Module: TPM

Transcript of Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations....

Page 1: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Module: TPM

Page 2: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Target Audience :

Engineering, Maintenance, Facilities, Procurement, Operations.

Purpose of Module :

To understand & implement the techniques of effective maintenance to minimise Life Cycle Cost.

Aims & Objectives :• Relate to TPM/OEE/Autonomous Maintenance• Planned Maintenance • Preventative Maintenance• Predictive Maintenance• Design of effective maintenance strategy• Understand how to work with historical analysis

Aims and Objectives

Page 3: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

• Introduction

• TPM Overview

• Effective Maintenance Overview

• Planned Maintenance

• Preventative Maintenance

• Predictive Maintenance

• Breakdown Maintenance

• Effective Equipment Design

Contents

Page 4: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Total Productive Maintenance

OVERVIEW

Page 5: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Imp

rove

men

t A

ctiv

itie

s

Pla

nn

ed M

ain

ten

ance

Au

ton

om

ou

s M

ain

ten

ance

Ed

uca

tio

n &

Tra

inin

g

Mai

nte

nan

ce P

reve

nti

on

Continuous Improvement

Systematic Elimination of Waste

What is Total Productive Maintenance (TPM)?

Page 6: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

??????What is Total Productive Maintenance (TPM)?

• A system of maintenance covering the entire life of the equipment and the total human resource.

• TPM is a tried and tested way of eliminating waste, saving money and making factories better places to work.

• It gives operators the knowledge and confidence to manage their own machines.

• TPM is a long term process to increase skills, raise efficiency and achieve zero losses.

Maintenance of normal conditions / Early discovery of abnormalities / Prompt response Maintenance of normal conditions / Early discovery of abnormalities / Prompt response

Page 7: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

??????What are the benefits of TPM?

Maintenance of normal conditions / Early discovery of abnormalities / Prompt response Maintenance of normal conditions / Early discovery of abnormalities / Prompt response

• TPM refuses to accept that machine inevitably fail.

• TPM reduces the total life-cycle costs of equipment.

• TPM simply reminds us that every time a machine fails, something could have been done to prevent it.

• Gradually the operator’s become maintainers.

• Gradually the maintainers become improvers.

• TPM develops the five senses, as well as technical skills.

Page 8: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Available time

Available operating time

Actual operatingtime

Effective operating time

Breakdowns1

Setup / adjustment2

Idling / minor stoppages3

Speed4

Defects in process and rework5

Start up losses6

Equipment Six Big Losses

Loss Elimination through TPM?

Page 9: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

??????What is Effective Maintenance?

Maintenance of normal conditions / Early discovery of abnormalities / Prompt response Maintenance of normal conditions / Early discovery of abnormalities / Prompt response

• PLANNED MAINTENANCE

“ The scheduling of maintenance activities on a time based or usage basis regardless of the current performance levels of the equipment”

• PREVENTATIVE MAINTENANCE

“ A systematic approach to eliminate catastrophic failure/breakdowns through regular care and attention, early diagnosis and rectification”

• PREDICTIVE MAINTENANCE

“ A systematic approach utilising history and equipment condition monitoring to predict and preventprevent catastrophic failure/breakdowns ”

Page 10: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

??????Maintenance of normal conditions / Early discovery of abnormalities / Prompt response Maintenance of normal conditions / Early discovery of abnormalities / Prompt response

• BREAKDOWN MAINTENANCE

“ When all else fails ensuring that equipment availability is achieved in the shortest possible time whilst eliminating root cause faults with sustainable repairs”

• EFFECTIVE EQUIPMENT DESIGN

“ A systematic approach to equipment design which maximises equipment availability, minimises life cycle costs and eliminates waste”

What is Effective Maintenance?

Page 11: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

??????What is Autonomous Maintenance?

• An operator skills development programme.

• Allows problems to be identified and solved quickly.

• Stops accelerated deterioration of plant and equipment.

• An approach to stop deterioration related failures.

