Page 1 of 3 Data Date 12-Dec-2016 Mohammed Ibrahim Anwar Saudi Arabia Riyadh; Cell Phone: +966 (0) 598368690; E-mail: [email protected] SUMMARY: More than (10) years of extensive experience as a planning engineer within large-scale construction projects. Involved on planning, controlling, and monitoring. Bachelor of Architecture Engineering Department Tanta University. With different complexity and interference of activities and resources allocation within aggressive time constraints, to meet project schedule and budget, performing the schedule variance analysis during the schedule monitoring process and participating in the preparation of claims & variation orders, providing supportive detailed analysis for time extensions. Expert using Oracle Primavera, PCM, Microsoft Excel, and very good in Microsoft Project & AutoCAD and Photoshop. EXPERIENCE: May 2015-Present Saudi Constructioneers, Riyadh Saudi Arabia. Project Name: Al Rimal Gated Community Position: Senior Planning Engineer Project Description: Buildings Built on 601,461m² and consists of 428 villas, 91 Apartment Buildings, Furnished Apartments building, Recreational and Commercial facilities. Total buildup area is 230,972m². Contract Value: 1,579,803,500 SR. Swimming Pools: 50 + and Jacuzzi: 5 + Fountains: 12 + Tenant Parking: 1316 + Public Parking: 696. Job Role: Being Part of the planning department is a real challenge for me. The project involves too many parties from different cultures starting with the designer office from KSA, Our role as a planning department of the main contractor is to coordinate with all different parties, and create a project management plan to the project client and as per the following: Detailed time schedule using Primavera 6, Cost and Resource loaded. Cost loading sheets using Microsoft Excel. Manpower loading sheets using Microsoft Excel. Shop drawings tracking log, Excel sheets linked to Primavera activities. Materials procurement tracking, Excel sheets linked to Primavera activities. Productivity rates monitoring. Weekly/Monthly client and senior management progress reports. Achievements: The main achievement for the planning department in this project represented by the successful coordination and the tangible support to the project team. In addition to the project primavera detailed schedule, we created an Excel sheet called Mini Schedules” for every Engineer on the project. The Mini schedule represents a further breakdown to the primavera activities for the Engineer tasks, and it able to calculate the planned values, planned man-days, planned percentages, draw bar chart, and histograms for weekly quantities, manpower, and productivity rates. As a result, we have a detailed record for the project and effective method to export the updates to primavera directly. Planning Engineer / Senior Planning Engineer

Transcript of Mohamed Ibrahim-Planning Engineer

Page 1: Mohamed Ibrahim-Planning Engineer

Page 1 of 3

Data Date 12-Dec-2016

Mohammed Ibrahim Anwar

Saudi Arabia – Riyadh; Cell Phone: +966 (0) 598368690; E-mail: [email protected]

SUMMARY:

More than (10) years of extensive experience as a planning engineer within large-scale construction

projects. Involved on planning, controlling, and monitoring. Bachelor of Architecture Engineering

Department – Tanta University. With different complexity and interference of activities and resources

allocation within aggressive time constraints, to meet project schedule and budget, performing the schedule

variance analysis during the schedule monitoring process and participating in the preparation of claims &

variation orders, providing supportive detailed analysis for time extensions. Expert using Oracle Primavera,

PCM, Microsoft Excel, and very good in Microsoft Project & AutoCAD and Photoshop.

EXPERIENCE:

May 2015-Present Saudi Constructioneers, Riyadh – Saudi Arabia.

Project Name: Al Rimal Gated Community

Position: Senior Planning Engineer

Project Description: Buildings Built on 601,461m² and consists of 428 villas, 91 Apartment Buildings, Furnished

Apartments building, Recreational and Commercial facilities. Total buildup area is 230,972m².

Contract Value: 1,579,803,500 SR. Swimming Pools: 50 + and Jacuzzi: 5 + Fountains: 12 +

Tenant Parking: 1316 + Public Parking: 696.

Job Role: Being Part of the planning department is a real challenge for me. The project involves too many

parties from different cultures starting with the designer office from KSA, Our role as a planning

department of the main contractor is to coordinate with all different parties, and create a project

management plan to the project client and as per the following:

Detailed time schedule using Primavera 6, Cost and Resource loaded.

Cost loading sheets using Microsoft Excel.

Manpower loading sheets using Microsoft Excel.

Shop drawings tracking log, Excel sheets linked to Primavera activities.

Materials procurement tracking, Excel sheets linked to Primavera activities.

Productivity rates monitoring.

Weekly/Monthly client and senior management progress reports.

Achievements: The main achievement for the planning department in this project represented by the successful

coordination and the tangible support to the project team. In addition to the project primavera

detailed schedule, we created an Excel sheet called “Mini Schedules” for every Engineer on the

project. The Mini schedule represents a further breakdown to the primavera activities for the

Engineer tasks, and it able to calculate the planned values, planned man-days, planned

percentages, draw bar chart, and histograms for weekly quantities, manpower, and productivity

rates. As a result, we have a detailed record for the project and effective method to export the

updates to primavera directly.

