Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 -...

15
Modernisation of the automated system for monitoring of radiation situation in the Chornobyl exclusion zone within the EU TACIS project State Specialised Scientific and Industrial Enterprise “Chornobyl Radioecological Centre” (SSSIE “Ecocentre”) State Department – Administration of the exclusion zone and zone of absolute resettlement, Ministry of Ukraine for Emergencies 20th anniversary of the Chornobyl catastrophe conference, Heidelberg, March 15, 2006 SSSIE “Ecocentre”, 2006 1

Transcript of Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 -...

Page 1: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Modernisation of the automated system for monitoring of radiation situation in the Chornobyl exclusion zone within the EU TACIS project

State Specialised Scientific and Industrial Enterprise ldquoChornobylRadioecological Centrerdquo (SSSIE ldquoEcocentrerdquo)State Department ndash Administration of the exclusion zone and zone of absolute resettlement Ministry of Ukraine for Emergencies

20th anniversary of the Chornobyl catastrophe conference Heidelberg March 15 2006

SS

SIE

ldquoEco

cent

rerdquo

2006

1

Conventional signs

State Border of Ukraine

Border of territory handed over under jurisdiction of the Administration of the Exclusion zone in 1997

Western border of the Exclusion zone before 1997

Chornobyl NPP

Settlements of radioecologicalmonitoring

Isolines of the contamination density

of 137Cs kBqm2

Railway

a) main

b) auxiliary

c) conventional

Roads with blacktop coating

Earth road

Forest and field roads

Scale of the contamination

density of 137CskBqm2

20 0007 500

40 000

4 0002 0007500400

20010040

Kilometres

Surface soil 137Cs contamination of the Exclusion zone (for 01122002)

SS

SIE

ldquoEco

cent

rerdquo

2004

2

Vilcha

PoliskeDibrova

Chornobyl

Dydiatky

Prypiat

ChNPP

Paryshiv

r Prypiat

Belarus

Radioactivity stocks distributed in natural and technogenicobjects at the Chornobyl exclusion zone (for 2001)

Spent fuel assembly ndash 21284spent additional absorber ndash 1753

Spent nuclear fuel of the Chornobyl NPP (reactor blocks Nos 12 and 3 and SNFDFndash1)

10260480740Object Shelterldquo (damaged nuclear fuel)

026510716TOTAL

0040714214Near surface points for temporary localization of radwaste (PTLRW)

0091836549Near surface radwaste disposal facilities (RWDF)

0002003019022Cooling pond of the Chornobyl NPP

0132555813Territory of the exclusion zone

TRU90Sr137CsTotal

Activity PBqObject

3

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Forest fire (May 8 2003)4

SS

SIE

ldquoEco

cent

rerdquo

2006

Distribution of soil surface layer contamination of 137Cs for 2002 within the borders of the CEZ

5

SSSI

E ldquoE

coce

ntre

rdquo 20

06

100057710002600TOTAL1280740410gt 3701270730820370224130277018516709650130741350788121037109063131340185530301584100743301919651003722013269700018503001772000074

Relative activity Activity PBqRelative

area Area km2Soil contamination 137Cs MBqm-2

Parameters of the exclusion zone sensitive to radiation monitoring issues

AreaBorder

Facilities

ForestsNatural effluents

2600 km2

Length of the border of the exclusion zone ndash 4412 km including international border with Belarus ndash 1545 kmChornobyl NPP Object ldquoShelterrdquo RWDF(ldquoBuriakivkardquo ldquoPidlisnyrdquo ldquoKompleksnyrdquo ldquo3rd linerdquo ldquoKorogodrdquo) PTLRW (about 800)About 70 of the territoryRiver Prypyat 4 ndash 18 wind resuspension07 TBqmiddot year-1

6

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Пункти дозиметричного контролю

Схема розміщення спостережних свердловин

СССхххееемммааа рррооозззммміііщщщееенннннняяя пппууунннккктттіііввв рррааадддіііааацццііійййнннооогггооокккооонннтттрррооолллююю ввв рррааайййооонннііі ПППЗЗЗРРРВВВ ldquoldquoldquoПППііідддллліііссснннииийййrdquordquordquo

CCххееммаа ррооззммііщщеенннняя ппууннккттіівв ррааддііааццііййннооггооккооннттррооллюю вв ррааййоонніі ППЗЗРРВВ ldquoldquoББуурряяккііввккааrdquordquo

