6CN011 Contract Law and
Dispute Resolution (Qatar)
Module Review 2
30 March 2012
-
8/16/2019 Module Review (1)
2/16
2
FIDIC: The Priority ofContract Documents (Clause
1.5)1 !he Contract "#ree$ent
2 !he Letter o% acceptance
3 !he Letter o% !ender& !he 'articular Conditions
!he eneral Conditions
6 !he *peci+cation
, !he drawin#s
- !he schedules
. "n/ %urther docu$ents
-
8/16/2019 Module Review (1)
3/16
3
!he $plo/er (Clause 2)
*o$e Roles o% No$inatin# n#ineer ivin# possession o% the site on ti$e (21) tainin# plannin# per$issions %or the
'er$anent wor4s 'rovidin# assistance to otain per$its (22) Cooperate with the Contractor5 #enerall/ nsurin# own personnel co$pl/ with sa%et/
reuire$ents 7 protect the environ$ent (23) Ma4in# pa/$ent upon certi+cation 'rovide to the Contractor evidence o%
+nancial arran#e$ent to pa/ the Contract
price (2&)
-
8/16/2019 Module Review (1)
4/16
!he n#ineer is e8pected to $a4ecertain 9Deter$inations: under
Clause 3 o% the ;
-
8/16/2019 Module Review (1)
5/16
Resource Mana#e$ent
*ta= and Laour Contractor shall arran#e to hire5 pa/5
$aintain sta= (61)
Re$uneration and conditions o%en#a#e$ent shall not e lower thanthose prevailin# (62)
Contractor shall not poach sta= %ro$ the
$plo/er:s or#anisation (63) Contractor to co$pl/ with laour laws
(6&)
tc
-
8/16/2019 Module Review (1)
6/16
6
!he 'ro#ra$$e (-3) !he n#ineer reuires pro#ra$$e to
1 r#anise their o>ce re drawin#s5
schedules5 no$inated s?c:s2 r#anise their en#ineerin# sta= and
inspectors
3
Monitor the contractor:s pro#ress& stalish the cash @ow (%or the
$plo/er)
Monitor clai$s %or e8tensions o% ti$e
-
8/16/2019 Module Review (1)
7/16,
!he 'ro#ra$$e (-3) !he Contractor reuires pro#ra$$e
to
1 r#anise sucontractors5
2 'rocure plant5 laour and $aterials
3 'lan and control the wor4s
& stalish the asis o% clai$s stalish the cash @ow
-
8/16/2019 Module Review (1)
8/16-
8tension o% ti$e %or co$pletion
(-&) rounds %or eot include
" variation or other sustantial chan#e
in uantit/ Dela/ under suAclause o% these
conditions
8ceptionall/ adverse cli$aticconditions *horta#es in personnel or #oods caused
/ epide$ic or #overn$ent actions Dela/ caused / the e$plo/er
-
8/16/2019 Module Review (1)
9/16.
8tension o% ti$e %or co$pletion
(-&) !he %ollowin# clauses carr/ an
entitle$ent to an e8tension o% ti$e plus
cost and a reasonale pro+t 1. Dela/ed drawin#s and instructions 21 Ri#ht o% access to the site &, *ettin# out
,& !estin# 103
-
8/16/2019 Module Review (1)
10/1610
Contract 'rice and 'a/$ents (Clause
1&) "pplication %or interi$ 'a/$ent
Certi+cates to consider (1&3) sti$ated contract value "dBust$ent %or chan#es in le#islation and
chan#es in cost Deduction o% retention "dvanced pa/$ents
'lant and $aterials intended %or the wor4s Clai$s and disputes Deductions o% other certi+cates
N Contractor to suppl/ 6 copies
$onthl/
-
8/16/2019 Module Review (1)
11/16
Termination by Employer (Cl 15)
$plo/er can also ter$inate i%Contractor
• *ucontracts the wor4s
• "ssi#ns the contract• eco$es an4rupt or insolvent
• De$onstrates ein# corrupt (rier/5
etc)
• ;urther $plo/er can ter$inate /
reason o% convenience (1)
-
8/16/2019 Module Review (1)
12/16
uspension an! termination bythe Contractor
1 Contractor can stop (*uspend) wor4or slowAdown5 Ea%ter 2- da/s:noticeF5 i% $plo/er does not
– issue pa/$ent certi+cate – 'rovide evidence o% ;inancial
"rran#e$ent
2 Contractor can %urther
1 !er$inate the Contract i% the $plo/erdoes not recti%/ (1) aove
2 Clai$ %or losses therein
–. n#ineer to a#ree or deter$ine $atters
-
8/16/2019 Module Review (1)
13/1613
Clai$s (clause 20) Contractor:s Clai$s (201)
Contractor to #ive notice within 2- da/s Adescriin# the circu$stances 2- da/s o% eco$in# aware or 2- da/s Contractor should have een aware
Contractor %or%eits the ri#ht to a clai$ %or%ailin# to #ive a notice within 2- da/s
Contractor should 4eep conte$porar/ recordsin support o% clai$s ither on site or at location(s) acceptale to
n#ineer n#ineer allowed to inspect docu$ents5 %ollowin# a
-
8/16/2019 Module Review (1)
14/16
Claim " Timin#
Contractor to su$it clai$ within &2 da/s o%eco$in# (or should have eco$e) aware Contractor can clai$ on a continuous asis G i%
the source o% clai$ has a continuous e=ect n#ineer to respond to a clai$ within &2 da/s
Decision H 1) "pproved or 2) Disapprove n#ineer $a/ reuest %urther details alon#
with the decision n#ineer to estalish (an/) additional ti$e or
cost to which the Contractor is entitled "pproved pa/$ent(s) incorporated in (ne8t)
'a/$ent Certi+cate 1&
-
8/16/2019 Module Review (1)
15/16
!utorial Question 1 STECH Developments Ltd. is surprised and embarrassed to
receive a claim for loss and expense and extension of time in
respect of a project completed five years ao.
!ssumin t"at t"e contract for t"e construction of t"e project#or$s incorporated t"e %&D&C form' advise STECH #"o #as t"e
Employer under t"e contract.
1
-
8/16/2019 Module Review (1)
16/16
!utorial Question 2 (ibuilder Ltd. entered into a construction contract #it" a
)an$eetex (an$' a *S conlomerate for t"e +desin and
construction, of its European Head -ffice in Do"a. T"e contract
incorporated an arbitration areement referrin all futuredisputes to arbitration in Do"a.
(ibuilder served notice to refer a payment dispute to
adjudication and applied to t"e &CS – /atar (ranc" to
nominate an adjudicator. )an$eetex "as responded t"at it is not
ready to participate in any mic$y mouse arbitration. !dvise)an$eetex on t"e adjudication process and t"e li$ely outcome if
it refuses to participate.
16