MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on...

8
-1- BEFORE YOU BEGIN BEFORE YOU BEGIN MODERN LIFE INSTALLATION INSTRUCTIONS CABINET K-77137T-M/K-77138T-M/K-77139T-M · · · · · · · · Please read these instructions carefully to familiarize yourself with the required tools, materials, and installation sequences. Follow the sections that pertain to your particular installation. This will help you avoid costly mistakes. In addition to proper installation, read all operating and safety instructions. All information in these instructions is based upon the latest product information available at the time of publication. Kohler China. reserves the right to make changes in product characteristics, packaging, or availability at any time without notice. These instructions contain important care, cleaning, and warranty information- Turn off the water supply. The pluming installation must comply with Water Supply Regulations/Bye-laws, Building Regulations or any particular regulations and practices, specified by the local water company or water undertakers. The installation should be carried out by a plumber. Before installation carefully inspect the new fixture for any signs of damage. This product complies with GB 24977-2010. please leave instructions for the consumer. MODERN LIFE cabinet adopts E1 grade wood-based panel of high quality, and with further processing, its harmful emissions will be less than 1.5mg/L. · · · · · · · · - E1 1.5mg/L GB 24977-2010 ORDERING INFORMATION This installation covers the following products in the MODERN LIFE range: MODERN LIFE 1200mm Cabinet ..................K-77137T-M MODERN LIFE 900mm Cabinet ....................K-77138T-M MODERN LIFE 600mm Cabinet ....................K-77139T-M 1200mm .......................................K-77137T-M 900mm .........................................K-77138T-M 600mm .........................................K-77139T-M SAFETY WARNINGS Kohler products are precision-engineered and should give continued superior and safe performance, provided: 1. They are installed, commissioned, operated and maintained in accordance with the recommendations given in this Manual. 2. Periodic attention is given, as necessary, to maintain the product in good functional order. Recommended guidelines are given in the section. Carefully inspect the new fixture for any signs of damage. When installing Kohler Products, manufacturers guidelines for power tool safety should be followed. MAINTENANCE 1. 2. KOHLER CHINA INVESTMENT CO., LTD NO.158, JIANG CHANG SAN ROAD, JING'AN DISTRICT, SHANGHAI, PRC POST CODE: 200436 ( ) 158 200436 © © Copyright Kohler China Investment Co., Ltd. 2019 2019 1412471-T01-A

Transcript of MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on...

Page 1: MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on the wall according to the holes on the cabinet d. back board, insert expanding dowels

-1-

BEFORE YOU BEGINBEFORE YOU BEGIN

MODERN LIFEINSTALLATION INSTRUCTIONS

CABINET

K-77137T-M/K-77138T-M/K-77139T-M

Please read these instructions carefully to familiarizeyourself with the required tools, materials, and installationsequences. Follow the sections that pertain to yourparticular installation. This will help you avoid costlymistakes. In addition to proper installation, read alloperating and safety instructions.All information in these instructions is based upon thelatest product information available at the time ofpublication. Kohler China. reserves the right to makechanges in product characteristics, packaging, oravailability at any time without notice.These instructions contain important care, cleaning, andwarranty information-

Turn off the water supply.The pluming installation must comply with Water SupplyRegulations/Bye-laws, Building Regulations or anyparticular regulations and practices, specified by the localwater company or water undertakers. The installationshould be carried out by a plumber.Before installation carefully inspect the new fixture for anysigns of damage.This product complies with GB 24977-2010.

please leave instructions for the

consumer.MODERN LIFE cabinet adopts E1 grade wood-basedpanel of high quality, and with further processing, itsharmful emissions will be less than 1.5mg/L.

-

E11.5mg/L

GB 24977-2010

ORDERING INFORMATION

This installation covers the following products in the

MODERN LIFE range:

MODERN LIFE 1200mm Cabinet ..................K-77137T-M

MODERN LIFE 900mm Cabinet ....................K-77138T-M

MODERN LIFE 600mm Cabinet ....................K-77139T-M

1200mm .......................................K-77137T-M

900mm .........................................K-77138T-M

600mm .........................................K-77139T-M

SAFETY WARNINGS

Kohler products are precision-engineered and should givecontinued superior and safe performance, provided:

1. They are installed, commissioned, operated andmaintained in accordance with the recommendations givenin this Manual.

2. Periodic attention is given, as necessary, to maintain theproduct in good functional order. Recommendedguidelines are given in the section.

