Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange...
Transcript of Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange...
![Page 1: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/1.jpg)
Mohammad AlauddinDeputy Secretary
Power Division
Ministry of Power, Energy & Mineral Resources
Govt. of the People’s Republic of [email protected]
December 19, 2013
![Page 2: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/2.jpg)
December 19, 2013
Total area of about 147,570 sq. km
Between 20°34΄ & 26°38΄ North
Latitude 88°01΄ & 92°41΄ East
Longitude
Population of 153.6 million with a
growth rate of 1.37% [2011]
GDP per capita US$ 838 (FY 2012-13 )
GDP Growth Rate 6.03
Source : Bangladesh Economic Review 2013.
![Page 3: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/3.jpg)
Power Sector: At a Glance
3
Installed Capacity (MW) 10213
Electricity Growth 9% (FY-2013);12 % (FY-2012)
Max. Generation (MW) 6,675[12 July 13]
Total Consumers (Million) 14.2
Transmission Lines (ckt km) 9, 300
Distribution Lines (km) 2,90,000
Per Capita Generation (kWh) 321
Access to Electricity 62%[including 7% RE]
Source : Bangladesh Power Development Board[BPDB]
![Page 4: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/4.jpg)
Present Generation Capacity (November’13)
4
S
L
Source Installed Generation Capacity (MW) Sector
1. BPDB 4186 Public
58%
2. APSCL 777
3. EGCB 622
4. NWPGCL 300
5. RPCL 77
Subtotal 5,962
1. IPPs 1655 Private
42%2. 15 YR. Rental 167
3. 3/5 YR. Rental 1929
4. Power Import 500
Subtotal 4,251
Total 10,213
Source : BPDB
![Page 5: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/5.jpg)
December 19, 2013
88
3
68
1
1,0
31
1,2
02
1,2
56
1,3
87
1,5
38
1,8
17
2,0
16
2,2
36
2,5
29
2,8
85
3,2
61
3,7
68
4,3
02
4,5
60
5,3
08
6,2
14
6,7
59
7,3
45
7,8
57
8,4
50
8,7
46
9,2
95
10
,26
6
10
,90
1
11
,24
3
12
,19
4
13
,63
8
14
,73
9
16
,25
5
17
,44
5
18
,45
8
20
,30
2
21
,40
8
22
,97
8
23
,26
8
24
,94
6
26
,53
3
29
,24
7
31
,35
5
35
,11
8
38
,22
9
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,0001
97
0-7
1
19
72
-7
3
19
74
-7
5
19
76
-7
7
19
78
-7
9
19
80
-8
1
19
82
-8
3
19
84
-8
5
19
86
-8
7
19
88
-8
9
19
90
-9
1
19
92
-9
3
19
94
-9
5
19
96
-9
7
19
98
-9
9
20
00
-0
1
20
02
-0
3
20
04
-0
5
20
06
-0
7
20
08
-0
9
20
10
-1
1
20
12
-1
3
Net Energy Generation in GWh
Net Generation in Bangladesh
Source : BPDB
![Page 6: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/6.jpg)
c
10,000MW
20,000MW
30,000MW
2010
Gas82%
Oil 9%
Coal 5%
Installed Capacity 7300 MW
2021
Gas55%
Installed Capacity 24000 MW
Coal 20%
Others 15%
Oil 10%
Source: Power Sector Master Plan[PSMP] 2010
2030
Installed Capacity38,700 MW
Coal50%
Oil 10%
Others 15%
“Others” including
Renewable Energy
Gas25%
![Page 7: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/7.jpg)
Sl. No. Sources
Capacity(MW)
Probable Location (s)
1Domestic Coal Imported Coal
11,250 8,400
North West Region at Mine MouthChittagong and Khulna
2Domestic Gas/LNG
8,850Gas -Near Load Centers
LNG- Near Coastal Area
3 Nuclear 4,000 Rooppur
4 Regional Grid 3,500
Bahrampur - Bheramara, Silchar -Fenchuganj, Purnia-Bogra-Bongaigaon, Myanmar - Chittagong
5Others (Oil, Hydro & Renewable)
2,700Near Load Centers
Total 38,700
Primary Fuel Sources by 2030
Source: PSMP 2010
![Page 8: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/8.jpg)
Fuel Diversity & Sustainable Supply of Fuel
Private Sector Participation
Harnessing Renewable Energy Resources
Demand Side Management (DSM) & Energy
Efficiency Improvement Program
Regional Co-operation on Cross Border Power Trade
December 19, 2013
![Page 9: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/9.jpg)
FENCHUGANJ
SILCHARFENCHUGANJ
BHERAMARA
BAHARAMPUR
BAHARAMPURBHERAMARA
PURNEABARAPUKURIA
Possible Regional Grid Interconnection
MYANMARCHITTAGONG
BONGAIGAONBARAPUKURIA
500MW [2013-]
500MW [2018-]
![Page 10: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/10.jpg)
MoU on 11.01.2010 for co-operation in power sector.
