MLPS Presentation for the Steering Committee Session from February 21, 2014

45
Pagina 1 Steering Committee Session February 21, 2014 Modernization of Local Public Services in the Republic of Moldova

description

 

Transcript of MLPS Presentation for the Steering Committee Session from February 21, 2014

Page 1: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 1

Steering Committee Session

February 21, 2014

Modernization of Local Public Services in the Republic of

Moldova

Page 2: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 2

• Based on bilateral Government negotiations Moldova-Germany Nov 2009

• Duration 6 years: 1/2010 – 12/2015

• Main Institutional Counterpart: Ministry of Regional Development and Constructions and the Regional Development Agencies

• German contribution: 17.9 Mio. €• Technical assistance – 10.6 Mio. €• German Investment Support – 7.3 Mio. €

• Co-Financing by Romanian Government of 0.7 Mio. €• Co-Financing by Swedish Government of 5.5 Mio. €• Co-Financing by European Union 5.0 Mio. €

Modernization of Local Public Servicesin the Republic of Moldova

Page 3: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 3

• Overall: 17.9 Mio €

• Technical assistance – 10.6 Mio €• 2010 – 2013: 5.1 Mio €• 2014: 2.0 Mio €• Pilot Project Investments: 3.6 Mio €

• German Investment Support – 7.3 Mio €• Investments• 12 RDA staff (4 North / 5 Center / 3 South)

German contribution 17.9 Mio. €

Page 4: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 4

Pilot project - capital investment and procurement of equipment

Improving water and sewerage supply in Rosu village, Cahul rayon

Co-Financing by Romanian Government of 0.7 Mio. €

Page 5: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 5

3.3 Mio. € (2012-2014) • Regional Operational Plans on WSS, SWM & EE of public buildings (by

RDAs North, Centre and South).

• Regional indicators on a. m. areas established & data bases developed.

• Models of transparent and participatory design processes for preparing Regional Operational Plans, based on sector focus groups with participation of key stakeholders of the respective sectors, civil society and private sector as well as external specialists drafted.

• Formal mechanisms and procedures for coordination and collaboration with responsible sector ministries (Environment and Economy established.

Co-Financing by Swedish Government of 5.5 Mio. €

Page 6: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 6

Co-Financing by Swedish Government of 5.5 Mio. €

2.2 Mio. € (2014)• Support to regional development institutions and local public

authorities. > Implementation of investment projects to improve local public service delivery.

Benchmarks:• Investment projects prepared for Regional Development to

ready-for-procurement stage (volume 6 million EUR). • Project implementation management by RDAs without

major shortcomings (related investment funding provided by Germany).

• Improved management of projects by LPAs, supported by certified energy auditors, financed by the National Fund for Energy Efficiency.

Page 7: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 7

Co-Financing by European Union 5.0 Mio. €

Overall objec-tive

Support Moldova in advancing its economic, social and territorial cohesion with focus on development of policy, legal, institutional and developmental framework for an effective development policy for Moldova’s regions.

Purpose • Facilitate a regional planning process leading to the development of a project pipeline relevant to specified areas & concerns of MD’s RD & EU Cohesion Policy.

• Develop capacities essential to sustaining the above objectives and support the wider regional development process.

Expec-ted results

• Detailed regional plans covering five thematic fields essential to the development of Moldova’s regions (WSS, SWM, local roads of key importance & from these updated regional operational plans for each region (N, S, C).

• Updated regional operational plans for each region where RD institutions are in place.

• Validated capacity among responsible bodies relevant to the above results, including capacity to continuously manage a project pipeline.

• Pipeline of ready to go, ready to finance and ready to procure projects.

Page 8: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 8

Intervention Area 1 – Local Public ServicesProgress July – December 2013 < & > Outlook 2014

Modernization of Local Public Services (MLPS) in the Republic of Moldova

Chişinău, 21 Feb 2014

Page 9: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 910/04/2023

Basic Assumption

Planned and implemented activities lead to achieving progress regarding IA1 Objective

Local Public Authorities effectively cooperate

and manage improvements of local public services in the

selected communities in pilot rayons

Page 10: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 10

Efficient Local Public

Services

Support Model

Comprehensive Approach

… for enhancedsustainability

Page 11: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 1110/04/2023

IA1 Result Model > LPAs‘ development strategically integrated> Affordability

> LPAs cooperate> Affordability

> Sustainable services> Affordability & quality> Professional public procurement

> Sustainable, effective service delivery & management> Affordability> Best practices disseminated

