    GENSET COMMISSIONING & HANDING OVER DOCUMENT

    Customer :. Date:Address: ..

    Contact Person:.....Official Phone number:.. Fax no:.

    Plant Supplier: Supplied by:. Genset number

    Genset Make: Genset Model no:..... Genset Serial no:...

    Alternator Make:.. Alternator Model no:. Alternator Serial no:.

    Engine Make:... Model no: Engine Serial no:..

    Genset Controller. ECM Part Number Turbo Model........................................

    Capacity (KW/KVA): Rated Voltage: Frequency/RPM:...

    Rated Current: Power factor:. CPL:

    Operation (Single/Parallel): Method of Parallel (Auto/Manual)

    Make of Paralleling Gear:... Model of paralleling system:.

    Number of sets been Parallel:..

    Starting (Auto/Manual): Hour Meter:.. KWHR Meter:.

    Change Over Capacity : Supplier: Supplied by:

    Battery Trickle Charger:.. Make: Supplied by:

    Type of lube oil used: Quantity of lube oil:

    Type of coolant used: Quantity of coolant:Number of batteries used:.. Make of Battery:

    Type of Sound Attenuation (Canopy/Room): Carried out by:

    Fuel System Installation Carried out by:..

    Size of Power cables used:. Carried out by:.

    Earthing System (Rod/Plate):.. Carried out by:.

    Exhaust System carried out by:

    Paralling Panel installed by:

    ATS Panel installed By:..

    Fuel Filter no:. Qty:

    Lube Oil Filter no:. . Qty:...By pass Filter no:. Qty:

    Water Filter no: Qty:.

    Air Filter no:. Qty:

    Fuel Water Separator no: Qty:.

  • 8/10/2019 Modified New Commissioning Handing Over DOC _2_-REVISED

    2/5

    Pre Inspection Check List (Prior to start)

    Radiator :

    01. Mounts are secure [ ]02. Clamps on Hoses tight. [ ]

    03. Drain Plug is tight [ ]

    04. Water in Radiator [ ]

    05. All the Belts are tight. [ ]06. Pressure Cap is tight [ ]

    07. Fan Blades to Guard clearance equal [ ]

    08. Fan mounting are tight [ ]

    Engine / Alternator:

    01. All Guards are secure [ ]

    02. Clamp on Hoses tight. [ ]

    03. Air Cleaner is properly mounted [ ]04. Fuel Line Diameters are correct. [ ]

    05. Fuel Lines are secure and no leaks. [ ]

    06. Fuel System Installation correct.. [ ]

    07. Vibration Isolators are properly mounted.. [ ]

    08. Lube Oil in pan to correct level. [ ]09. Exhaust Clamps tight.. [ ]

    10. Exhaust System Installation correct. [ ]11. Adequate Ventilation.. [ ]

    12. Engine Breather pipe been extended out of Radiator. [ ]

    13. Oil Filler Cap is secure and tight [ ]14. Main Alternator Cables are tight & correct [ ]

    15. Neutral is connected to the frame & tight [ ]

    16. Frame earthen correctly connected . [ ]

    17. Set mounted Breaker is set correctly.. [ ]18. All the control cables are installed & tight. [ ]

    19. Set mounted panel PCBs are in tact.. [ ]20. Battery cables are tight [ ]21. Alternator Heaters connected & power supplied [ ]

  • 8/10/2019 Modified New Commissioning Handing Over DOC _2_-REVISED

    3/5

    Paralleling /ATS Panel

    01. Changeover end MAINS cables tight & correctly installed.. [ ]

    02. Changeover end GEN cables tight & correctly installed. [ ]03. Changeover end LOAD cables tight & correctly installed. [ ]04. Genset Breaker is set correctly [ ]

    05. All the control cables are installed & tight.. [ ]

    06. Panel earth connected to common genset earth.. [ ]07. Annunciator operation checked [ ]

    08. Operator Interface Module checked [ ]

    09. Motorized Breaker operation checked [ ]

    10. Emergency Stop/Remote Button operation checked [ ]11. Bus Bars are tight & correctly installed.. [ ]

    12. Mains power Supplied for PLC Battery charger. [ ]

    13. Out Going Breakers are set correctly.. [ ]

    Final Inspection ;

    Engine/Alternator/ ATS/ Paralleling Panel:

    01. Lubrication Pressure in range [ ]

    02. Coolant Temperature in range.. [ ]03. All the gauges are working.. [ ]

    04. Checked for leaks [ ]05. Coolant Chemical Valve open [ ]06. Electrical Parameters are checked. [ ]

    07. Phase Rotation is correct [ ]

    08. Checked for Abnormal sounds/smell. [ ]09. Tested all the Breaker operations.. [ ]

    10. Load Transfer/Re-transfer is correct. [ ]

    11. Load Sharing is correct. [ ]12. Load Demand is set.. [ ]

    13. Cooling Run is checked/set [ ]

    14. Start Delay is checked/set.. [ ]

    15. Tested all the Breaker Tripp operations. [ ]16. Tested with Available Load [ ]

  • 8/10/2019 Modified New Commissioning Handing Over DOC _2_-REVISED

    4/5

    Technical Comments-

    Tested & Inspected by:

    Name: Designation:

    Signature:.. Date:..

    Handed Over:

    Customer Name: Designation:

    Signature:. Date:..

    24 HOURS CONTACT DETAILS

    SERVICE ISSUES:

    Name Designation Contact No.

    01. Mr. Sanjeewa Weerakoon Asst. Aftermarket Manager 077 3810517

    02. Mr. P W K Kirinda Asst. Electrical Engineer 077 2604260