Відкрита дренажна система з НС

Лівобережна дамба з каналом

Канал з перегороджуючою спорудою

Правобережна дамба з каналом

Правобережна насосна станція з напірним трубопроводом

Умовні позначення

Населені пункти

Державний кордон України

Межа зони відчуження

Автошляхи з покриттям

Ґрунтові шляхи

Лісові та польові шляхи

Гідрографія

Ліси

Залізниця

ЛюдвинiвкаЛюдвинiвка

Мережа радіоекологічного моніторингу

та радіаційного контролю

Пункти АСКРС

Пункти відбору проб поверхневих вод

Аспіраційні пристрої з безперервнимпрокачуванням

Планшети для збору атмосфернихвипадінь

Ландшафтні майданчики

Місця розташування свердловинрадіо-гідрогеологічного моніторингу

6

minusminus

Комплексні спостереження на ПЗРВ

Ogravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acirc Населені пункти радіоекологічногоконтролю

Перемички на водотоках

Дренажна завіса

1

Русловий проріз

Свердловини водозабірнаminus водознижуюча

Укріплення берега рПрипяті

який було реконструйовано у 1986р

Дамба

0 Насосна станція

Перегороджуюча споруда

Лівобережний скидний канал

Водоохоронні спорудиІснуючі

що проектуються

нс

33ςςς ςς ςςςς

0

Sampling points of radioecological network of SSSIE Ecocentre7

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Temporal pattern of the dose rate

1997 1998 1999 2000 2001 2002 2003

003

0035

004

0045

005

Y рік

ПЕДexp(λ

Cs137

(Y-1997)) мРгод

P29 - Бе нівкаP41 - Чорнобиль

The exposure dose rate (month-averaged) at points of the automated system of monitoring of radiation situation (ASMRS) of the Chornobyl exclusion zone in 1997 - 2003

(Protocol SCRM-98) attenuation function R(T) for the equivalent dose rate from 134Cs and 137Csas a result of vertical deepening in soil

R(T) = 018sdotexp(-T05) + 065sdotexp(-T162) [T] = year

T12 of 162 year equals to the annual decrease of 41 That gives the overall reduction of the external dose rate for the period of time from 1997 to 2003 approximately of 22

SS

SIE

ldquoEco

cent

rerdquo

2006

8

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 2: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Conventional signs

State Border of Ukraine

Border of territory handed over under jurisdiction of the Administration of the Exclusion zone in 1997

Western border of the Exclusion zone before 1997

Chornobyl NPP

Settlements of radioecologicalmonitoring

Isolines of the contamination density

of 137Cs kBqm2

Railway

a) main

b) auxiliary

c) conventional

Roads with blacktop coating

Earth road

Forest and field roads

Scale of the contamination

density of 137CskBqm2

20 0007 500

40 000

4 0002 0007500400

20010040

Kilometres

Surface soil 137Cs contamination of the Exclusion zone (for 01122002)

SS

SIE

ldquoEco

cent

rerdquo

2004

2

Vilcha

PoliskeDibrova

Chornobyl

Dydiatky

Prypiat

ChNPP

Paryshiv

r Prypiat

Belarus

Radioactivity stocks distributed in natural and technogenicobjects at the Chornobyl exclusion zone (for 2001)

Spent fuel assembly ndash 21284spent additional absorber ndash 1753

Spent nuclear fuel of the Chornobyl NPP (reactor blocks Nos 12 and 3 and SNFDFndash1)

10260480740Object Shelterldquo (damaged nuclear fuel)

026510716TOTAL

0040714214Near surface points for temporary localization of radwaste (PTLRW)

0091836549Near surface radwaste disposal facilities (RWDF)

0002003019022Cooling pond of the Chornobyl NPP

0132555813Territory of the exclusion zone

TRU90Sr137CsTotal

Activity PBqObject

3

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Forest fire (May 8 2003)4

SS

SIE

ldquoEco

cent

rerdquo

2006

Distribution of soil surface layer contamination of 137Cs for 2002 within the borders of the CEZ

5

SSSI

E ldquoE

coce

ntre

rdquo 20

06

100057710002600TOTAL1280740410gt 3701270730820370224130277018516709650130741350788121037109063131340185530301584100743301919651003722013269700018503001772000074

