![Page 1: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/1.jpg)
Module 6: Design ProcessModule 6: Design Process
Preliminary Field Review
Preliminary Field Review
Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package
Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package
Alignment and Grade ReviewAlignment and Grade Review
Erosion and Sediment Control Plan SheetsErosion and Sediment Control Plan Sheets
Erosion and Sediment Control Plan Sheets for
Plan-in-Hand
Erosion and Sediment Control Plan Sheets for
Plan-in-Hand
Finalization of Preliminary NOI Package and Other Applicable Permitting Documents
Finalization of Preliminary NOI Package and Other Applicable Permitting Documents
Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package
(SWPPP in NOI Package Utilizes Same Plan Sheets)
Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package
(SWPPP in NOI Package Utilizes Same Plan Sheets)
Plan-in-Hand ReviewPlan-in-Hand Review
Finalization of Erosion and Control Plan SheetsFinalization of Erosion and Control Plan Sheets
Reference Manual Page 187
![Page 2: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/2.jpg)
Integrate BMPs into the Design Process
Identify Design Tools for BMP Selection
Learning ObjectivesLearning Objectives
![Page 3: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/3.jpg)
Erosion and Sediment Control MDT Design Process Erosion and Sediment Control MDT Design Process
Consider BMPs early in the design process
Design process outcome should be completed NOI package and SWPPP
![Page 4: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/4.jpg)
Preliminary Field ReviewPreliminary Field Review
On-site
Field scoping
Identification of issues
Integration of BMP considerations
![Page 5: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/5.jpg)
Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package
Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package
Vicinity map
Delineation of potential erosion and sedimentation areas
Preliminary soil investigation
Generate erosion and sediment control schedule
Identification of existing control practices
Prepare preliminary NOI package (NOI form and SWPP)
![Page 6: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/6.jpg)
Alignment and Grade ReviewAlignment and Grade Review
Incorporate preliminary erosion and sediment control design
Incorporate preliminary NOI and SWPPP
![Page 7: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/7.jpg)
Erosion and Sediment Control Plan Sheets for Plan-in-HandErosion and Sediment Control Plan Sheets for Plan-in-Hand
Select BMPs that best apply to the reduction of erosion and sedimentation
Incorporate geotechnical information into preliminary plans
Identify existing stormwater control measures
![Page 8: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/8.jpg)
Erosion and Sediment Control Plan Sheets for Plan-in-Hand(cont.)
Erosion and Sediment Control Plan Sheets for Plan-in-Hand(cont.)
Revise preliminary erosion and sediment control plans
Revise preliminary NOI package and SWPPP
Identify additional stormwater permits necessary
Prepare preliminary erosion and sediment construction schedule
![Page 9: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/9.jpg)
Plan-in-HandPlan-in-Hand
Incorporate revised preliminary erosion and sediment control design.
Incorporate revised preliminary NOI and SWPPP
Additional stormwater permitting documents
![Page 10: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/10.jpg)
Finalization of Erosion and Sediment Control Plan SheetsFinalization of Erosion and Sediment Control Plan Sheets
Incorporate revisions from plan-in-hand
Incorporate final revision from other sections
![Page 11: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/11.jpg)
Finalization of Preliminary NOI Package and Other Applicable Permitting Documents
Finalization of Preliminary NOI Package and Other Applicable Permitting Documents
Finalize preliminary NOI
Finalize preliminary SWPPP
Finalize additional stormwater permitting documents
Revise preliminary erosion and sediment control construction schedule
![Page 12: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/12.jpg)
Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets)
Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets)
Incorporate erosion and sediment control plans into construction plans package
Incorporate NOI and SWPPP into construction package
![Page 13: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/13.jpg)
Preliminary Field ReviewPreliminary Field Review
Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package
Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package
Alignment and Grade ReviewAlignment and Grade Review
Erosion and Sediment Control Plan Sheets for Plan-in-HandErosion and Sediment Control Plan Sheets for Plan-in-Hand
Finalization of Preliminary NOI Package and Other Applicable Permitting Documents
