Pagina 1
Steering Committee Session
February 21, 2014
Modernization of Local Public Services in the Republic of
Moldova
Pagina 2
• Based on bilateral Government negotiations Moldova-Germany Nov 2009
• Duration 6 years: 1/2010 – 12/2015
• Main Institutional Counterpart: Ministry of Regional Development and Constructions and the Regional Development Agencies
• German contribution: 17.9 Mio. €• Technical assistance – 10.6 Mio. €• German Investment Support – 7.3 Mio. €
• Co-Financing by Romanian Government of 0.7 Mio. €• Co-Financing by Swedish Government of 5.5 Mio. €• Co-Financing by European Union 5.0 Mio. €
Modernization of Local Public Servicesin the Republic of Moldova
Pagina 3
• Overall: 17.9 Mio €
• Technical assistance – 10.6 Mio €• 2010 – 2013: 5.1 Mio €• 2014: 2.0 Mio €• Pilot Project Investments: 3.6 Mio €
• German Investment Support – 7.3 Mio €• Investments• 12 RDA staff (4 North / 5 Center / 3 South)
German contribution 17.9 Mio. €
Pagina 4
Pilot project - capital investment and procurement of equipment
Improving water and sewerage supply in Rosu village, Cahul rayon
Co-Financing by Romanian Government of 0.7 Mio. €
Pagina 5
3.3 Mio. € (2012-2014) • Regional Operational Plans on WSS, SWM & EE of public buildings (by
RDAs North, Centre and South).
• Regional indicators on a. m. areas established & data bases developed.
• Models of transparent and participatory design processes for preparing Regional Operational Plans, based on sector focus groups with participation of key stakeholders of the respective sectors, civil society and private sector as well as external specialists drafted.
• Formal mechanisms and procedures for coordination and collaboration with responsible sector ministries (Environment and Economy established.
Co-Financing by Swedish Government of 5.5 Mio. €
Pagina 6
Co-Financing by Swedish Government of 5.5 Mio. €
2.2 Mio. € (2014)• Support to regional development institutions and local public
authorities. > Implementation of investment projects to improve local public service delivery.
Benchmarks:• Investment projects prepared for Regional Development to
ready-for-procurement stage (volume 6 million EUR). • Project implementation management by RDAs without
major shortcomings (related investment funding provided by Germany).
• Improved management of projects by LPAs, supported by certified energy auditors, financed by the National Fund for Energy Efficiency.
Pagina 7
Co-Financing by European Union 5.0 Mio. €
Overall objec-tive
Support Moldova in advancing its economic, social and territorial cohesion with focus on development of policy, legal, institutional and developmental framework for an effective development policy for Moldova’s regions.
Purpose • Facilitate a regional planning process leading to the development of a project pipeline relevant to specified areas & concerns of MD’s RD & EU Cohesion Policy.
• Develop capacities essential to sustaining the above objectives and support the wider regional development process.
Expec-ted results
• Detailed regional plans covering five thematic fields essential to the development of Moldova’s regions (WSS, SWM, local roads of key importance & from these updated regional operational plans for each region (N, S, C).
• Updated regional operational plans for each region where RD institutions are in place.
• Validated capacity among responsible bodies relevant to the above results, including capacity to continuously manage a project pipeline.
• Pipeline of ready to go, ready to finance and ready to procure projects.
Pagina 8
Intervention Area 1 – Local Public ServicesProgress July – December 2013 < & > Outlook 2014
Modernization of Local Public Services (MLPS) in the Republic of Moldova
Chişinău, 21 Feb 2014
Pagina 910/04/2023
Basic Assumption
Planned and implemented activities lead to achieving progress regarding IA1 Objective
Local Public Authorities effectively cooperate
and manage improvements of local public services in the
selected communities in pilot rayons
Pagina 10
Efficient Local Public
Services
Support Model
Comprehensive Approach
… for enhancedsustainability
Pagina 1110/04/2023
IA1 Result Model > LPAs‘ development strategically integrated> Affordability
> LPAs cooperate> Affordability
> Sustainable services> Affordability & quality> Professional public procurement
> Sustainable, effective service delivery & management> Affordability> Best practices disseminated
> Best practices communicated> Utilisation of new services
Pagina 14
Improvement of WSS services in Riscani rayon
Improvement of WSS services in Cahul rayon
Improvement of WSS services in Iargara, Leova rayon
Energy Efficiency of Public Buildings in Orhei Rayon, Orhei Regional
Hospital
Energy Efficient Street Lighting in Soroca Rayon
Improvement of Solid Waste Management Services in Soldanesti,
Rezina & Floresti Rayons
Energy Efficiency of Public Buildings in Nisporeni Rayon, Nisporeni