Relative activity Activity PBqRelative

area Area km2Soil contamination 137Cs MBqm-2

Parameters of the exclusion zone sensitive to radiation monitoring issues

AreaBorder

Facilities

ForestsNatural effluents

2600 km2

Length of the border of the exclusion zone ndash 4412 km including international border with Belarus ndash 1545 kmChornobyl NPP Object ldquoShelterrdquo RWDF(ldquoBuriakivkardquo ldquoPidlisnyrdquo ldquoKompleksnyrdquo ldquo3rd linerdquo ldquoKorogodrdquo) PTLRW (about 800)About 70 of the territoryRiver Prypyat 4 ndash 18 wind resuspension07 TBqmiddot year-1

6

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Пункти дозиметричного контролю

Схема розміщення спостережних свердловин

СССхххееемммааа рррооозззммміііщщщееенннннняяя пппууунннккктттіііввв рррааадддіііааацццііійййнннооогггооокккооонннтттрррооолллююю ввв рррааайййооонннііі ПППЗЗЗРРРВВВ ldquoldquoldquoПППііідддллліііссснннииийййrdquordquordquo

CCххееммаа ррооззммііщщеенннняя ппууннккттіівв ррааддііааццііййннооггооккооннттррооллюю вв ррааййоонніі ППЗЗРРВВ ldquoldquoББуурряяккііввккааrdquordquo

Відкрита дренажна система з НС

Лівобережна дамба з каналом

Канал з перегороджуючою спорудою

Правобережна дамба з каналом

Правобережна насосна станція з напірним трубопроводом

Умовні позначення

Населені пункти

Державний кордон України

Межа зони відчуження

Автошляхи з покриттям

Ґрунтові шляхи

Лісові та польові шляхи

Гідрографія

Ліси

Залізниця

ЛюдвинiвкаЛюдвинiвка

Мережа радіоекологічного моніторингу

та радіаційного контролю

Пункти АСКРС

Пункти відбору проб поверхневих вод

Аспіраційні пристрої з безперервнимпрокачуванням

Планшети для збору атмосфернихвипадінь

Ландшафтні майданчики

Місця розташування свердловинрадіо-гідрогеологічного моніторингу

6

minusminus

Комплексні спостереження на ПЗРВ

Ogravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acirc Населені пункти радіоекологічногоконтролю

Перемички на водотоках

Дренажна завіса

1

Русловий проріз

Свердловини водозабірнаminus водознижуюча

Укріплення берега рПрипяті

який було реконструйовано у 1986р

Дамба

0 Насосна станція

Перегороджуюча споруда

Лівобережний скидний канал

Водоохоронні спорудиІснуючі

що проектуються

нс

33ςςς ςς ςςςς

0

Sampling points of radioecological network of SSSIE Ecocentre7

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Temporal pattern of the dose rate

1997 1998 1999 2000 2001 2002 2003

003

0035

004

0045

005

Y рік

ПЕДexp(λ

Cs137

(Y-1997)) мРгод

P29 - Бе нівкаP41 - Чорнобиль

The exposure dose rate (month-averaged) at points of the automated system of monitoring of radiation situation (ASMRS) of the Chornobyl exclusion zone in 1997 - 2003

(Protocol SCRM-98) attenuation function R(T) for the equivalent dose rate from 134Cs and 137Csas a result of vertical deepening in soil

R(T) = 018sdotexp(-T05) + 065sdotexp(-T162) [T] = year

T12 of 162 year equals to the annual decrease of 41 That gives the overall reduction of the external dose rate for the period of time from 1997 to 2003 approximately of 22

SS

SIE

ldquoEco

cent

rerdquo

2006

8

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 3: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Radioactivity stocks distributed in natural and technogenicobjects at the Chornobyl exclusion zone (for 2001)

Spent fuel assembly ndash 21284spent additional absorber ndash 1753

Spent nuclear fuel of the Chornobyl NPP (reactor blocks Nos 12 and 3 and SNFDFndash1)

10260480740Object Shelterldquo (damaged nuclear fuel)

026510716TOTAL

0040714214Near surface points for temporary localization of radwaste (PTLRW)

0091836549Near surface radwaste disposal facilities (RWDF)

0002003019022Cooling pond of the Chornobyl NPP

0132555813Territory of the exclusion zone

TRU90Sr137CsTotal

Activity PBqObject

3

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Forest fire (May 8 2003)4

SS

SIE

ldquoEco

cent

rerdquo

2006

Distribution of soil surface layer contamination of 137Cs for 2002 within the borders of the CEZ

5

SSSI

E ldquoE

coce

ntre

rdquo 20

06

100057710002600TOTAL1280740410gt 3701270730820370224130277018516709650130741350788121037109063131340185530301584100743301919651003722013269700018503001772000074

