MoDOT Sales Tax Medium Priority Project List - May 2014
-
Upload
nextstlcom -
Category
Documents
-
view
214 -
download
0
Transcript of MoDOT Sales Tax Medium Priority Project List - May 2014
East West GatewayWorkshop Two - 5/21/14
MoDOT Sales Tax Candidate Project List
Breakout #1 - Regional Priority: Medium
ID Location Route ProjectEst. 2019
cost (millions $)
Regional Priority Range
H7 St. Louis Route DReplace signalized intersections with grade-separated crossings from I-270 to US 67
$105 Med
H8 St. Louis City I-44 Interchange modifications at the I-55 interchange $87 Med
H9 St. Louis Airport Access
Consolidate and improve airport access - Banshee Rd./Scudder/I-170/Airport/McDonnell
$14 Med
H10 St. Louis City Route H Corridor improvements from I-270 to Hall Street $15 Med
H11 St. Louis I-64 Corridor improvements from Long Road to MO 141 $105 Med
H12 St. Louis I-270 Interchange improvements at MO 364 $17 Med
H13 St. Louis I-44 Corridor improvements from MO 141 to US 67 $170 Med
H14 St. Louis ManchesterRd (Rte.100)
Corridor improvements at Baxter/Sulphur Spring Road, Brentwood Blvd, Big Bend Blvd, Hanley Rd
$185 Med
H15 St. Louis City Route H /Hall St
Improvements from East Grand to Riverview Drive to eliminate flooding $24 Med
H16 St. Charles MO 94 Upgrade to an expressway from I-70 to Route 364 $200 Med
H17 St. Charles I-70 Corridor improvements from Route T/W to I-64 $90 Med
H18 St. Louis City Branch StImprovements from I-70 to Mississippi River levee, including sidewalks and bike lanes
$5 Med
H19 St. Louis Lindbergh tunnel Upgrade IT systems $1 Med
H20 St. Louis I-44 Interchange improvements at Shrewsbury $140 Med
H21 St. Charles US 61 Corridor improvements from I-64 to Lincoln County $93 Med
H22 St. CharlesF, T, TT, W, H, J, C, B, Y,
V
Systematic safety improvements including adding shoulders, widening lanes, correcting curves, adding guardrail, etc.
$66 Med
H23 St. Louis I-270Corridor improvements from MO 100 to I-64 $36 Med
H24 Jefferson MO 141
Corridor improvements from Route 21 to Astra Way, including at Ridgewood Middle School Drive and Old Missouri State Road
$1 Med
H25 St. LouisLaclede Station corridor
Corridor improvements, including accommodating bicycles and pedestrians
$41 Med
H26 Jefferson I-55 Corridor improvements from Route Z to US 67 $104 Med
Hig
hway
s
East West GatewayWorkshop Two - 5/21/14
MoDOT Sales Tax Candidate Project List
Breakout #1 - Regional Priority: Medium
ID Location Route ProjectEst. 2019
cost (millions $)
Regional Priority Range
T8 St. LouisSt. Louis City
New buses and vans for MetroBus and Call-A-Ride $17 annually Med
T9 St. LouisSt. Louis City
Implement traffic signal priority (TSP) for buses and emergency vehicles $2 Med
T10
St. LouisSt. Louis City
FranklinJefferson
St. Charles
Supplement funding shortfall for the Transportation for Elderly Persons and Persons with Disabilities Program (Section 5310 - paratransit)
$3 Med
T11
St. LouisSt. Louis City
FranklinJefferson
St. Charles
Provide operating funds to supplement the Missouri Elderly and Handicapped Transportation Assistance Program (MEHTAP)
$5 Med
T12 St. LouisSt. Louis City Transit Provide operating funds to support
additional Metro transit services$23
Annually Med
T13 St. LouisSt. Louis City
Address service needs including additional frequency and span of service in underserved markets
$5 annually Med
T14 St. LouisSt. Louis City I-55 Build enhanced express bus
infrastructure $23 Med
T15 St. LouisSt. Louis City 64 Build bus rapid transit (BRT) route on I-
64, Chesterfield to Downtown $40 Med
T16 St. Louis City Central corridor streetcar: Central West End to Downtown $290 Med
T17 St. Louis City Construct a Northside - Florissant Valley MetroLink extension $1,050 Med
T18 St. LouisSt. Louis City