Planning Engineer / Senior Planning Engineer

Page 2: Mohamed Ibrahim-Planning Engineer

Page 2 of 3

Jan 2012-Feb-2015 Saudi Constructioneers, Riyadh – Saudi Arabia.

Project Name: King Abdullah Financial District (KAFD) Conference Center

Position: Senior Planning Engineer

Project Description: KAFD Conference Center is a land mark project located in the new King Abdullah Financial

District in Riyadh, built up area is 128,000 m2, having original contract project value 755 ml.

S.R for the finishes, MEP, and mega roof scope of works. Project scheduling software is

Primavera P6 and PCM on behalf of project owner Rayadah Investment Company, under project

manager Hill International.

Project Website: http://www.som.com/projects/kafd_conference_center

Job Role: Being Part of the planning department is a real challenge for me. The project involves too many

parties from different cultures starting with the designer office from USA, Façade subcontractor

from Italy, MEP subcontractor from Lebanon, Steel Structure subcontractor from Jordan, and

other local subcontractors from Saudi Arabia. Our role as a planning department of the main

contractor is to coordinate with all different parties, and create a project management plan to the

project client as per Hill International standards, and as per the following:

Detailed time schedule using Primavera 6, Cost and Resource loaded.

Cost loading sheets using Microsoft Excel.

Manpower loading sheets using Microsoft Excel.

Shop drawings tracking log, Excel sheets linked to Primavera activities.

Materials procurement tracking, Excel sheets linked to Primavera activities.

Productivity rates monitoring.

Weekly/Monthly client and senior management progress reports.

Achievements: The main achievement for the planning department in this project represented by the successful

coordination and the tangible support to the project team. In addition to the project primavera

detailed schedule, we created an Excel sheet called “Mini Schedules” for every Engineer on the

project. The Mini schedule represents a further breakdown to the primavera activities for the

Engineer tasks, and it able to calculate the planned values, planned man-days, planned

percentages, draw bar chart, and histograms for weekly quantities, manpower, and productivity

rates. As a result, we have a detailed record for the project and effective method to export the

updates to primavera directly.

May 2008-Dec 2011 MOBCO FOR CIVIL CONSTRUCTION, Madinah – Saudi Arabia.

Project Name: HOTEL APPARTEMENT IN Makka, Saudi Arabia

Position: Planning Engineer

Project Description: Construction of 3000 room hotel apartments in Makka and it is consist of 5 Towers (Structure)

each building has 4 basement and 30 floors, having project value of 250 ml. S.R, on behalf of

owner Naseel Holding Company. Under consultant of ABC, using software Primavera P6.1.

Job Role: I was the project planner, responsible for creating project master and detailed time schedules,

prepare the overall payment certificate based on primavera earned value to the client. Prepared

and secured the client approval of an EOT due to design changes and rework. Prepared the

monthly / weekly progress reports and represented the main contractor in front of the client

weekly progress meetings.

Project Name: HOTEL APPARTEMENT IN Medina, Saudi Arabia

Position: Technical Office & Planning Engineer

Page 3: Mohamed Ibrahim-Planning Engineer

Page 3 of 3

Project Description: Turnkey construction of 500 room hotel apartments in Medina PLOT (5030,5029) and it is

consist of 2 Towers each building has 2 basement and 10 floors having project value of 65 ml.

S.R. Contract includes Civil works, architectural works, finishing works, MEP works.

Job Role: Performed quantity surveying for the project finishes and landscape works, reviewed

subcontractors payments against actual quantities. Prepared time schedule for project (Civil,

Arch, and MEP). Supervised the construction of the Towers (finishing).

Project Name: HOTEL APPARTEMENT IN Medina, Saudi Arabia

Position: Technical Office & Planning Engineer

Project Description: Turnkey construction of 390 room hotel apartments in Medina PLOT (3077,3078,3080) and it is

consist of 3 Towers each building has 2 basement and 10 floors having project value of 78 ml.

S.R. Contract includes Civil works, architectural works, finishing works, MEP works.

Job Role: Performed quantity surveying for the project finishes and landscape works, reviewed

subcontractors payments against actual quantities. Prepared time schedule for project (Civil,

Arch, and MEP). Supervised the construction of the Towers (finishing).

OTHER EXPERIENCE IN EGYPT

Working with Cad group as a designer for one year (1/10/2000)-(1/10/2001)

Working in Al-Esraa construction as supervisor in many sites for 4 years (1/2/2002) – (1/2/2006).

Working in Moharam Bakhom Consult Group for 6 months as supervisor in Kafr El-zayat.

Working in Kibaa construction group in many projects as designer & drafting.

Working in El-Mohandes El-masry company at Madint nasr-cairo As a designer & Planning Engineer (1/8/2006 -2008)

PERSONAL INFORMATION:

Date of Birth: 8th.Sep. 1982

Nationality: Egyptian.

Language Skills: Arabic and English Excellent

Marital Status: Married, and have two kids.

LinkedIn Profile: sa.linkedin.com/pub/mohamed-anwar/65/669/51/