Relative activity Activity PBqRelative

area Area km2Soil contamination 137Cs MBqm-2

Parameters of the exclusion zone sensitive to radiation monitoring issues

AreaBorder

Facilities

ForestsNatural effluents

2600 km2

Length of the border of the exclusion zone ndash 4412 km including international border with Belarus ndash 1545 kmChornobyl NPP Object ldquoShelterrdquo RWDF(ldquoBuriakivkardquo ldquoPidlisnyrdquo ldquoKompleksnyrdquo ldquo3rd linerdquo ldquoKorogodrdquo) PTLRW (about 800)About 70 of the territoryRiver Prypyat 4 ndash 18 wind resuspension07 TBqmiddot year-1

6

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Пункти дозиметричного контролю

Схема розміщення спостережних свердловин

СССхххееемммааа рррооозззммміііщщщееенннннняяя пппууунннккктттіііввв рррааадддіііааацццііійййнннооогггооокккооонннтттрррооолллююю ввв рррааайййооонннііі ПППЗЗЗРРРВВВ ldquoldquoldquoПППііідддллліііссснннииийййrdquordquordquo

CCххееммаа ррооззммііщщеенннняя ппууннккттіівв ррааддііааццііййннооггооккооннттррооллюю вв ррааййоонніі ППЗЗРРВВ ldquoldquoББуурряяккііввккааrdquordquo

Відкрита дренажна система з НС

Лівобережна дамба з каналом

Канал з перегороджуючою спорудою

Правобережна дамба з каналом

Правобережна насосна станція з напірним трубопроводом

Умовні позначення

Населені пункти

Державний кордон України

Межа зони відчуження

Автошляхи з покриттям

Ґрунтові шляхи

Лісові та польові шляхи

Гідрографія

Ліси

Залізниця

ЛюдвинiвкаЛюдвинiвка

Мережа радіоекологічного моніторингу

та радіаційного контролю

Пункти АСКРС

Пункти відбору проб поверхневих вод

Аспіраційні пристрої з безперервнимпрокачуванням

Планшети для збору атмосфернихвипадінь

Ландшафтні майданчики

Місця розташування свердловинрадіо-гідрогеологічного моніторингу

6

minusminus

Комплексні спостереження на ПЗРВ

Ogravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acirc Населені пункти радіоекологічногоконтролю

Перемички на водотоках

Дренажна завіса

1

Русловий проріз

Свердловини водозабірнаminus водознижуюча

Укріплення берега рПрипяті

який було реконструйовано у 1986р

Дамба

0 Насосна станція

Перегороджуюча споруда

Лівобережний скидний канал

Водоохоронні спорудиІснуючі

що проектуються

нс

33ςςς ςς ςςςς

0

Sampling points of radioecological network of SSSIE Ecocentre7

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Temporal pattern of the dose rate

1997 1998 1999 2000 2001 2002 2003

003

0035

004

0045

005

Y рік

ПЕДexp(λ

Cs137

(Y-1997)) мРгод

P29 - Бе нівкаP41 - Чорнобиль

The exposure dose rate (month-averaged) at points of the automated system of monitoring of radiation situation (ASMRS) of the Chornobyl exclusion zone in 1997 - 2003

(Protocol SCRM-98) attenuation function R(T) for the equivalent dose rate from 134Cs and 137Csas a result of vertical deepening in soil

R(T) = 018sdotexp(-T05) + 065sdotexp(-T162) [T] = year

T12 of 162 year equals to the annual decrease of 41 That gives the overall reduction of the external dose rate for the period of time from 1997 to 2003 approximately of 22

SS

SIE

ldquoEco

cent

rerdquo

2006

8

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 4: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Forest fire (May 8 2003)4

SS

SIE

ldquoEco

cent

rerdquo

2006

Distribution of soil surface layer contamination of 137Cs for 2002 within the borders of the CEZ

5

SSSI

E ldquoE

coce

ntre

rdquo 20

06

100057710002600TOTAL1280740410gt 3701270730820370224130277018516709650130741350788121037109063131340185530301584100743301919651003722013269700018503001772000074