> Best practices communicated> Utilisation of new services

Page 12: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 14

Improvement of WSS services in Riscani rayon

Improvement of WSS services in Cahul rayon

Improvement of WSS services in Iargara, Leova rayon

Energy Efficiency of Public Buildings in Orhei Rayon, Orhei Regional

Hospital

Energy Efficient Street Lighting in Soroca Rayon

Improvement of Solid Waste Management Services in Soldanesti,

Rezina & Floresti Rayons

Energy Efficiency of Public Buildings in Nisporeni Rayon, Nisporeni

Regional Hospital

Background Map Source: MRDC

Page 13: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 15

< 1. Local Strategic Planning & Programming

SWM• Agreed on clean-up program of 4 temporary dumpsites• Agreed on collection start-up support (routing)• Parcanci landfill-site confirmed• FS being finalised• SEDS SWM process ongoing

WSS• FS Cahul & Riscani Rayon being finalised (amended focus)• Leova Rayon declared MLPS project rayon, activities started, MoU

pending, SEDS & FS to finalise prior to detailed investment planning

EE• SEDS EE update for Orhei & Soroca Rayon started

Page 14: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 16

< 2. Inter-municipal Cooperation

SWM• LPAs agreed on selection of 4 temporary landfill-sites for clean-up• 67 LPAs agreed on IMC-institutionalisation• 35 LPAs received assistance for service provision• 20 LPAs adopted joining JSC & local tax, process ongoing WSS• Cahul Rayon: Institutionalisation of IMC WSS services, process ongoing, 3

primarias adopted decision on joining• Riscani Rayon: 2 study visits (> RO & PL) on IMC based services

completed• Riscani Rayon: Discussion on IMC initiated & ongoing (> 10 LPAs)EE• Tatarauca Veche, Soroca: discussion on extension of IMC based service

provision initiated (> 6 LPAs)Cross-cutting• Discussion > State Chancellery, CALM & others on legal aspects of IMC

institutionalisation & service cost recovery, value assessment etc. ongoing

Page 15: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 17

< 3. Capital investments & acquisition of equipmentSWM• All equipment procured & transferred• Technical design for recycling yard Floresti completedWSS• 75% of Rosu households connected to water supply• Tender doc preparation for 6 subprojects ongoingEE Orhei: • 5 sub-projects completed & transferred • Smart energy efficiency monitoring system• Installation of 3 heating substations• Entrance reconstruction ongoingEE Nisporeni• Tender docs under preparationEE Tatarauca Veche • Completed, operational, transferred & awarded Eco-Energetica AwardCross-cutting• RDA capacitated & assisted in public procurement & reporting

Pls see hand-out

for financial overview

Page 16: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 18

< 4. Capacity Development of LPAs & Service Providers

SWM• Capacity development action plan developed• Discussion on service fee collection ongoing (local tax?)

WSS• Capacity development action plan developed• Riscani Rayon: 2 study visits (> RO & PL) completed

EE Orhei hospital• Energy manager in place• Energy management team in place• Training for Energy management team delivered

Cross-cutting• Process to register public infrastructure started

Page 17: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 19

< 5. Community mobilization & citizens’ engagement

SWM• Community mobilisation ongoing• NGO contracted to support awareness campaign for SWM-system start

WSS• NGO to support community mobilisation for entire Cahul rayon selected• Rosu: 75% of connected pay regularly for drinking water• Duruitoarea Veche: 90% pay regularly for drinking water

EE Orhei hospital• Beneficiary aware about system management and monitoring• Up-scaling of experiences postponed

EE Tatarauca Veche• Awareness campaign re citizens’ payments ongoing (65% paying)

Page 18: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 20

Concerns to address

• Investments & -volumes alone do not guarantee RD;• Local project managers in support of RDA implementation?• Capacity of RDAs incl. consideration of pentagon elements?• Land-use planning > update general plans!• Technical standards!• Statistical system!• Involvement of sector ministries!• Viable & lean IMC forms! • … ?

Issues for D

iscussion

Page 19: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 21

Issues for D

iscussion

MLPS IA2 Project Pipeline

Projections for project development volumes ready by end of 2015

Urgent

requirements for

Implementation:

>>> Capacitated implementers > ? + ? + outreach to local level ?