• Stabilises equipment conditions (standards).

• Develop training materials on how to run, operate & maintain equipment.

Maintenance of normal conditions / Early discovery of abnormalities / Prompt response Maintenance of normal conditions / Early discovery of abnormalities / Prompt response

Page 12: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

???What is Overall Equipment Effectiveness (OEE)?

• Overall Equipment Effectiveness (OEE) is a total measure of performance that relates the availability of the process to the productivity and quality.

• OEE is the Key Performance Indicator (KPI) for TPM.

• OEE will measure the impact of change on a process caused by eliminating process, or equipment losses.

• A World Class Company should achieve 85% OEE on key equipment (typical operation between 40 to 60%).

Maintenance of normal conditions / Early discovery of abnormalities / Prompt response Maintenance of normal conditions / Early discovery of abnormalities / Prompt response

Page 13: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

??????What is Quick Changeover?

• Quick Changeover is a method of analysing and reducing the time needed to change a process from producing one good part to producing the next good part part.

• It is a driver for standardisation.

• It is one of the 6 Big Losses.

• Quick changeovers are an enabler for flow.

• Often referred to as “Single Minute Exchange of Die” (SMED).

Maintenance of normal conditions / Early discovery of abnormalities / Prompt response Maintenance of normal conditions / Early discovery of abnormalities / Prompt response

Page 14: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

What will TPM do for our business?

IMPROVE PLANT AND EQUIPMENT

IMPROVE CORPORATE CULTURE

IMPROVE HUMAN RESOURCES

Page 15: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Maintenance

Preventative Maintenance

Predictive Maintenance

Planned Maintenance

Breakdown Maintenance

Effective Equipment Design

INFORMATION

TRAINING

AUTONOMOUS MAINTENANCE MAINTENANCE

Page 16: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Maintenance

Is :-

“ Zero Breakdowns”

Is not :-

“ Repairing equipment as quickly and efficiently as possible when it breakdowns“

Page 17: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Maintenance

• Introducing an Effective Maintenance system is not a “quick fix”.

• Effective Maintenance should involve all areas of the organisation.

• Information is key.

• Operator and Maintainer training

– Up-skill Maintenance to be trainers and equipment improvers

– Up-skill Operators to be equipment maintainers

P

D

A

C

Plan

DoCheck

Act

Page 18: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Autonomous Maintenance

• Definition:- conditions and halting further deterioration”

“The partnership of Production and Maintenance departments to accomplish a common goal,

stabilising equipment conditions and halting further deterioration”

Page 19: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Autonomous Maintenance

• Operator skills development programme.

• Allow problems to be identified and solved quickly.

• Stop accelerated deterioration of plant and equipment.

• An approach to stop deterioration related failures.

• Stabilise equipment conditions (standards).

• Develop training materials on how to run, operate & maintain equipment.

Page 20: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

Preventative Maintenance

Predictive Maintenance

Planned Maintenance

Breakdown Maintenance

Effective Equipment Design

INFORMATIONINFORMATION

TRAININGTRAINING

AUTONOMOUS MAINTENANCEAUTONOMOUS MAINTENANCE

Planned Maintenance

Page 21: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

• Definition:-

“The scheduling of maintenance activities on a time based or usage basis regardless of the

current performance levels of the equipment”

Page 22: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

• Planned Maintenance as part of an Effective Maintenance system takes time and to be effective has to be “a way of life”.

• Planned Maintenance can make or break the relationship between production and maintenance functions.

• Partnership is the key.

• The schedule and time required should be both sympathetic to production needs and be effective.

• Key elements should be Lubrication Control and Spare Parts Management.

Page 23: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

No.

of

Bre

akdo

wns

Time

Planned Checking &

Replacement

Autonomous Maintenance

Factory Wide PM System

Predictive Maintenance

Zero Breakdown

Page 24: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

• Evaluation of equipment and knowledge of existing conditions.

• Restore equipment condition and improve weaknesses.

• Creating an information management system.