Relative activity Activity PBqRelative

area Area km2Soil contamination 137Cs MBqm-2

Parameters of the exclusion zone sensitive to radiation monitoring issues

AreaBorder

Facilities

ForestsNatural effluents

2600 km2

Length of the border of the exclusion zone ndash 4412 km including international border with Belarus ndash 1545 kmChornobyl NPP Object ldquoShelterrdquo RWDF(ldquoBuriakivkardquo ldquoPidlisnyrdquo ldquoKompleksnyrdquo ldquo3rd linerdquo ldquoKorogodrdquo) PTLRW (about 800)About 70 of the territoryRiver Prypyat 4 ndash 18 wind resuspension07 TBqmiddot year-1

6

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Пункти дозиметричного контролю

Схема розміщення спостережних свердловин

СССхххееемммааа рррооозззммміііщщщееенннннняяя пппууунннккктттіііввв рррааадддіііааацццііійййнннооогггооокккооонннтттрррооолллююю ввв рррааайййооонннііі ПППЗЗЗРРРВВВ ldquoldquoldquoПППііідддллліііссснннииийййrdquordquordquo

CCххееммаа ррооззммііщщеенннняя ппууннккттіівв ррааддііааццііййннооггооккооннттррооллюю вв ррааййоонніі ППЗЗРРВВ ldquoldquoББуурряяккііввккааrdquordquo

Відкрита дренажна система з НС

Лівобережна дамба з каналом

Канал з перегороджуючою спорудою

Правобережна дамба з каналом

Правобережна насосна станція з напірним трубопроводом

Умовні позначення

Населені пункти

Державний кордон України

Межа зони відчуження

Автошляхи з покриттям

Ґрунтові шляхи

Лісові та польові шляхи

Гідрографія

Ліси

Залізниця

ЛюдвинiвкаЛюдвинiвка

Мережа радіоекологічного моніторингу

та радіаційного контролю

Пункти АСКРС

Пункти відбору проб поверхневих вод

Аспіраційні пристрої з безперервнимпрокачуванням

Планшети для збору атмосфернихвипадінь

Ландшафтні майданчики

Місця розташування свердловинрадіо-гідрогеологічного моніторингу

6

minusminus

Комплексні спостереження на ПЗРВ

Ogravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acirc Населені пункти радіоекологічногоконтролю

Перемички на водотоках

Дренажна завіса

1

Русловий проріз

Свердловини водозабірнаminus водознижуюча

Укріплення берега рПрипяті

який було реконструйовано у 1986р

Дамба

0 Насосна станція

Перегороджуюча споруда

Лівобережний скидний канал

Водоохоронні спорудиІснуючі

що проектуються

нс

33ςςς ςς ςςςς

0

Sampling points of radioecological network of SSSIE Ecocentre7

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Temporal pattern of the dose rate

1997 1998 1999 2000 2001 2002 2003

003

0035

004

0045

005

Y рік

ПЕДexp(λ

Cs137

(Y-1997)) мРгод

P29 - Бе нівкаP41 - Чорнобиль

The exposure dose rate (month-averaged) at points of the automated system of monitoring of radiation situation (ASMRS) of the Chornobyl exclusion zone in 1997 - 2003

(Protocol SCRM-98) attenuation function R(T) for the equivalent dose rate from 134Cs and 137Csas a result of vertical deepening in soil

R(T) = 018sdotexp(-T05) + 065sdotexp(-T162) [T] = year

T12 of 162 year equals to the annual decrease of 41 That gives the overall reduction of the external dose rate for the period of time from 1997 to 2003 approximately of 22

SS

SIE

ldquoEco

cent

rerdquo

2006

8

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 5: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Distribution of soil surface layer contamination of 137Cs for 2002 within the borders of the CEZ

5

SSSI

E ldquoE

coce

ntre

rdquo 20

06

100057710002600TOTAL1280740410gt 3701270730820370224130277018516709650130741350788121037109063131340185530301584100743301919651003722013269700018503001772000074

Relative activity Activity PBqRelative

area Area km2Soil contamination 137Cs MBqm-2

Parameters of the exclusion zone sensitive to radiation monitoring issues

AreaBorder

Facilities

ForestsNatural effluents

2600 km2

Length of the border of the exclusion zone ndash 4412 km including international border with Belarus ndash 1545 kmChornobyl NPP Object ldquoShelterrdquo RWDF(ldquoBuriakivkardquo ldquoPidlisnyrdquo ldquoKompleksnyrdquo ldquo3rd linerdquo ldquoKorogodrdquo) PTLRW (about 800)About 70 of the territoryRiver Prypyat 4 ndash 18 wind resuspension07 TBqmiddot year-1

6

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Пункти дозиметричного контролю