>>> Securing measures ?

>>> Funding ?

Sector ~ No. of Projects ~ Mio. € (totals)EE (Jan 2014)EE (end 2015)

913-15

912

SWM 3 30

WSS 10 28

Roads 10 30

Total 47 109

Page 20: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 22

Efficient Local Public

Services

Support Model

Comprehensive Approach

… for enhancedsustainability

Page 21: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 23

> 1. Local Strategic Planning and Programming

Integrated / compiled at level of rayons / according to LPAs’ needs & regional / national sectorial priorities = Process

Riscani and Cahul Rayons • Harmonization of LPA1 Strategic Plans with rayonal SEDSs• Amendment & finalization of draft FSs WSS

Leova Rayon• Elaborate SEDS on WSS & elaborate FS

Floresti and Soldanesti Rayons• Update rayonal SEDS on SWM

Soroca, Nisporeni and Orhei Rayons• Update SEDS EE of public buildings

Page 22: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 24

> 2. Inter-municipal Cooperation

Rayonal SEDSs + FSs ~ orientation to find IMC arrangements

Soldanesti, (Rezina) and Floresti Rayons• Further support to institutionalisation of SWM IMC services

Cahul Rayon• Further support to institutionalisation of WSS IMC services

Riscani Rayon• Further support to institutionalisation of WSS IMC services

Soroca Rayon• Identifying cooperation partners for Tatarauca-Veche commune

Page 23: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 25

> 3. Investments planned

Riscani Rayon (Prut Cluster)> Costesti – Vehicles & WWT plant & Sewerage system extension> Duruitorea Veche – Sewerage system constructionCahul Rayon> Rosu – Extension of sewerage system> Cahul – Rehabilitation of drinking water purification plantOrhei Rayon> Orhei – EE improvement of regional hospital, maternity ward Nisporeni Rayon> Nisporeni – EE improvement of reg. hospital, surgery departmentLeova Rayon > SEDS & FStudy WS sector (investment funds secured)Soldanesti / Floresti Rayon > Preparation of tender docs for SWM center> Recycling yard Floresti (design docs ready – funding unclear)

Page 24: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 26

GIS investment implementation overview

GIZ HQs

Working group MRDC, GIZ, LPA Approval

Ready for Procurement

MLPS IA2Project Preparation

RDAMLPS

IA1Tender doc BoQ

Preparation

MLPS IA1 Project Implementation

• Publication

• Evaluation

• Awarding

• Contracting

• Supervision

• Hand-over

Check

Page 25: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 27

GIS investment implementation =

1

Construction Process

2 3 4 5 O HO

A

RDA Working group MRDC, GIZ, LPA

RDA Site Supervisor

Tra

inin

g

Mon

itorin

g R

epor

t 1

Mon

itorin

g R

epor

ts

2, 3

, 4,

Acc

ep-

tanc

e of

w

ork

Han

d-ov

er t

o LP

A

Ope

ratio

n

Tra

inin

g by

su

pplie

r

MLPS GOPA1 expert accompaniment

RDA

MLPS CD measures

Support by Local Project Manager ?

Page 26: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 28

EEF Support Concept

EEF

> Monitoring

RDA MLPS

SwedenSTEE Pool

LPAProject

Handover!?

Training

Templates

Rayon energy manager

Site supervisor

Grant GIZGrant

Energy expert

Advice

Page 27: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 29

> 4. Capacity Development of LPAs & and Service Providers > improved capacities to manage & maintain improvements

> e.g. re planning, organizing, implementing, service delivery, fee collection, customer relations, tariffs, monitoring and evaluation …

• Implementation of Capacity Development Action Plan for service providers • In WSS implemented with other development partners under AMAC • In EE implemented with EEA & EEF > facilitate implementation of EEF

projects

• Scaling-up via participation of national sector entities

• Gender mainstreaming integral part

Page 28: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 30

> 5. Community mobilization & citizens’ engagement

> Improvement of local public services is client related activity> Citizens = clients / customers + right for quality & cost-effective services> Customer relation & gender balanced citizen involvement> Implementation of specific activity bundles on community mobilization,

planning and citizen engagement

SWM Soldanesti, Rezina and Floresti Rayons • Improving SWM local public services • Community mobilisation continued