• Creating and maintaining a Planned Maintenance system.

STEPS TO INTRODUCTION

Page 25: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

• Identify critical machines - Bottlenecks.

• Existing machine maintenance records?

• Combine with Autonomous Maintenance activities.

• Criticality Assessment.

• Existing Overall Equipment Effectiveness (OEE) data.

• Initial equipment survey.

EVALUATION OF EQUIPMENT & KNOWLEDGE OF EXISTING CONDITIONS

Page 26: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Avai

labi

lity

Perfo

rman

ceQ

ualit

yR

elia

bilit

yM

aint

aina

bilit

ySa

fety

Ran

k

Envi

ronm

ent

Cos

t

Tota

l

EQUIPMENT DESCRIPTION

No

Type:Machine:Date:

CRITICALITY ASSESSMENT

Planned Maintenance

Page 27: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

• AVAILABILITY

– If this failed what would be the impact on running, set-up or adjustment.

• PERFORMANCE

– Impact on the cycle time or processing capacity.

• QUALITY

– Impact on start up or process.

• RELIABILITY

– Impact of this components failure rate.

• MAINTAINABILITY

– Ease of maintenance.

• SAFETY

– Impact if this failed or was in poor condition.

• ENVIRONMENT

– Impact on the environment.

• COST

– Impact if failed / cost to the business.

CRITICALITY ASSESSMENT

Planned Maintenance

Page 28: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

AREA CHECK FORDamage, dirt, dust, excess oil, splatter and foreign matter. Unnecessary objects on machine. Broken parts, loose or missing nuts, bolts etc. Wear and play of machine.

Damage, dirt, dust, excess oil, splatter and foreign matter.Broken parts, loose or missing nuts, bolts etc.Leaks of oil, air, gas, steam. Indicator lamps not working.

Dirt, dust, sludge. Proper lubrication levels.Lubricating devices capped?All lubrication pipes clean with no leaks.Are lubrication levels clearly visible?

Name plates and labels are clean and visible.Safety shields are free from dirt, dust & fog.Are pipe routings organised around machine? Check floor condition for rubbish & parts.Are good parts, rejects, scrap material clearly segregated.

Check safety devices for damage, malfunctioning or missing parts. Are there any obvious safety hazards or violations.

1. Main body of equipment

2. Ancillary Equipment

3. Lubrication

4. Housekeeping around machine

5. Safety

INITIAL EQUIPMENT SURVEY

Planned Maintenance

Page 29: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

CLEAN, CHECK & TAG

• Operator involvement with maintenance.

• Operators to “Tag” all elements of the equipment that they believe require improvement.

• Description of fault and effect on each tag (can be used in conjunction with a machine map).

• Maintenance to list and answer all tags, i.e. counter-measure and time-scales or reasons for not undertaking.

INITIAL EQUIPMENT SURVEY

Planned Maintenance

Page 30: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

MACHINE MAPPING

• Group exercise.

• Lead by an experienced

engineer/maintainer.

• Use in conjunction with “Tags”.

Tag 1

Tag 2

Tag 3

Tag 4

Tag 5

Tag 6

Tag 7

Tag 8

Tag 9

INITIAL EQUIPMENT SURVEY

Planned Maintenance

Page 31: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned MaintenanceINITIAL EQUIPMENT SURVEY

Clean, Check & Tag Issues RegisterCodeClass

W P Last Updated:WATER PNEUMATIC

1 2 3 4BROKEN MISSING DIRTY WORN

Code

Class

Check / Tag No.