Схема розміщення спостережних свердловин

СССхххееемммааа рррооозззммміііщщщееенннннняяя пппууунннккктттіііввв рррааадддіііааацццііійййнннооогггооокккооонннтттрррооолллююю ввв рррааайййооонннііі ПППЗЗЗРРРВВВ ldquoldquoldquoПППііідддллліііссснннииийййrdquordquordquo

CCххееммаа ррооззммііщщеенннняя ппууннккттіівв ррааддііааццііййннооггооккооннттррооллюю вв ррааййоонніі ППЗЗРРВВ ldquoldquoББуурряяккііввккааrdquordquo

Відкрита дренажна система з НС

Лівобережна дамба з каналом

Канал з перегороджуючою спорудою

Правобережна дамба з каналом

Правобережна насосна станція з напірним трубопроводом

Умовні позначення

Населені пункти

Державний кордон України

Межа зони відчуження

Автошляхи з покриттям

Ґрунтові шляхи

Лісові та польові шляхи

Гідрографія

Ліси

Залізниця

ЛюдвинiвкаЛюдвинiвка

Мережа радіоекологічного моніторингу

та радіаційного контролю

Пункти АСКРС

Пункти відбору проб поверхневих вод

Аспіраційні пристрої з безперервнимпрокачуванням

Планшети для збору атмосфернихвипадінь

Ландшафтні майданчики

Місця розташування свердловинрадіо-гідрогеологічного моніторингу

6

minusminus

Комплексні спостереження на ПЗРВ

Ogravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acirc Населені пункти радіоекологічногоконтролю

Перемички на водотоках

Дренажна завіса

1

Русловий проріз

Свердловини водозабірнаminus водознижуюча

Укріплення берега рПрипяті

який було реконструйовано у 1986р

Дамба

0 Насосна станція

Перегороджуюча споруда

Лівобережний скидний канал

Водоохоронні спорудиІснуючі

що проектуються

нс

33ςςς ςς ςςςς

0

Sampling points of radioecological network of SSSIE Ecocentre7

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Temporal pattern of the dose rate

1997 1998 1999 2000 2001 2002 2003

003

0035

004

0045

005

Y рік

ПЕДexp(λ

Cs137

(Y-1997)) мРгод

P29 - Бе нівкаP41 - Чорнобиль

The exposure dose rate (month-averaged) at points of the automated system of monitoring of radiation situation (ASMRS) of the Chornobyl exclusion zone in 1997 - 2003

(Protocol SCRM-98) attenuation function R(T) for the equivalent dose rate from 134Cs and 137Csas a result of vertical deepening in soil

R(T) = 018sdotexp(-T05) + 065sdotexp(-T162) [T] = year

T12 of 162 year equals to the annual decrease of 41 That gives the overall reduction of the external dose rate for the period of time from 1997 to 2003 approximately of 22

SS

SIE

ldquoEco

cent

rerdquo

2006

8

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 6: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Parameters of the exclusion zone sensitive to radiation monitoring issues

AreaBorder

Facilities

ForestsNatural effluents

2600 km2

Length of the border of the exclusion zone ndash 4412 km including international border with Belarus ndash 1545 kmChornobyl NPP Object ldquoShelterrdquo RWDF(ldquoBuriakivkardquo ldquoPidlisnyrdquo ldquoKompleksnyrdquo ldquo3rd linerdquo ldquoKorogodrdquo) PTLRW (about 800)About 70 of the territoryRiver Prypyat 4 ndash 18 wind resuspension07 TBqmiddot year-1

6

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Пункти дозиметричного контролю

Схема розміщення спостережних свердловин

СССхххееемммааа рррооозззммміііщщщееенннннняяя пппууунннккктттіііввв рррааадддіііааацццііійййнннооогггооокккооонннтттрррооолллююю ввв рррааайййооонннііі ПППЗЗЗРРРВВВ ldquoldquoldquoПППііідддллліііссснннииийййrdquordquordquo

CCххееммаа ррооззммііщщеенннняя ппууннккттіівв ррааддііааццііййннооггооккооннттррооллюю вв ррааййоонніі ППЗЗРРВВ ldquoldquoББуурряяккііввккааrdquordquo

