Model d assembly instructions

20

description

 

Transcript of Model d assembly instructions

Page 1: Model d assembly instructions
Bill
Text Box
Plywood
Bill
Line
Bill
Rectangle
Bill
Highlight
Bill
Rectangle
Bill
Rectangle
Bill
Rectangle
Bill
Highlight
Bill
Rectangle
Bill
Rectangle
Bill
Rectangle
Bill
Rectangle
Bill
Highlight
Bill
Highlight
Bill
Line
Bill
Highlight
Bill
Highlight
Bill
Highlight
Bill
Highlight
Bill
Highlight
Bill
Line
Bill
Line
Bill
Highlight
Bill
Highlight
Bill
Line
Bill
Line
Bill
Highlight
Bill
Line
Bill
Line
Bill
Rectangle
Bill
Line
Bill
Line
Bill
Highlight
Bill
Line
Bill
Rectangle
Bill
Rectangle
Bill
Rectangle
Bill
Polygon
Bill
Polygon
Bill
Polygon
Bill
Polygon
Bill
Polygon
Bill
Highlight
Bill
Highlight
Bill
Line
Bill
Polygon
Bill
Polygon
Bill
Polygon
Bill
Text Box
Barrel Ramp Assembly
Bill
Polygon
Bill
Polygon
Bill
Polygon
Bill
Polygon
Bill
Polygon
Bill
Polygon
Bill
Highlight
Bill
Highlight
Bill
Highlight
Bill
Highlight
Bill
Arrow
Bill
Text Box
90 Degree Turn
Bill
Text Box
Main Tube Assembly
Bill
Text Box
Control Unit
Bill
Text Box
Base Plate
Bill
Text Box
Power Supply
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Text Box
Once unpacked,You should have these parts
Bill
Text Box
Crank handle may be seperate
Bill
Arrow
Page 2: Model d assembly instructions
Bill
Text Box
1. Remove four screws
Bill
Arrow
Page 3: Model d assembly instructions
Bill
Text Box
2. Mount Main Tube Assembly to Base Plate
Bill
Arrow
Bill
Arrow
Page 4: Model d assembly instructions
Bill
Text Box
3. Remove Two screws
Bill
Arrow
Page 5: Model d assembly instructions
Bill
Text Box
4. Mount Control Unit Pay attention to alignment marks
Bill
Arrow
Bill
Arrow
Page 6: Model d assembly instructions
Bill
Text Box
5. Remove Two Screws
Bill
Arrow
Page 7: Model d assembly instructions
Bill
Text Box
6A. Mount Barrel Ramp Assembly (This Step Requires Two People)
Page 8: Model d assembly instructions
Bill
Text Box
6B. Install screws insuring stop block is aligned with marks and down flush. (See Next Sheet)
Page 9: Model d assembly instructions
Bill
Text Box
6C. Align marks Must be flush
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Text Box
Stop Block
Bill
Arrow
Page 10: Model d assembly instructions
Bill
Text Box
7A. Remove thumb Screw
Bill
Arrow
Page 11: Model d assembly instructions
Bill
Text Box
7B. Attach 90 degree turn paying attention to alignment marks. (See Next Sheet)
Bill
Arrow
Page 12: Model d assembly instructions
Bill
Text Box
7C. Alignment Marks
Bill
Arrow
Bill
Text Box
Unlock 90 degree turn to reposition if necessary. (see next two sheets)
Bill
Arrow
Page 13: Model d assembly instructions
Bill
Text Box
After attaching 90 degree turn it should look like this (See next sheet)
Bill
Arrow
Bill
Arrow
Page 14: Model d assembly instructions
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Arrow
Page 15: Model d assembly instructions
Bill
Text Box
8. Insert air switch lines firmly into fittings
Page 16: Model d assembly instructions
Bill
Text Box
9. Insert air Cylinder line firmly into fittings
Page 17: Model d assembly instructions
Bill
Text Box
10. Route Vibrator line between post and acme threaded rod.
Bill
Text Box
Vibrator
Bill
Text Box
Acme threaded rod
Bill
Arrow
Bill
Arrow
Bill
Text Box
Vertical tube
Bill
Arrow
Bill
Text Box
Vibrator line
Bill
Arrow
Bill
Arrow
Bill
Arrow
Page 18: Model d assembly instructions
Bill
Text Box
11. Attach connections as shown
Page 19: Model d assembly instructions
Bill
Text Box
12. Attach crank handle assuring set screw is seated in hole on Acme threaded rod.
Bill
Arrow
Page 20: Model d assembly instructions
Bill
Text Box
For the final step, remove the plastic bands from the barrel ramp assembly, plug in the air and power supply, and load the barrel with 50-150 corks. Once the machine is reassembled, it should be ready to begin corking. All adjustments were preset before shipping. Feel free to call with any questions or concerns. CCR Engineering (843) 559-9533
Bill
Text Box
Use this knob to adjust barrel RPM (approx.5-6)
Bill
Text Box
This toggle switch turns barrel rotation on and off.
Bill
Text Box
This toggle switch turns the vibration on and off. The regulator it is attached to adjusts the vibration intensity (approx. 5-20 PSI)
Bill
Text Box
Plug in air here
Bill
Text Box
Push bottle back into the V shaped bottle stop. This will actuate cork insertion.
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Arrow
Bill
Arrow