WSS Riscani and Cahul Rayons• Improving WSS services

EE Tatarauca Veche• Awareness campaign re citizens’ payments continued

Page 29: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 31

MLPS IA1 Cross Cutting Areas

IMC experiences • …communicated by regional events & national conference co-

organized with partners e.g. (…UNDP, USAID, SDC etc.) under ownership of the State Chancellery, MRDC, MoEnv, RDAs and CALM

Public Procurement • Provide TA & back-stopping at all public procurement processes

Project implementation• Support attraction of co-financing• Capacitate local project managers

Public Infrastructure Registration • Support system development in support of projects

Page 30: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 32

Intervention Area 2 – Regional Planning and ProgrammingProgress July – December 2013 < & > Outlook 2014

Modernization of Local Public Services (MLPS) in the Republic of Moldova

Chişinău, 21 Feb 2014

Page 31: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 33

Context - Major Developments

Scenario B involving extensive EU assistance signed GIZ-EU in November 2013

Scenario B addendum to GOPA 2 contract agreed late January 2014

Major new activities and related outputs and results:

Workstreams Regional Planning

Project Development (1) (fiche)

Project Development towards ready to go (2)

Sector      

Water/sanitation

BMZ- Sweden

BMZ-Sweden EU-PRDP

Solid Waste management

BMZ-Sweden

BMZ-Sweden EU-PRDP

Energy Efficiency of Public Buildings

BMZ-Sweden

BMZ-Sweden EU-PRDP

Local/ Regional Roads EU-PRDP EU-PRDP EU-PRDP

Business Development and Promotion

EU-PRDP EU-PRDP EU-PRDP

Page 32: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 34

Major Areas of Progress

Workstreams Regional Planning Project Development (1) (fiche)

Project Development towards ready to go (2)

Sector      

Water/sanitation

BMZ- Sweden

BMZ-Sweden

EU-PRDP

Solid Waste management

BMZ-Sweden

BMZ-Sweden EU-PRDP

Energy Efficiency of Public Buildings

BMZ- Sweden

BMZ-Sweden EU-PRDP

Local/ Regional Roads

EU-PRDP EU-PRDP EU-PRDP

Business Development and Promotion

EU-PRDP EU-PRDP EU-PRDP

Page 33: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 35

Regional Sector Planning/Project Development

Water/sanitation

3 RSProgrammes in draft sent to MRDC (Feb-14)

Process of Possible Project Concept Identification starting

Solid Waste management

2 RSProgrammes completed with RDC approval (Feb-14)

33 Possible Project Concepts agreed as basis for project development – Project Development work starting

Energy Efficiency of Public Buildings

3 RSProgrammes completed with RDC approval (Feb-14)

5 Possible Project Concepts agreed as basis for project development – Project Development work starting on 3 SWM PPCs/SWM zones

Regional and Local Roads

Planning starting

Business Development and Promotion

Activities starting

Workstreams Regional Planning Project Development

Page 34: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 36

Regional Planning and Programming and Follow on Project Development

Key Indicator for Our Work

• 8 (11) regional sector plans

• At least 90 investment project fiches for investment projects in public assets with a total worth of up to 170 million Euro in the areas water and sanitation, solid waste management and energy efficiency of public buildings are prepared based on integrated and participatory local planning exercises and in line with sector priorities and norms. (baseline 2011: 0; source: number of project fiches developed)

Page 35: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 37

All project concepts related to Regional Sector Programmes are:

• Consistent with regional (sector programmes) and identified as part of process by stakeholder

• Consistent with general national policy directions

• Locked into a process and method of project development that will ensure ownership and sustainability

• Accompanied by an attempt to encourage key actors to undertake “accompanying measures” to ensure smooth implementation, sustainability of results and of relates services

Relation to Key Indicator

Page 36: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 38

Project Development - Projects and Possible Project Concepts

 Sector Regional Plans/Programs Elaborated

Project Fiches Elaborated (PPCs)

Indicative Value of All Live Project Fiche in Sector (M€)

Energy Efficiency 3 33 + 66 in pre-fiche format (+ 2 ready to go + 9 “parked” awaiting financing)

33: 32.7466: 51.902: funded:2.2399: “parked – to be funded”: 11.46

Solid Waste Management

2 5 (+1) in ppc format 70.9

Water & Sanitation 3 (draft) 33 (est.) 70 33 (est.)

