MOHD TALHA - RESUME (1)
Click here to load reader
-
Upload
mohammad-talha -
Category
Documents
-
view
109 -
download
0
Transcript of MOHD TALHA - RESUME (1)
Page 1 of 3
MOHD TALHA
I INDIA, ALIGARH – 202002 I [email protected] I +91 - 9719540040 I Passport No. K6605140 I I in.linkedin.com/pub/mohammad-talha/82/6a9/b45/ I
PROFESSIONAL QUALIFICATION
Uttar Pradesh Technical University, Lucknow (Under Its Affiliated Institute – Aligarh College Of Engi-
neering & Technology, Aligarh)
Bachelor Of Technology In Mechanical Engineering – 2015
Secured First Division Marks
Areas Of Specialization
Welding Metallurgy
Design Of Welded Joints
Project Management CAREER OBJECTIVE To undertake a challenging opportunity of Project Engineer / Project Planning Engineer / Project Control
Engineer in Oil & Gas Industry - EPCM where I can utilize my extensive knowledge, training & skills in plan-ning / scheduling / controlling / cost estimating / document controlling of all phases of projects lifecycle as per Project Management principles to ensure project completion within budget, on time and quality for the organiza-tion.
PROFESSIONAL TRAINING CERTIFICATIONS CADD Centre Training Services Pvt Ltd, New Delhi. (PMI’s Registered Education Provider No. 2738)
Oracle Primavera P6 – 8.2 (EPPM) & 56 PDUs of Project Management. (Jul 2014 – Sept 2014)
Aveva PDMS 12.0.SP4.10 – Process Plant Design & Management System. (Mar 2015 – May 2015)
PROJECTS UNDERTAKEN DURING TRAINING (OCT 2014 – FEB 2015)
Planning & Construction of Shah Deniz 2 (SD2) Project, Azerbaijan.
Conduct a study for the project (High Pressure Gas Condensate Field) facilities construction and associated
planned activities (Up to Level 2) for –
1. MODU Drilling & Completion Activities, Onshore Construction & Commissioning of Terminal Facilities,
Onshore Construction & Commissioning of Offshore and Subsea Facilities.
2. Platform Installation, Hook Up & Commissioning, Installation, Hook Up & Commissioning of Subsea Ex-
port and MEG Pipelines, Subsea Infrastructure Installation, Hook Up & Commissioning.
Planning & Construction of South Caucasus Pipeline Expansion (SCPX) Project, Georgia.
Conduct a study for the project (Expansion of SCP Gas Pipeline) aboveground facilities construction and asso-
ciated planned activities (Up to Level 2) for –
1. Pipeline Design Concept & Route, Pipeline Construction.
2. Facilities Design Concept, Facilities Construction.
3. Commissioning of Facilities, Reinstatement.
Page 2 of 3
Planning & Construction of Arrow LNG Plant Project, Curtis Island, Australia.
Conduct a study for the project (Intended to Commercialize Coal Seam Gas Reserves in the Surat and Bowen
Basin) facilities construction and associated planned activities (Up to Level 2) for –
1. LNG – Plant & Utilities, Ancillary facilities, Jetty & Mooring facilities, Mainland launch site, Material
offloading facility & Personal jetty, Construction schedule and Workforce, Early works, Plant Storage
Tanks and Jetty Construction, Rehabilitation, Construction Shipping and Ferry Movements, Commission-
ing.
2. FEED GAS PIPELINE – Pipeline Route & Design Concept, Control and Protection Systems, Construction
Schedule and Workforce, Port Curtis Crossing Method, Pipeline Construction Method & Its Activities,
Commissioning.
3. DREDGING – LNG Plant Dredging & Its Methods, Capital Dredging Locations.
Detailed Engineering Design Project (DEDP) Workflow in Oil & Gas Industry – EPCM.
Conduct a study that highlights the key deliverables throughout the lifecycle of a typical Detailed Engineering
Design Project. Identified the sequential flow of work and detailed description of 7 phases of DEDP –
1. Scope Definition and Engineering Execution Strategy.
2. Commencement of Detailed Design.
3. Initial Design Development and Hazard Identification.
4. Initial Design Review & Audit.
5. Approval for Design (AFD).
6. Approval for Construction (AFC).
7. Design Close-Out.
Hierarchical Coding Structure for All Phases of Oil & Gas Facilities / Project Lifecycle.
Conduct a study of following three individual hierarchical coding structures independent / irrespective of pro-
ject specific area / module / sub-project, each having separate and different purpose –
1. PBS – Physical Breakdown Structure.
This hierarchical coding structure defines the physical / functional component of Oil & Gas Projects / Facil-
ities during any development phase.
2. SAB / ABS – Standard Activity Breakdown / Activity Breakdown Structure.
This hierarchical coding structure provides a timescale attribute to express when during the project lifetime,
expenditures and activities occur.
3. COR / COA – Code of Resource / Code of Account.
This hierarchical coding structure classifies all project resources and categorises resources according to
primary, secondary and tertiary levels of resources.
STRENGTH AND SKILLS Excellent analytical mind-set with strategic thinking skills and the ability to interpret complex data plans, engineer-
ing design & drawings.
High level presentation, writing, interpersonal, written and verbal communication skills with the ability to consult
with people at all levels.
Strong leadership skills with the ability to supervise, lead, motivate, train and manage team members.
Promote positive change, inspires great thinking and produces effective results with honesty and care.
Computer literate with experience in using Software like Primavera P6 – 8.2, PDMS 12 SP4.10, MS Project, MS
Office and PC Windows Applications, Email & Internet.
STUDENT MEMBERSHIP SOCIETY OF PETROLEUM ENGINEERS (Projects, Facilities & Construction Discipline).
Membership No. 4148027.
Regular reviewer of Oil and Gas Facilities (Bi-Monthly Magazine) & Technical Papers.
Page 3 of 3
PERSONAL DETAILS Date of Birth – 20
th Jan 1990
Marital Status – Unmarried
Language Skills – English, Urdu & Hindi
Address – Hamdard Nagar – B, Jamalpur, Aligarh 202002 (U.P.) India
Declaration – I hereby declare that all the details furnished above are true to the best of my knowledge and belief.
MOHD TALHA Dated – 27th Nov 2014