Carefully inspect the new fixture for any signs of damage.

When installing Kohler Products, manufacturers guidelines forpower tool safety should be followed.

MAINTENANCE

1.

2.

KOHLER CHINA INVESTMENT CO., LTD NO.158, JIANG CHANG SAN ROAD,JING'AN DISTRICT, SHANGHAI, PRC POST CODE: 200436

( ) 158 200436

©

©

Copyright Kohler China Investment Co., Ltd. 2019

20191412471-T01-A

Page 2: MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on the wall according to the holes on the cabinet d. back board, insert expanding dowels

Fig.22

ROUGHING-IN

INSTALLATION

-2-

UNIT : mm

A. Before Installation

Before cabinet installation, please reserve 0.5m, 220V power

line on the wall for background light connection (see Fig.2).

A.

0.5m 220V

( 2)

Fig.11

UNIT : mm

Kohler reserves the right to change marked dimensions without prior notice.

Reference

470 568

500

462

904

500

462

1204

500

K-77137T-MMODERN LIFE 1200mm

1200mmCabinet

K-77138T-MMODERN LIFE 900mm

900mmCabinet

K-77139T-MMODERN LIFE 600mm Cabinet

600mm

Area for installing the cabinet

Reserve the 220V line

220V

1412471-T01-A

Page 3: MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on the wall according to the holes on the cabinet d. back board, insert expanding dowels

-3-

B. Install Washbasin Cabinet

Install the services.Hot (H) and Cold (C) inlets must be connected to the correctinlet pipes.Install the drain in accordance with the manufacturer'sinstructions.We suggest using P-trap drain. Connect P-trap pipe withwashbasin drain.

Make sure a watertight seal exisits on allwashbasin drain connections.

Provide access to the plumbing connectionsfor future plumbing maintenance.

The hot and cold water supplies must be installed withisolating valves.

Caution!

Caution!

B.

(H) (C)

P

1.1. Mark the position of hanged bracket and wall boltaccording to dimensions as illustrated, and loosen thesuspension hook of washbasin cabinet.

Avoid the cables and pipes inner set whendrilling in the wall.

Different types of bolts are required for differentdecoration boards. Please apply suitable bolts and plugs.

Caution!

Note:

UNIT : mm

Fig.44

CenterCabinet WallBolt Holes

CabinetOutline

Wall Bracket

500

270

603

82820

568

**

CenterCabinet WallBolt Holes

Cabinet Outline

Wall Bracket

500

300

583

830

904

20

* *

*Refer to Vanity Wall Bolt Holes

*

Fig.33

**Refer to the following pictures for the wall installation

positions of the faucet inlet angle valve and the floor drain

hole.

K-77139T-M

K-77139T-M

K-77138T-M

K-77138T-M

CenterCenterCenter

Inlet Angle Valve Set AreaInlet Angle Valve Set AreaInlet Angle Valve Set Area

CabinetOutline

CabinetOutline

CabinetOutline

FloorFloorFloor

Wall

Wall

Wall

1204904568

505050 552

552

552

552

505050

500

500

500

500

500

500

380

380

380

300

300

270

Ground Drain Hole Set AreaGround Drain Hole Set AreaGround Drain Hole Set Area150150

150

402 402234

234

234

234

K-77137T-M

402 402

1412471-T01-A

Page 4: MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on the wall according to the holes on the cabinet d. back board, insert expanding dowels

Fig.44

2.

3.

65-75mm

2. Drill holes for fixing the bracket and bolt. Using a level toensure that the hanged bracket is level.

3. Use suitable plugs and bolts, and fix the bracket and bolton the wall. Fix the bolts supplied with the vanity on thewall. Each bolt shall be 65-75mm out of the wall.

4.

5. 1200mm 4

4. Install adjustable feet first if needed.

MODERN LIFE 1200mm cabinet is equipped with middlesupport foot. Fix the foot onto wall as shown in Fig.4. (Besure to use the metal expansion screw supplied.)

5.

Fig.55

-4-

Cabinet Outline

Vanity Wall bolt Holes

Center

Cabinet Wall bolt Holes

Wall bracket

L-shaped BracketL

L-shaped bracket must be fixed with thescrew on the bottom shelf.L-shaped bracket must be fixed on the wall

(Refer to installation instructions of the bracket)L

500

300

20

200 200 200 200

1204

538

830

399430

360

K-77137T-M

1412471-T01-A

Page 5: MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on the wall according to the holes on the cabinet d. back board, insert expanding dowels

-5-

6.