Current base-line (31/12/13) accepted for Phase B work: 103.64 M€ (i.e. Approved Possible Project Concepts - 32.74 M€ (EE) +70.9 M€ (SWM), all anchored in regional sector plans.

Page 37: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 39

Issue of Financing for Projects and Project Preparation

   Documentation Number

(Towards RTG)M€ (indicative)

Energy Efficiency

Will include documentation equivalent to feasibility studies according to standards already approved by GIZ Construction Department

12 RTG (equivalent)

11.8

Solid Waste Management

Pre-feasibility stage is covered by Regional Plans. Elaboration stage includes Feasibility Study, EIA, Conceptual Design

3 (+3) 26.1

Water & Sanitation

Pre-feasibility stage is covered by Regional Plans. Elaboration stage includes Feasibility Study, Environmental Management Plan Conceptual Design

12 25

Regional and Local Roads

Pre-feasibility stage is covered by Regional Plans. Elaboration stage includes Feasibility Study, Environmental Management Plan Conceptual Design

12 x 15 km (180km)

40

    102.9

Page 38: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 40Type presentation title here

The LogicRegional

Planning (1)

Project Identification

(2)

Project Development

(3A)

Targeted Sector

Reform (3B)

Financing (4)

Sustainable projects and services driving durable change

Page 39: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 41

• In EE, already more projects than available investment financing (shortfall = approx 9 MEUR). By early 2015, the shortfall will be greater (est. 9+5) and by end 2015 in the order of at least 25 MEUR if financing is not found

• In SWM, shortfall of resources likely in Q2-2015 to complete full technical design and tender book of major infrastructure in 3 SWM zones and to accelerate work on 3 other zones.

• However feasibility studies/EIA and conceptual technical design will be complete for 3 zones with prospect of implementation by start 2016 (for investments near 30MEUR)

• In WSS, shortfall of resources likely in Q2-2015 to complete full technical design and tender book of major WSS infrastructure in 12 rayonal centres and to expand to others.

• Feasibility studies/Environmental Management Plans and conceptual technical design will be complete for 12 projects with prospect of implementation by start 2016 (for investments near 25MEUR)

• Roads – to be determined but likely as WSS

Financing Issues

Page 40: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 42

More resources will be needed:

• (i) to finance the implementation of a (conservatively) estimated 100MEUR of ready or near ready to go projects by end 2015/start 2016

• (ii) to support finalisation of project preparation in certain “heavy” areas e.g. SWM, WSS

• As MRDC, RDAs, LMs work to develop programmes, projects and reform respects sectors (eg SNIP/GOST etc), IFIs and donors need to anticipate and plan for a major shift if real financial demand

Conclusions

Page 41: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 43

Capacity building with a view to implementing ENPI programs and applying for ENI programs

• Organization of eight public consultations to identify priorities for the following cross-border cooperation programs.

Page 42: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 44

Capacity building with a view to implementing ENPI programs and applying for ENI programs

• Organization of three working group meetings on cross border cooperation programs for 2014-2020.

• Organization of trainings on the implementation of transnational cooperation projects funded under the Transnational Co-operation Program “South-East Europe” for the period 2007-2013.

• Provision of individual consultations regarding the implementation of cross-border cooperation projects.

Page 43: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 45

Implementation of regional development policies by capacity building of LPAs, RDAs and RDCs

• 8 trainees from the Public Administration Academy have the opportunity to strengthen their practical skills in the field of regional planning and programming by participating in sector workshops and study visits to pilot projects.

• Piloting of the “Regional Development” training program (40 hours).

• 17 trainers in the field of regional development

• Curriculum document

• Participant's Guide.

• Facilitator's Guide

Page 44: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 46

Further activities

• Organization of working group meetings on cross border cooperation programs for the period 2014-2020.

• Organization of workshops on implementing projects financed under the European Neighbourhood and Partnership Instrument (ENPI).

• Supporting trainees from the Public Administration Academy upon master's thesis completion.

• Implementation of continuous training programs on “Local and Regional Planning and Programming” and “Regional Development”.

Page 45: MLPS Presentation for the Steering Committee Session from February 21, 2014

Pagina 47

Thank you for attention.