6POOR DESIGN

5LEAKING

EELECTRICAL

MMECHANICAL

L

Customer Protection

LUBRICATIONH

HYDRAULIC

7DIFFICULT TO CLEAN

Countermeasure Cause Status Location Owner

COUNTERMEASURE PROPOSED COUNTERMEASURE AGREED PROBLEM SOLVED

REOCCURRENCE PREVENTED

Page 32: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

E M L H W P TOTAL

1

2

3

4

5

6

7

8

9

TOTAL

CODE CLASS

E = ELECTRICALM = MECHANICALL = LUBRICATIONH = HYDRAULICW = WATERP = PNEUMATIC

1 = BROKEN2 = MISSING3 = DIRTY4 = WORN5 = LEAKING6 = POOR DESIGN7 = DIFFICULT TO CLEAN

CONCERN / FAULT ANALYSIS

INITIAL EQUIPMENT SURVEY

Planned Maintenance

Page 33: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

Available time

Available operating time

Actual operatingtime

Effective operating time

Breakdowns1

Setup / adjustment2

Idling / minor stoppages3

Speed4

Defects in process and rework5

Start up losses6

Equipment Six Big Losses

OEE AND THE 6 BIG LOSSES

Page 34: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

• Through the evaluation of the equipment, initial survey and tagging exercise, return equipment to an improved standard.

• Define the standard and maintain it.

• Without undertaking initial improvement planned, preventative and autonomous maintenance activities will be less effective.

– Changes to machine conditions will not be clear

– Operators time will be wasted

– Planned Maintenance will take longer

RESTORE EQUIPMENT CONDTION AND IMPROVE WEAKNESSES

Page 35: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

• Set and maintain standards

Now you can see any problems

easily!

Now you can see any problems

easily!

Look at my shiny

machine

Look at my shiny

machine

Planned Maintenance

RESTORE EQUIPMENT CONDTION AND IMPROVE WEAKNESSES

Page 36: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

• Without information an effective maintenance system cannot function.

• Data is gathered to measure and improve performance.

• OEE is the key performance indicator for Effective Maintenance.

• Information should be gathered from :-

– OEE data collection (Operators)

– Autonomous Maintenance activities (Operators)

– Planned Maintenance Activities (Maintenance)

– Predictive Maintenance (Maintenance)

– Preventative Maintenance (Maintenance)

– Breakdowns (Maintenance)

CREATING AN INFORMATION MANAGEMENT SYSTEM

Page 37: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

CREATING (Plan/Do)

• Planned Maintenance should be mostly inspection - identify parts for immediate or future replacement, etc.

• Ensure timings for tasks to the schedule are realistic (buying off with production).

• Single Point Lessons (SPL) and training to support them.

• Ensure the schedule is visible to both Production and Maintenance.

CREATING AND MAINTAINING A PERIODIC MAINTENANCE SYSTEM

Page 38: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance Activities

Date: Items to be CheckedNo.

1234567891011

14

1213

15

Period

3 mth Hydraulic Pressure

M/c : Activity SPL

161718

Setting

8-10 PSI6 mth Replace - Work head Drive Belt 123-4

Planned Maintenance

Page 39: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

MAINTAINING (Check/Act)

• Check breakdown frequency between Planned Maintenance and adjust schedule and/or content accordingly.

• Check the results of Planned Maintenance and if items are continuously OK or always need replacing, adjust frequency.

• Always look to reduce time for a Planned Maintenance activity, identify items that can be checked in-process.

• Check information gained from OEE data collection.

CREATING AND MAINTAINING A PERIODIC MAINTENANCE SYSTEM

Page 40: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

Choose Model M/C in each Area

Monitor & Display Results

Implement on Model M/c

Horizontal Development

Continue To Check and Act

Develop Full PM

Frequency

Assign Duties

Data Collection

Predictive

CorrectiveLubrication Schedule

Spare Parts

Restore / Improve

Weaknesses

INTRODUCING

Gather Accurate Data

BreakdownsTime

Between Failures

Process Capability

Yield Downtime

Capacities

Page 41: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

• A frequently overlooked element which is a contributing factor in 70% of all hydraulic system failures.

• Should include activities across all disciplines.

• Minimising cost through rationalisation.

• Lubrication beyond scope of operators (as part of Autonomous Maintenance), i.e. expensive hydraulic oil.

• Does it need replacing? Analyse the condition, what does it tell you about the m/c? What is in it?

