Modular Lightweight Car Park Solutions PREFAB NZ · 2019. 9. 24. · 3 PARKD’s Technology CVBTM...
Transcript of Modular Lightweight Car Park Solutions PREFAB NZ · 2019. 9. 24. · 3 PARKD’s Technology CVBTM...
1
Modular Lightweight Car Park Solutions
PREFAB NZFASTER, CHEAPER, SMARTER CAR PARKS
PARKD LIMITED (ASX: PKD)
Australia’s only relocatable, modular multilevel parking solution
Validated, cost competitive technology that allows for off-site fabrication and minimal on-site works and disruption
Scalable, low capital intensity business model with low corporate overheads and a compelling growth strategy
One of very few publicly listed car parking enterprises worldwide
Highly credentialed management and board with significant construction, commercialisation and ASX experience
Revenue generating company entering commercial inflection point at an extremely attractive market capitalisation
22
3
PARKD’s Technology
CVBTM Continuously Voided Beam - Hollowcore
PTP PARKD Transportable Panels - Speedfloor
SpecificationDesign Life: 25 – 100 Years
Fire: 120 mins
Lateral: EQ + Wind
SWDL : 2.7 kN/m2
Height: Up to 6 Levels
Spans: Up to 17m
Floor to Floor Up to 3m
The Parkd System is a marriage between existing construction technology, designed to be assembled in a variety of configurations and meets all Australian safety specifications
The BENEFITS
PARKD’s system is based on fundamental advantages over conventional construction
MODULAR CONSTRUCTION
OFFSITE MANUFACTURE
COST EFFICIENT FLEXIBLE AND MOBILE
ECO-CLEVER
REUSABLE & LIGHTER
4
FAST ONSITE
ASSEMBLY
PERMANENT SYSTEM
PARKD’s system based on fundamental advantages over conventional construction
MODULAR CONSTRUCTION
OFFSITE MANUFACTURE
COST EFFICIENT FLEXIBLE AND MOBILE
ENVIRONMENTALLY CLEVER
REUSABLE & LIGHTER
FAST ONSITE
ASSEMBLY
5
RELOCATABLE SYSTEM
COMMERCIAL DIVERSIFICATION
OWN ANDOPERATECAR PARKS
LEASE CAR PARKS
DELIVER SERVICES
for electric and autonomous car markets
FUTURE
86
PARKD’s PATENTED CVB™ CONTINUOUSLY VOIDED BEAM
• PARKD has the patent in the use of Hollowcore as a beam
• Uses prestressed hollowcore sections
• Typ. Spans of 7.2 - 8.2m, up to 17m with standard sections
• Lighter than an equivalent traditional precast design
7
PTP – PARKD Transportable Panels
8
• Precast Panel
• 90mm concrete slab spanning over cold formed joists
• Composite section
• Conventional reinforcement
• Fibre reinforcement
• Lightweight
PTP – PARKD Transportable Panels
• Modular
• Standard width panels, spans up to 8.2m
• Suits car park geometry
• Quick installation, covers large surface area
• Finished surface, no topping99
PTP – PARKD Transportable Panels
• Strength and serviceability performance data through testing
• Precast panel manufacturing and transportation efficiencies
10
Case Study – City Subaru, Victoria Park
First Transportable Car Park in Australia
Minimized Business Interruption
Challenging site conditions
Construction modelling
11
Audi Centre, Perth
Status: Contracted feasibility
Estimated project value: $4.2m
Area: 2,500m^2 (Approx.)
Number of Bays: 250 Approx.
Structure Type: Permanent Showroom
Project Achievements
•Assembly of PARKD System completed ahead of construction program
•Total project cost demonstrates competitive market position
•Performance of supply chain exercised and proven
•Cost and construction efficiencies benchmarked
•PARKD System Evolution in response to lessons learnt on site
PRE-CONTRACTS AND DESIGN
Mount Waverly, Melbourne
Status: Submitted for Planning Approval
Estimated project value: $3.5m
Area: 5,300m2 (Approx.)
Number of Bays: 184
Structure Type: Permanent
712
Toyota Motor Car Company
Status: Contracted feasibility
Estimated project value: $10m
Structure Type: Permanent/RelocatableProject Achievements
•Assembly of PARKD System completed ahead of construction program
•Total project cost demonstrates competitive market position
•Performance of supply chain exercised and proven
•Cost and construction efficiencies benchmarked
•PARKD System Evolution in response to lessons learnt on site
PRE-CONTRACTS AND DESIGN
Level Crossing Removal Projects
Status: Feasibility
Estimated project value: $Not disclosed
Area: 11,200m^2 (Approx.)
Number of Bays: 400
Structure Type: Temporary
613
OUR BUSINESS UNITS
CAR PARKS
Turnkey delivery
DESIGNCONSULTING
SERVICES
BUILD OWN ANDOPERATECAR PARKS
LEASE CAR PARKS
DELIVER SERVICES
for electric and autonomous car markets
514
PARKING INFRASTRUCTURETransformational car parks for a changing world.
15
15
LEADERSHIP in Parking Solutions
16
• Multi pass opportunities• Premium parking & valet• Security• EV charging• Convenience
Commuter Operation
Community • Centralised residential parking• General storage• Community events• Urban gardens
• Solar collectors• Rainwater harvest• EV & grid battery
Environment
• Uber Air• Autonomous depots• Last km travel• Ride share facilities• Storage
Multi User Flexibility
Federal commitment to spend $650m on infrastructure improvements including commuter parking
State Government commitment to increase the number of multi-level commuter car parks
Planned infrastructure projects impacting on local communities on the increase with a solution desperately required to accommodate workers and commuters
Changing commercial activation of car parks will drive private development and multi-use applications such as:
- Electric Vehicle Charging- Drone Delivery- Child care - Autonomous vehicles
Transfer of public car parks to private groups to meet the demand of private enterprise to delivery energy, convenience and urban planning
NATIONAL COMMUTER PARKING PROJECTS
17
AHEAD of the BOOM in
•$100b spend in the next 10 years
•$650m specifically allocated for commuter car parks
Infrastructure
•11,000 new commuter bays in Victoria
•2,300 new commuter bays in Brisbane
•4,000 new commuter bays in Sydney
•Total projects in excess of $400m
•Forecast increase of 16,500 bays in Brisbane over 10Y
•Planned 2,500 bay increase in Melbourne
•Planned 3,000 bay increase in Perth
•Planned 16,500 bay increase (inc. West Sydney)
Retail
•Proposed 2,000 spaces Port of Melbourne
•Proposed 3,000 spaces Port of Fremantle
1018