Modified New Commissioning Handing Over DOC _2_-REVISED
-
Upload
nicholas-frye -
Category
Documents
-
view
214 -
download
0
Transcript of Modified New Commissioning Handing Over DOC _2_-REVISED
-
8/10/2019 Modified New Commissioning Handing Over DOC _2_-REVISED
1/5
GENSET COMMISSIONING & HANDING OVER DOCUMENT
Customer :. Date:Address: ..
Contact Person:.....Official Phone number:.. Fax no:.
Plant Supplier: Supplied by:. Genset number
Genset Make: Genset Model no:..... Genset Serial no:...
Alternator Make:.. Alternator Model no:. Alternator Serial no:.
Engine Make:... Model no: Engine Serial no:..
Genset Controller. ECM Part Number Turbo Model........................................
Capacity (KW/KVA): Rated Voltage: Frequency/RPM:...
Rated Current: Power factor:. CPL:
Operation (Single/Parallel): Method of Parallel (Auto/Manual)
Make of Paralleling Gear:... Model of paralleling system:.
Number of sets been Parallel:..
Starting (Auto/Manual): Hour Meter:.. KWHR Meter:.
Change Over Capacity : Supplier: Supplied by:
Battery Trickle Charger:.. Make: Supplied by:
Type of lube oil used: Quantity of lube oil:
Type of coolant used: Quantity of coolant:Number of batteries used:.. Make of Battery:
Type of Sound Attenuation (Canopy/Room): Carried out by:
Fuel System Installation Carried out by:..
Size of Power cables used:. Carried out by:.
Earthing System (Rod/Plate):.. Carried out by:.
Exhaust System carried out by:
Paralling Panel installed by:
ATS Panel installed By:..
Fuel Filter no:. Qty:
Lube Oil Filter no:. . Qty:...By pass Filter no:. Qty:
Water Filter no: Qty:.
Air Filter no:. Qty:
Fuel Water Separator no: Qty:.
-
8/10/2019 Modified New Commissioning Handing Over DOC _2_-REVISED
2/5
Pre Inspection Check List (Prior to start)
Radiator :
01. Mounts are secure [ ]02. Clamps on Hoses tight. [ ]
03. Drain Plug is tight [ ]
04. Water in Radiator [ ]
05. All the Belts are tight. [ ]06. Pressure Cap is tight [ ]
07. Fan Blades to Guard clearance equal [ ]
08. Fan mounting are tight [ ]
Engine / Alternator:
01. All Guards are secure [ ]
02. Clamp on Hoses tight. [ ]
03. Air Cleaner is properly mounted [ ]04. Fuel Line Diameters are correct. [ ]
05. Fuel Lines are secure and no leaks. [ ]
06. Fuel System Installation correct.. [ ]
07. Vibration Isolators are properly mounted.. [ ]
08. Lube Oil in pan to correct level. [ ]09. Exhaust Clamps tight.. [ ]
10. Exhaust System Installation correct. [ ]11. Adequate Ventilation.. [ ]
12. Engine Breather pipe been extended out of Radiator. [ ]
13. Oil Filler Cap is secure and tight [ ]14. Main Alternator Cables are tight & correct [ ]
15. Neutral is connected to the frame & tight [ ]
16. Frame earthen correctly connected . [ ]
17. Set mounted Breaker is set correctly.. [ ]18. All the control cables are installed & tight. [ ]
19. Set mounted panel PCBs are in tact.. [ ]20. Battery cables are tight [ ]21. Alternator Heaters connected & power supplied [ ]
-
8/10/2019 Modified New Commissioning Handing Over DOC _2_-REVISED
3/5
Paralleling /ATS Panel
01. Changeover end MAINS cables tight & correctly installed.. [ ]
02. Changeover end GEN cables tight & correctly installed. [ ]03. Changeover end LOAD cables tight & correctly installed. [ ]04. Genset Breaker is set correctly [ ]
05. All the control cables are installed & tight.. [ ]
06. Panel earth connected to common genset earth.. [ ]07. Annunciator operation checked [ ]
08. Operator Interface Module checked [ ]
09. Motorized Breaker operation checked [ ]
10. Emergency Stop/Remote Button operation checked [ ]11. Bus Bars are tight & correctly installed.. [ ]
12. Mains power Supplied for PLC Battery charger. [ ]
13. Out Going Breakers are set correctly.. [ ]
Final Inspection ;
Engine/Alternator/ ATS/ Paralleling Panel:
01. Lubrication Pressure in range [ ]
02. Coolant Temperature in range.. [ ]03. All the gauges are working.. [ ]
04. Checked for leaks [ ]05. Coolant Chemical Valve open [ ]06. Electrical Parameters are checked. [ ]
07. Phase Rotation is correct [ ]
08. Checked for Abnormal sounds/smell. [ ]09. Tested all the Breaker operations.. [ ]
10. Load Transfer/Re-transfer is correct. [ ]
11. Load Sharing is correct. [ ]12. Load Demand is set.. [ ]
13. Cooling Run is checked/set [ ]
14. Start Delay is checked/set.. [ ]
15. Tested all the Breaker Tripp operations. [ ]16. Tested with Available Load [ ]
-
8/10/2019 Modified New Commissioning Handing Over DOC _2_-REVISED
4/5
Technical Comments-
Tested & Inspected by:
Name: Designation:
Signature:.. Date:..
Handed Over:
Customer Name: Designation:
Signature:. Date:..
24 HOURS CONTACT DETAILS
SERVICE ISSUES:
Name Designation Contact No.
01. Mr. Sanjeewa Weerakoon Asst. Aftermarket Manager 077 3810517
02. Mr. P W K Kirinda Asst. Electrical Engineer 077 2604260
OFFICE
Tel: 0112 413002 / 0112 413132
-
8/10/2019 Modified New Commissioning Handing Over DOC _2_-REVISED
5/5