Construct the Southside - South County MetroLink extension $1,150 Med
T19 St. LouisSt. Louis City
High Speed Rail from St. Louis to Chicago ? Med
T20 St. LouisSt. Louis City I-44 Build enhanced express bus
infrastructure $23 Med
�������
East West GatewayWorkshop Two - 5/21/14
MoDOT Sales Tax Candidate Project List
Breakout #1 - Regional Priority: Medium
ID Location Route ProjectEst. 2019
cost (millions $)
Regional Priority Range
B4 St. LouisSt. Louis City
Mississippi River
Greenway
Chouteau Avenue to Lyons Park Trail, Lyons Park to Sugarloaf Mounds Trail, Sugarloaf to Bellerive Park Trail, Bellerive Park to River des Peres Trail, Jefferson Barracks Park to Sylvan Springs Trail, Sylvan Springs to Cliff Cave Park Trail, Cliff Cave to Bee Tree Park Trail
$35 Med
B5 St. Louis City
Grand Center /
Washington Ave
Theresa to Sheldon Concert Hall $2 Med
B6 St. Louis City Tucker Blvd. Improvements including road diet and median enhancement from Washington to Chouteau
$8 Med
B7 St. Louis City City arterials Sidewalk Improvements along city arterials, including ADA compliance $12 Med
B8 St. Louis City 7th and 8th Street Complete from Pine to Spruce $5 Med
B9 St. Louis City Clark St 8th to Broadway $5 Med
B10 St. Louis City Vandeventer Forest Park Parkway to I-44 $20 Med
B11 St. Louis City Natural Bridge Kingshighway to Grand $6 Med
B12 St. Louis City MLK Grand to Kingshighway $6 Med
B13 St. Louis City Goodfellow I-70 to Natural Bridge Road $3 Med
B14 St. Louis City Laclede's Landing
Improvements including traversable streets, ADA compliant sidewalks, park enhancements & pedestrian connections under MLK Bridge, 1st St., 2nd St., Morgan and Laclede's Landing Blvd.
$9 Med
B15 St. Louis City Centennial Greenway Delmar to Creve Coeur Park Trail $35 Med
B16 St. Louis City Chouteau Greenway Midtown Trail Loop $7 Med
B17 St. Louis City / IL
Old Chain of Rocks Bridge
Bridge Restoration $6 Med
B18 St. Louis City N. Grand I-70 to Natural Bridge Road $6 Med
Bik
e/P
ed
East West GatewayWorkshop Two - 5/21/14
MoDOT Sales Tax Candidate Project List
Breakout #1 - Regional Priority: Medium
ID Location Route ProjectEst. 2019
cost (millions $)
Regional Priority Range
B19 St. Louis City
Chouteau greenway, Cerre St under EB I-64 ramps/vehicular traffic lanes and a cycle track on south side, bike/ped bridge through I-64/70/44 interchanges from Cerre to Arch grounds, Citygarden connection along 10th from Greenway to Market
$3 Med
B20 St. LouisLaclede Station corridor
Provide access to the South County, Shrewsbury Crestwood and Affton areas in Maplewood
$2 Med
B21 St. LouisNew Ballwin / Dougherty
Ferry
Add bike shoulders, improve and add sidewalks and extend pedestrian lights between New Ballwin Road and Kirkwood
$2 Med
B22 St. Louis City Gravois Add bikeway from St. Louis City Limit to Washington Ave. $3 Med
B23 St. Louis Ladue / Clayton Add paved shoulders $4 Med
B24 St. Louis City Confluence Greenway North Riverfront Phase II $17 Med
B25 St. Louis Bridge- Route 66 Route 66 Bridge Restoration $14 Med
B26 St. Louis Connector Trail
O'Fallon and Fairgrounds Parks to Riverfront Trail $8 Med
B27 St. Louis Connector Trail Etzel to St. Vincent County Park Trail $7 Med
B28 St. LouisSt. Louis City
Maline Greenway UMSL to Riverfront Trail $29 Med
B29 St. Louis CityRiver des
Peres Greenway
Forest Park to Francis Slay Park Trail Lansdowne Trail $10 Med
B30 St. Louis Clayton Add paved shoulders $8 Med
M2 St. Louis City Waterways Municipal River Terminal N Dock consolidated improvements $12 Med
M3 St. Louis City RailConstruct new track from N. Market to Biddle St. to better accommodate MO River Runner trains
$8 Med
M4 St. Charles Aviation Rehabilitate runways at St. Charles County SMARTT airport $2 Med
Mul
timod
alB
ike/
Ped