7.

a.

b. 2

6. Fix faucet and drain according to their installation

instructions.

7. Fix onto wall.a. Lift the cabinet and vanity by two people. Align the vanity

hanging hole with the bolts on the wall. Make the boltsthrough the vanity hanging hole.

b. Hang the two back wall clips onto the pre-fixed bracket onthe wall.

Fig.66

Vanity Wall Bolt Holes

Wall Bracket

First

Second

c.c. Adjust the cabinet and vanity level. Put the cabinet against

the wall by adjusting the screws of wall clips.

MAX1

2 431

Fig.77

1412471-T01-A

Page 6: MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on the wall according to the holes on the cabinet d. back board, insert expanding dowels

-6-

d.d. Drill holes on the wall according to the holes on the cabinet

back board, insert expanding dowels and then fix cabinet

onto wall with screws supplied.

88 Hole

Fig.88

8. Connect water pipe and drain by professionals to ensure

there is no leakage.

Note:

Note:

Different types of bolts are required for different

decoration boards. Please apply suitable bolts and plugs.

9. Adjust the screw with the wrench supplied to lift the support

foot and make sure it is firmly attached to the cabinet bottom.

The support foot is the important part that must be

installed to prevent the cabinet from descending. It must be

firmly attached to the cabinet bottom (use the wrench until the

screw is completely tightened.)

8.

9.

( )

e.e. Open the cabinet door and the drawer. Fix the bolt

according the vanity installation instructions. Before that ,

please apply silicone sealant onto the contact surface of

the vanity and the wall.

WasherNut

Offset Nut

Fig.99

1412471-T01-A

Page 7: MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on the wall according to the holes on the cabinet d. back board, insert expanding dowels

Fig.1010

a. (P )

/ U

Connect Drainage

a. Inwall drainage (P-Trap)

Please install the drain assembly and faucet as shown.

Please set the water supply and drainage position

according to the suppliers instructions. You can put the

pipe into the U Notch.

Faucet

Supply Lines

Shut-off Valve

Drain Assembly

-7-

b. S

U

b. Floor drainage (S-Trap)

Please install the drain assembly and faucet as shown.

Please set the water supply and drainage position

according to the suppliers instructions. You can put the

pipe into the U Notch.

Faucet

Supply Lines

Shut-off Valve

Drain Assembly

Ripple Pipe

Outlet

Fig.1111

1412471-T01-A

Page 8: MODERN LIFE - Kohler Co.resources.kohler.com/plumbing/kohlerapac/pdf/77138T...-6-d. Drill holes on the wall according to the holes on the cabinet d. back board, insert expanding dowels

-8-

Fig.1212

10.

a.

b.

10. Ajust the cabinet.

a. Place the hinge cover and plastic cover(in the hardware

pack).

b. Adjust the hinge of door in 3 direction to make sure the

door level.

1.

2.

3.

4.

5.

6.

7.

USER MAINTENANCEUSER MAINTENANCE

Warning! Risk of product damage.

1.

2.

3.

4.

5.

6. Please do not sit, lean or step on the basin cabinet.

7. If any fixtures caused by abnormal reasons, Kohler Chinacan supply paid replacement for service parts caused byabnormal reasons as shown in the Service Parts Page inthe limited duration of warranty.

Many cleansers contain abrasive and chemical substancewhich is not suitable for cleaning stainless steel, enamel,plating or plastic products. You may use mild cleansers orsoaps to clean the surfaces. Wipe any splashes of cleanersolutions from the surface with clean soft cloth.

Maintain ventilation in the bathroom, and separate the dryarea from the damp one if conditions permit. Try to openthe door and windows of the bathroom and maintain goodventilation.

Kohler bathroom cabinet are dealt with strict proceduresfor damp-proof, whose good damp-proof function ensuresgood performance even in bathroom of huge humidity. Yetdo not splash and pour water directly on the bathroomcabinet. Make sure that the bathroom is not over dampand wipe any splashes from surfaces immediately.

Maintenance of door board: Clean and wipe door boardregularly, and wipe the condensation vapor with dry andsoft cloth.

Ensure that electrical connections for appliances such ashead lamp is insulated wipe mirror surface with chamoisregularly to guarantee the persistent excellent performance.

1412471-T01-A