Finalization of Preliminary NOI Package and Other Applicable Permitting Documents
Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets)
Completed Bid Package including Erosion and Sedimentation Control Plan Sheets and Preliminary NOI Package (SWPPP in NOI Package Utilizes Same Plan Sheets)
Plan-in-Hand ReviewPlan-in-Hand Review
Finalization of Erosion and Control Plan SheetsFinalization of Erosion and Control Plan Sheets
Reference Manual Page 187
![Page 14: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/14.jpg)
Erosion and Sediment Control Erosion and Sediment Control
Design Tools
BMP Selection Guideline
Rules of Thumb
NOI Package Tools
BMP Unit Cost Rate Schedule (Appendix A of the Reference Manual)
![Page 15: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/15.jpg)
Erosion and Sediment Control Design ProcessErosion and Sediment Control Design Process
Identify site specific erosion concerns
Assess if erosion is likely to occur at the site
![Page 16: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/16.jpg)
BMP Selection Guidelines Erosion by Water BMP Selection Guidelines Erosion by Water
Reference Manual Page 193
![Page 17: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/17.jpg)
BMP Selection Guidelines Available computer model BMP Selection Guidelines Available computer model
RUSLE Model used to estimate average annual soils loss BMP selection guidelines design tools
A=RKLSCP
![Page 18: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/18.jpg)
BMP Selection Criteria BMP Selection Criteria
Identify type of erosion that could occur
Use the BMP selection guideline table in the Erosion and Sediment Control BMP manual (page 196 in the Reference Manual)
Select appropriate BMPs for the construction site
![Page 19: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/19.jpg)
BMP Selection Criteria BMP Selection Criteria
ID BMP Name Primary Purpose Erosion Processes SC-1 Silt Fence Slow and filter runoff to
retain sediment Stream Bank, Wind, Snow, and Shoreline.
Example from Table 4.4.1-1 of the BMP Manual (page 196)
![Page 20: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/20.jpg)
BMP Selection Criteria BMP Selection Criteria
Use a “toolbox approach” for selection of BMPs for each site
Use multiple BMPs in conjunction with each other to create an integrated design
Integrate surface stabilization with sediment control BMPs
![Page 21: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/21.jpg)
BMP Vegetation Considerations BMP Vegetation Considerations
Protect existing vegetation whenever possible
Phase vegetation disturbing activities to minimize duration of exposed soil
![Page 22: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/22.jpg)
BMP Selection ConsiderationsBMP Selection Considerations
Snowmelt vs. Intense Rainfall
![Page 23: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/23.jpg)
RAIN vs SNOW
EAST vs WEST.html
Weather ImpactsWeather Impacts
![Page 24: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/24.jpg)
![Page 25: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/25.jpg)
Western vs. Eastern Montana Western vs. Eastern Montana
Western Montana
Extensive snowmelt runoff
10-120 inches of precipitation per year
Eastern Montana
Rainfall events can produce significant runoff
12-20 inches of precipitation per year
![Page 26: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/26.jpg)
Unprotected cut slope
Significant erosion
Significant off site sedimentation
Case Study Case Study
![Page 27: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/27.jpg)
Possible Implementations
SS-9 along top of slope
SS-3, 6, 7, 8, 12, 13, or 15 on slope
SC-5 or 6 on slope
SC-4, 6 or 11 in ditch
SC-2 or 3 at outfall
Case Study ConclusionCase Study Conclusion
![Page 28: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/28.jpg)
Erosion and Sediment Control Rules of ThumbErosion and Sediment Control Rules of Thumb
Slope measurement tables (Page 199 in Reference Manual)
Slope inclination conversion tables (Page 200 in Reference Manual)
Seed application rate tables (Found on detailed drawings for SS4 and SS15)
![Page 29: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/29.jpg)
Erosion and Sediment Control Design ProcessErosion and Sediment Control Design Process
NOI Package Tools
Reference Manual contains NOI form, SWPPP form, NOT form
Instructions for completing forms provided
![Page 30: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/30.jpg)
BMP selection is required during the Design Process
Design Tools are available in the Reference Manual
BMP Selection Criteria are provided
NOI Forms and instructions are included in the Reference Manual
ConclusionConclusion
![Page 31: Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.](https://reader030.fdocuments.in/reader030/viewer/2022032604/56649e665503460f94b61596/html5/thumbnails/31.jpg)
Questions and DiscussionQuestions and Discussion