• Consider filters. Frequency of change? Level of filtration?

LUBRICATION CONTROL

Page 42: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

4 POINTS FOR LUBRICATION CHECKS

Change Oil after 2.0 point degradation......

Original Standard Change at this level

Do not mix oils

Check quantity of Oil Check quality of Oil

Avoid contamination

3.53.02.52.01.51.00.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0

LUBRICATION CONTROL - Example

Planned Maintenance

Page 43: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

BENEFITS

• Reduced friction > reduced wear > extends equipment life.

• Reduces accidents.

• Maintains accuracy.

• Maintains optimum process conditions.

• Reduces waste.

LUBRICATION CONTROL

Page 44: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Planned Maintenance

• Balance stock costs v disruption v achievable delivery.

• Consumable (wear parts) and Non-consumable.

• Modular Parts - easy to replace elements.

• Clearly identified condition of spares, i.e. anything taken off machines should be tagged (visual - red / amber / green)

SPARE PARTS MANAGEMENT

Scrap - Strip for spares, etc. Repair Required Ready to fit

Page 45: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Preventative Maintenance

Preventative Maintenance

Predictive Maintenance

Planned Maintenance

Breakdown Maintenance

Effective Equipment Design

INFORMATION

TRAINING

AUTONOMOUS MAINTENANCE

Preventative Maintenance

Page 46: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Preventative Maintenance

• Definition:-

“A systematic approach to eliminate catastrophic failure/breakdowns through regular care and attention, early diagnosis and rectification”

Page 47: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Preventative Medicine

Regular Check Ups

Daily Maintenance (Clean/Lubricate)

Inspection Diagnosis Preventive Repairs

Preventative Maintenance

Daily Health Care Early Treatment

ANALOGY

Preventative Maintenance

Page 48: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

• Maintain Operating Conditions.

• Prevent Accelerated Deterioration.

Preventative Maintenance

• Establish where abnormalities will occur without disassembling the equipment.

• Permits quality checks of repairs already made to overhauled equipment.

• Permit estimation of repair periods.

• Reduce maintenance costs by eliminating periodic overhauls.

Page 49: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Preventative Maintenance

• Deterioration accelerated by neglect.

• Interface with Autonomous Maintenance.

• Daily / weekly check lists.

• Single Point Lessons (SPL).

PREVENT ACCELERATED DETERIORATION

Page 50: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Preventative Maintenance

Date: Machine:Process:

Preventative Maintenance Check Sheet.Check no.

1

Activity : Freq.

Page 51: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

• Equipment “straining” to operate beyond its normal range because correct conditions not maintained.

• Ensure out of specification conditions are clearly visual or audible, i.e. red zones, level markers, buzzers, etc.

Preventative Maintenance

MAINTAIN OPERATING CONDITIONS

Page 52: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Predictive Maintenance

Preventative Maintenance

Predictive Maintenance

Planned Maintenance

Breakdown Maintenance

Effective Equipment Design

INFORMATION

TRAINING

AUTONOMOUS MAINTENANCE

Predictive Maintenance

Page 53: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Predictive Maintenance

• Definition:-

“A systematic approach utilising history and equipment condition monitoring to predict catastrophic failure/breakdowns ”

“A systematic approach utilising history and equipment condition monitoring to predict and and

preventprevent catastrophic failure/breakdowns”

Page 54: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Predictive Maintenance

• Sophisticated.

• Requires Planned and Preventative Maintenance systems in place.

• Identify point at which critical part fails.

• Common method is simply time or frequency based, i.e. no. of rev’s, no. of hours in service, etc.

• More sophisticated methods are condition based, i.e. temp. of oil, condition of oil, speed of operation.

• Links with Autonomous Maintenance, i.e. basic predictions based on visual and audible indications.

Page 55: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Predictive Maintenance

WHY?

• Predictive Maintenance should not be just a passive activity.

• Root cause problem solving - reduction or elimination.