Відкрита дренажна система з НС

Лівобережна дамба з каналом

Канал з перегороджуючою спорудою

Правобережна дамба з каналом

Правобережна насосна станція з напірним трубопроводом

Умовні позначення

Населені пункти

Державний кордон України

Межа зони відчуження

Автошляхи з покриттям

Ґрунтові шляхи

Лісові та польові шляхи

Гідрографія

Ліси

Залізниця

ЛюдвинiвкаЛюдвинiвка

Мережа радіоекологічного моніторингу

та радіаційного контролю

Пункти АСКРС

Пункти відбору проб поверхневих вод

Аспіраційні пристрої з безперервнимпрокачуванням

Планшети для збору атмосфернихвипадінь

Ландшафтні майданчики

Місця розташування свердловинрадіо-гідрогеологічного моніторингу

6

minusminus

Комплексні спостереження на ПЗРВ

Ogravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acirc Населені пункти радіоекологічногоконтролю

Перемички на водотоках

Дренажна завіса

1

Русловий проріз

Свердловини водозабірнаminus водознижуюча

Укріплення берега рПрипяті

який було реконструйовано у 1986р

Дамба

0 Насосна станція

Перегороджуюча споруда

Лівобережний скидний канал

Водоохоронні спорудиІснуючі

що проектуються

нс

33ςςς ςς ςςςς

0

Sampling points of radioecological network of SSSIE Ecocentre7

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Temporal pattern of the dose rate

1997 1998 1999 2000 2001 2002 2003

003

0035

004

0045

005

Y рік

ПЕДexp(λ

Cs137

(Y-1997)) мРгод

P29 - Бе нівкаP41 - Чорнобиль

The exposure dose rate (month-averaged) at points of the automated system of monitoring of radiation situation (ASMRS) of the Chornobyl exclusion zone in 1997 - 2003

(Protocol SCRM-98) attenuation function R(T) for the equivalent dose rate from 134Cs and 137Csas a result of vertical deepening in soil

R(T) = 018sdotexp(-T05) + 065sdotexp(-T162) [T] = year

T12 of 162 year equals to the annual decrease of 41 That gives the overall reduction of the external dose rate for the period of time from 1997 to 2003 approximately of 22

SS

SIE

ldquoEco

cent

rerdquo

2006

8

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 7: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Пункти дозиметричного контролю

Схема розміщення спостережних свердловин

СССхххееемммааа рррооозззммміііщщщееенннннняяя пппууунннккктттіііввв рррааадддіііааацццііійййнннооогггооокккооонннтттрррооолллююю ввв рррааайййооонннііі ПППЗЗЗРРРВВВ ldquoldquoldquoПППііідддллліііссснннииийййrdquordquordquo

CCххееммаа ррооззммііщщеенннняя ппууннккттіівв ррааддііааццііййннооггооккооннттррооллюю вв ррааййоонніі ППЗЗРРВВ ldquoldquoББуурряяккііввккааrdquordquo

Відкрита дренажна система з НС

Лівобережна дамба з каналом

Канал з перегороджуючою спорудою

Правобережна дамба з каналом

Правобережна насосна станція з напірним трубопроводом

Умовні позначення

Населені пункти

Державний кордон України

Межа зони відчуження

Автошляхи з покриттям

Ґрунтові шляхи

Лісові та польові шляхи

Гідрографія

Ліси

Залізниця

ЛюдвинiвкаЛюдвинiвка

Мережа радіоекологічного моніторингу

та радіаційного контролю

Пункти АСКРС

Пункти відбору проб поверхневих вод

Аспіраційні пристрої з безперервнимпрокачуванням

Планшети для збору атмосфернихвипадінь

Ландшафтні майданчики

Місця розташування свердловинрадіо-гідрогеологічного моніторингу

6

minusminus

Комплексні спостереження на ПЗРВ

Ogravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acircOgravearingetharingotildesup3acirc Населені пункти радіоекологічногоконтролю

Перемички на водотоках

Дренажна завіса

1

Русловий проріз

Свердловини водозабірнаminus водознижуюча

Укріплення берега рПрипяті

який було реконструйовано у 1986р

Дамба

0 Насосна станція

Перегороджуюча споруда

Лівобережний скидний канал

Водоохоронні спорудиІснуючі

що проектуються

нс

33ςςς ςς ςςςς

0

Sampling points of radioecological network of SSSIE Ecocentre7

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Temporal pattern of the dose rate

1997 1998 1999 2000 2001 2002 2003

003

0035

004

0045

005

Y рік

ПЕДexp(λ

Cs137

(Y-1997)) мРгод

P29 - Бе нівкаP41 - Чорнобиль

The exposure dose rate (month-averaged) at points of the automated system of monitoring of radiation situation (ASMRS) of the Chornobyl exclusion zone in 1997 - 2003

