THE MODERNIZATION PROJECTS OF OSE’S RAILWAY NETWORK, WHICH ARE IMPLEMENTED WITH THE FINANCIAL SUPPORT OF EUROPEAN UNION FUNDS (EUROPEAN REGIONAL DEVELOPMENT FUND & COHESION FUND) AND WITH NATIONAL RESOURCES, CONTRIBUTE TO THE
REDUCTION OF ECONOMIC & SOCIAL DISPARITIES BETWEEN EU CITIZENS
B. Chronopoulou
Planning & Development Directorate
ERGOSE
Solid company organization covering all project implementation
aspects (program and project management, supervision, design,
quality controls, supporting services, etc)
Broad knowhow
Experienced and specialized human resources (total 200 people-112
engineers).
Company Quality System (CQS) and Health & Safety System
Certificate of ERGOSE’s Management Competence in acting as
project Beneficiary for NSRF 2007-2013.
COMPANY PROFILE ERGOSE is a Société Anonyme, subsidiary of the Hellenic Railways
Organization (OSE).
The Company manages the railway infrastructure projects of OSE which
are co-financed by the ERDF, Cohesion Fund and the TEN-T budget,
while her operations have been expanded to third parties within Greece
and abroad during last few years.
After 16 years of operation, ERGOSE benefits from the following:
MODERNISATION OF THE RAIL CORRIDOR
PATRAS – ATHENS – THESSALONIKI –IDOMENI /
PROMACHONAS (PATHE/P)
ERGOSE’s primary investment objective :
which means :
PROMACHONAS
PATRΑS ATHENS
THESSALONIKI
EIDOMENI
ALBANIA
FYROM BULGARY
The creation of a high-speed rail corridor of Increased Capacity
having the following features :
Is equipped with modern signaling,
telecommanding, telecommunication
and electrification systems fulfilling
the interoperability requirements of
the European railways.
Interconnects the main urban centres
of the country and areas with
significant growth in the primary and
secondary sectors
Is the backbone of the greek railway
network
Serves suburban transports of the
major cities (Athens, Patras,
Thessaloniki)
Links to the major freight centres,
main ports and Trans-European
corridors (ΙV and X).
IV X
STRIMONAS
PROMACHONAS
THESSALONIKI
EIDOMENI
POLIKASTRO
DOMOKOS
TITHOREA
ATHENS
PIRAEUS
PATRAS
RODODAFNI
KIATO
PROJECTS IMPLEMENTATION PROGRESS
Single line with poor technical
characteristics
Lack of signalling,
telecommanding,
telecommunications and
electrification systems
The railway line Athens-Patras
is metric gauge
The implementation progress
of the new double electrified
railway line Patras-Athens-
Thessaloniki 700 km, has as
following:
180 km or 26% in advanced
construction phase: The most
difficult parts of the rail axis,
as they pass through
territories with a strong
geographical terrain
28 km or 4% in tender phase
of the infrastructure projects
STRIMONAS
PROMACHONAS
THESSALONIKI
EIDOMENI
POLIKASTRO
DOMOKOS
TITHOREA
ATHENS
SPATA PIRAEUS
PATRAS
RODODAFNI
KIATO
Significant funding under the 4
programming periods
486 km or 70% completed
N.IKONIO ATHENS
PATRAS
THESSALONIKI
PROMACHONAS EIDOMENI
BULGARIA FYROM
ALBANIA
TURKEY
ATHENS
AIRPORT
Most recently completed
project
Rail link to Piraeus
freight port (N. IKONIO)
New single line (17 km long) with signaling and telecommunications
SKΑ
THRIASSIO
FREIGHT CENTER
ATHENS
PIRAEUS
Ν. ΙΚΟΝΙΟ
2013 completed
RAILWAY STATION IN N.IKONIO PORT
R.BRIDGE ON THE LINE TO N. IKONIO PORT
STRIMONAS
PROMACHONAS
THESSALONIKI
EIDOMENI
POLIKASTRO
DOMOKOS
TITHOREA
ATHENS
PIRAEUS
(N.IKONIO)
RODODAFNI
DOMOKOS
LIANOKLADI
TITHOREA
Construction of a new railway line
of high speeds (160 – 200 km/h),
equipped with signaling,
telecommunication and
electrification
Total length: 106 km
(substitutes the old line 122 km long)
Total cost: 1,8 billion euros
Estimated completion: 2016
4 tunnels of 30.837 m single line long
(Kallidromo and Domokos)
Start of works: 1997
BREAKTHROUGH OF KALLIDROMO TUNNEL(22-5-2013)
KALLIDROMO TUNNEL
RAILWAY TUNNEL RT 6 (OTHRIS TUNNEL) – SOUTH DRIVE
OLD
PHOTO
ATHENS
PATRAS
THESSALONIKI
PROMACHONAS EIDOMENI
BULGARIA FYROM
ALBANIA
TURKEY
Construction of a new double
railway line, equipped with
signaling, telecommunication and
electrification systems
Total cost: 980 million euros
Estimated completion:
2015 up to Diakopto
2016 up to Rododafni
6 tunnels of total length 11.000 m
Start of works: 2006
Total length: 71 km
DERVENI TUNNEL
NEW RAILWAY LINE KIATO-RODODAFNI ( 71 km)
OLD
PHOTO
MELISSI TUNNEL
OLD
PHOTO
TRAPEZA TUNNEL
OLD
PHOTO
AIGIO TUNNEL
ΠΛΑΝΟ
ΑΡΧΕΙΟΥ
CUT&COVER OF AIGIO TUNNEL (FORE POLLING IN PROGRESS)
OLD
PHOTO
SITHA’s RIVER BRIDGE
OLD
PHOTO
STRIMONAS
PROMACHONAS
THESSALONIKI
EIDOMENI
POLIKASTRO
DOMOKOS
TITHOREA
ATHENS
SPATA PIRAEUS
PATRAS
RODODAFNI
KIATO
END 2016
Significant reduction in travel time
Improvement of the customer service level in terms of travel comfort,
transport safety and reliability of services
Contribution to regional development of the country and strengthening
its role as a transit center of combined freight transport in South East
Europe
Significant energy and environmental benefits, due to the diversion
of passenger and freight transport volume from other transport
means to the rail
BENEFITS
Athens-Thessaloniki: 7h 30’ before the projects,
4h 30’ today
3h 30’ in the final situation
Athens-Patras: 3h 30’ before the projects
2h 30’ in the final situation