Water flow is stable

Hall ProbeRe-discovered in R76

Page 9: MOM Report

TargetTarget

Shafts manufactured Shafts manufactured To be welded and coated

Power electronics Power electronics upgradedupgraded

New fibers pulled to MLCR

The decision to install it The decision to install it or not will be taken on or not will be taken on Aug 20Aug 20

VC117 February 2009 Jean-Sébastien Graulich Slide 9

Page 10: MOM Report

ControlsControls

Pierrick is working hard Pierrick is working hard to include the CAEN HV to include the CAEN HV power supplies in EPICSpower supplies in EPICS

VC117 February 2009 Jean-Sébastien Graulich Slide 10

Page 11: MOM Report

ConclusionConclusion

VC117 February 2009 Jean-Sébastien Graulich Slide 11

We are approaching the endWe are approaching the end Don’t stop now…