Grid Connectivity
Exchange of Power
Joint Technical Team proposed an interconnection
between Bheramara & Baharampur. Establishment of
400 KV, 100 km double circuit line & back-to-back
HVDC station at Bheramara.
10
Bangladesh-India Grid Interconnection
![Page 11: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/11.jpg)
December 19, 2013
![Page 12: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/12.jpg)
Main Components (BD part)
i) 27.35 km 400 kV double circuit transmission line
ii) 400 kV Back-to-Back HVDC station at Bheramara
iii) 4.5 km LILO of double circuit Ishurdi-Khulna
230kV line at Bheramara.
Main Components (Indian part)
i) 73.5 km 400 kV double circuit transmission line
ii) 400 kV switching station at Baharampur.
December 19, 2013
![Page 13: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/13.jpg)
Project Cost (BD part)
i) F. E = Tk 910.71 Crore[111.06 Million USD] (ADB)
ii) L. C = Tk 669.12 Crore (GoB+PGCB)
Total =Tk 1,579.83 Crore
Project Cost (Indian part)
Total = Rs 160.32 Crore
December 19, 2013
![Page 14: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/14.jpg)
400 kV Transmission Line (BD Part)
Contract Signed : 30-Dec-2010
Contractor : Cobra, Spain
Consultant : PGCIL, India
Target of Completion : May, 2013
Actual Completion : 30th June, 2013
Line Energization : 30th August, 2013
December 19, 2013
![Page 15: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/15.jpg)
Back-to-Back HVDC Station
Contract Signed : March 29, 2011
Target of Completion : July, 2013
Test Power Flow : September 27, 2013
Inauguration : October 5, 2013
COD for 175 MW : October 5, 2013
COD for 500 MW: December 4, 2013
December 19, 2013
![Page 16: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/16.jpg)
PPA 1 : 250 MW (25 yrs. with delivery starting 2013)
NVVN (NTPC trading arm) signed a PPA with BPDB
in February 28, 2012.
Round the clock power supply.
Power allocation by GoI from discretionary share of
NTPC projects.
Tariff at regulated rate + trading margin + wheeling
costs
16
PPA
![Page 17: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/17.jpg)
PPA 2 : 250 MW (3 yrs. with delivery starting in 2013)
PTC India Ltd. signed a PPA with BPDB in
November 14, 2013.
Round the clock power supply.
Tariff= Non-escalable capacity charge + Non-
escalable energy charge
17
PPA
![Page 18: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/18.jpg)
Expand energy development beyond boundaries.
Link potential sources to markets.
Facilitate investment to serve a regional market
Lower operational costs & improve the supply mix.
Address demand supply imbalance & improve
reliability of supply
Eventually contributes towards development of an
Asian “energy highway.”
![Page 19: Mohammad Alauddin · MoU on 11.01.2010 for co-operation in power sector. Grid Connectivity Exchange of Power Joint Technical Team proposed an interconnection between Bheramara & Baharampur.](https://reader033.fdocuments.in/reader033/viewer/2022042114/5e90c8be191c2066330a36e4/html5/thumbnails/19.jpg)