Page 56: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Breakdown Maintenance

Preventative Maintenance

Predictive Maintenance

Planned Maintenance

Breakdown Maintenance

Effective Equipment Design

INFORMATION

TRAINING

AUTONOMOUS MAINTENANCE

Breakdown Maintenance

Page 57: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Breakdown Maintenance

• Definition:-

“When all else fails ensuring that equipment availability is achieved in the shortest possible time whilst

eliminating root cause faults with sustainable repairs”

Page 58: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

• Record repair work in sufficient detail.

• Problem solving techniques.

Breakdown Maintenance

• Take repair work beyond quick-fix measures.

• Always seek the root cause.

• Historical data.

• Single Point Lessons (SPL).

Page 59: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Breakdown Maintenance

SINGLE POINT LESSON (SPL) - Example

crews CRAFT T/L T/M T/M

1

2

3

4

LINEAREA/MACHINE

No

THEME

PREPARED BY DATE

BASICKNOWLEDGE

IMPROVEMENTCASES

TROUBLECASES

ONE POINT LESSON

Gauge needs to read between red markers within green zone.

Page 60: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Breakdown Maintenance

RECORD REPAIR WORK IN SUFFICIENT DETAIL

• Lost Time (pareto, OEE)

– Response time, On/Off

– Type of repair (mechanical / electrical)

• Spares Used (spare management)

– Description, part numbers, reason for failure

• Cause/Effect

– What the maintainer believes

• Conditions

– Conditions on equipment when it failed

Page 61: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Breakdown Maintenance

Big problems deserve attention

Page 62: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Breakdown Maintenance

PROBLEM SOLVING TECHNIQUES

• 5 Why’s.

• Pareto.

• Cause & Effect.

• Brainstorming - at the machine.

• Include operators - man/machine interface is critical.

Page 63: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Equipment Design

Preventative Maintenance

Predictive Maintenance

Planned Maintenance

Breakdown Maintenance

Effective Equipment Design

INFORMATION

TRAININGTRAINING

AUTONOMOUS MAINTENANCE

Effective Equipment Design

Page 64: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Equipment Design

• Definition:-

“A systematic approach to equipment design which maximises equipment availability, minimises life

cycle costs and eliminates waste”

Page 65: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

• Focus on reliability and maintainability.

Effective Equipment Design

• Establish design goals for new equipment.

• Incorporate TPM improvement activities.

• Involve the customer and suppliers.

• Use information derived from OEE data collection and maintenance activities.

• Understand waste.

– Life cycle costs

– Concept

– Design and development

Page 66: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Equipment Design

Equipment Build - 35%

Design & Develop - 12%

Operational & Support - 50%

Concept - 3%

LIFE CYCLE COSTS

Page 67: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Equipment Design

• Product.

• Customers and Suppliers.

• Define reliability and maintainability expectations.

• Production goals -

– Hours of work & demand (TAKT)

– Performance - Output - Life

• Waste elimination.

• Flexibility.

• Implementation plan.

CONCEPT

Page 68: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Equipment Design

• Man and machine - ergonomics, ease of access, health & safety.

• Formalise concepts.

• Incorporate standards

– Components

– User interfaces

– Standard maintenance equipment

– User/maintainer manuals

• Spares

– Component reliability/predictability (supplier data)

– Spares lists / stocking requirements

DESIGN & DEVELOPMENT

Page 69: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Equipment Design

• Audit against reliability and maintainability.

– Autonomous Maintenance.

– Effective Maintenance.

• Failure Mode and Effects Analysis (FMEA).

DESIGN & DEVELOPMENT

Page 70: Module: TPM. Target Audience : Engineering, Maintenance, Facilities, Procurement, Operations. Purpose of Module : To understand & implement the techniques.

Effective Maintenance

Preventative Maintenance

Predictive Maintenance

Planned Maintenance

Breakdown Maintenance

Effective Equipment Design

INFORMATION

TRAINING

AUTONOMOUS MAINTENANCE