(Protocol SCRM-98) attenuation function R(T) for the equivalent dose rate from 134Cs and 137Csas a result of vertical deepening in soil

R(T) = 018sdotexp(-T05) + 065sdotexp(-T162) [T] = year

T12 of 162 year equals to the annual decrease of 41 That gives the overall reduction of the external dose rate for the period of time from 1997 to 2003 approximately of 22

SS

SIE

ldquoEco

cent

rerdquo

2006

8

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 8: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Temporal pattern of the dose rate

1997 1998 1999 2000 2001 2002 2003

003

0035

004

0045

005

Y рік

ПЕДexp(λ

Cs137

(Y-1997)) мРгод

P29 - Бе нівкаP41 - Чорнобиль

The exposure dose rate (month-averaged) at points of the automated system of monitoring of radiation situation (ASMRS) of the Chornobyl exclusion zone in 1997 - 2003

(Protocol SCRM-98) attenuation function R(T) for the equivalent dose rate from 134Cs and 137Csas a result of vertical deepening in soil

R(T) = 018sdotexp(-T05) + 065sdotexp(-T162) [T] = year

T12 of 162 year equals to the annual decrease of 41 That gives the overall reduction of the external dose rate for the period of time from 1997 to 2003 approximately of 22

SS

SIE

ldquoEco

cent

rerdquo

2006

8

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 9: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Deflation coefficient of 137Cs observed at Chornobyl in 1986 - 2002

9

SSSI

E ldquoE

coce

ntre

rdquo 20

06

KD = 24middot10-7middote-T06 + 23middot10-10middote-T154 m-1 [T] = year

1986 1988 1990 1992 1994 1996 1998 2000 200210-11

10-10

10-9

10-8

10-7

10-6

10-5

Years

Def

latio

nco

effic

ient

m-1

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 10: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Elia preserve located in the north-west within the Exclusion Zone on the border to Belorussia

10

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 11: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Reactor blocks 5 and 6 of Chornobyl NPP 11

SS

SIE

ldquoEco

cent

rerdquo

2006

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 12: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Project detailsDonor

BeneficiaryContractor

End ndash userContract

TermsRegistration

Responsible person

EC (in framework of TACIS project U40103 S)Ministry of Ukraine for Emergencies Consortium UkrAtomPrylad (Ukraine) ndash Genitron (Germany)SSSIE ldquoEcocentrerdquoNo 76903 id No EuropeAid 119121 DSUA December 28 200528062007 (18 months)No ____ dated ____2006 by Ministry of Economy of UkraineDr OBondarenko Director

12

SSSI

E ldquoE

coce

ntre

rdquo 20

06

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 13: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

ObjectiveModernisation of the existing ASMRS according to modern requirements to radiation monitoring systems and using suitable existing engineering and technical constructions roads and communication lines

13

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 14: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Targets to be achieved by the project

Current status29 old DR sensors4 old aerosol samplersWire communication with a central unitOld central unit

Status to be achieved39 new DR sensors18 new aerosol samplersRadio communication with a central unitNew central unit1 aerosol monitorMeteorological stationModeling software

14

SSSI

E ldquoE

coce

ntre

rdquo 20

06

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed

Page 15: Modernisation of the automated system for monitoring of … · 2018-10-23 · P41 - Чорнобиль The exposure dose rate (month-averaged) at points of the automated system of

Work plan of the project15

SS

SIE

ldquoEco

cent

rerdquo

2006

= (D0+79) 28062007

Drawing-up the reports under the project

D0+77Acceptance tests commissioning of the system final acceptance of the modernised ASMRS

D0+74Training of the Contracting Authority personnel

D0+72Metrological certification of all system

D0+70Provisional acceptance of the goods and release the pre-financing guarantee

D0+69Start-up and adjustment of ASMRS software verification

D0+61Montage preliminary adjusting

D0+58Delivery of the equipment for the final montage (assembly installation) stage to the warehouse of the Contracting Authority

D0+52Manufacturing and procurement of the equipment

D0+17Approval of Technical Specification design documentation for technical means and software

D0+16Works on pre-project survey and construction design works

D0+14Development of Technical Specification design documentation for technical means and software

D0+8Concluding the subcontract with Genitron for manufacture delivery and montage of supplied equipment

28122005Signing the Contract by all Parties

TermsThe name of works to be performed