Regional Hospital
Background Map Source: MRDC
Pagina 15
< 1. Local Strategic Planning & Programming
SWM• Agreed on clean-up program of 4 temporary dumpsites• Agreed on collection start-up support (routing)• Parcanci landfill-site confirmed• FS being finalised• SEDS SWM process ongoing
WSS• FS Cahul & Riscani Rayon being finalised (amended focus)• Leova Rayon declared MLPS project rayon, activities started, MoU
pending, SEDS & FS to finalise prior to detailed investment planning
EE• SEDS EE update for Orhei & Soroca Rayon started
Pagina 16
< 2. Inter-municipal Cooperation
SWM• LPAs agreed on selection of 4 temporary landfill-sites for clean-up• 67 LPAs agreed on IMC-institutionalisation• 35 LPAs received assistance for service provision• 20 LPAs adopted joining JSC & local tax, process ongoing WSS• Cahul Rayon: Institutionalisation of IMC WSS services, process ongoing, 3
primarias adopted decision on joining• Riscani Rayon: 2 study visits (> RO & PL) on IMC based services
completed• Riscani Rayon: Discussion on IMC initiated & ongoing (> 10 LPAs)EE• Tatarauca Veche, Soroca: discussion on extension of IMC based service
provision initiated (> 6 LPAs)Cross-cutting• Discussion > State Chancellery, CALM & others on legal aspects of IMC
institutionalisation & service cost recovery, value assessment etc. ongoing
Pagina 17
< 3. Capital investments & acquisition of equipmentSWM• All equipment procured & transferred• Technical design for recycling yard Floresti completedWSS• 75% of Rosu households connected to water supply• Tender doc preparation for 6 subprojects ongoingEE Orhei: • 5 sub-projects completed & transferred • Smart energy efficiency monitoring system• Installation of 3 heating substations• Entrance reconstruction ongoingEE Nisporeni• Tender docs under preparationEE Tatarauca Veche • Completed, operational, transferred & awarded Eco-Energetica AwardCross-cutting• RDA capacitated & assisted in public procurement & reporting
Pls see hand-out
for financial overview
Pagina 18
< 4. Capacity Development of LPAs & Service Providers
SWM• Capacity development action plan developed• Discussion on service fee collection ongoing (local tax?)
WSS• Capacity development action plan developed• Riscani Rayon: 2 study visits (> RO & PL) completed
EE Orhei hospital• Energy manager in place• Energy management team in place• Training for Energy management team delivered
Cross-cutting• Process to register public infrastructure started
Pagina 19
< 5. Community mobilization & citizens’ engagement
SWM• Community mobilisation ongoing• NGO contracted to support awareness campaign for SWM-system start
WSS• NGO to support community mobilisation for entire Cahul rayon selected• Rosu: 75% of connected pay regularly for drinking water• Duruitoarea Veche: 90% pay regularly for drinking water
EE Orhei hospital• Beneficiary aware about system management and monitoring• Up-scaling of experiences postponed
EE Tatarauca Veche• Awareness campaign re citizens’ payments ongoing (65% paying)
Pagina 20
Concerns to address
• Investments & -volumes alone do not guarantee RD;• Local project managers in support of RDA implementation?• Capacity of RDAs incl. consideration of pentagon elements?• Land-use planning > update general plans!• Technical standards!• Statistical system!• Involvement of sector ministries!• Viable & lean IMC forms! • … ?
Issues for D
iscussion
Pagina 21
Issues for D
iscussion
MLPS IA2 Project Pipeline
Projections for project development volumes ready by end of 2015
Urgent
requirements for
Implementation:
>>> Capacitated implementers > ? + ? + outreach to local level ?
>>> Securing measures ?
>>> Funding ?
Sector ~ No. of Projects ~ Mio. € (totals)EE (Jan 2014)EE (end 2015)
913-15
912
SWM 3 30
WSS 10 28
Roads 10 30
Total 47 109
Pagina 22
Efficient Local Public
Services
Support Model
Comprehensive Approach
… for enhancedsustainability
Pagina 23
> 1. Local Strategic Planning and Programming
Integrated / compiled at level of rayons / according to LPAs’ needs & regional / national sectorial priorities = Process
Riscani and Cahul Rayons • Harmonization of LPA1 Strategic Plans with rayonal SEDSs• Amendment & finalization of draft FSs WSS
Leova Rayon• Elaborate SEDS on WSS & elaborate FS
Floresti and Soldanesti Rayons• Update rayonal SEDS on SWM
Soroca, Nisporeni and Orhei Rayons• Update SEDS EE of public buildings
Pagina 24
> 2. Inter-municipal Cooperation
Rayonal SEDSs + FSs ~ orientation to find IMC arrangements
Soldanesti, (Rezina) and Floresti Rayons• Further support to institutionalisation of SWM IMC services
Cahul Rayon• Further support to institutionalisation of WSS IMC services
Riscani Rayon• Further support to institutionalisation of WSS IMC services
Soroca Rayon• Identifying cooperation partners for Tatarauca-Veche commune
Pagina 25
> 3. Investments planned
Riscani Rayon (Prut Cluster)> Costesti – Vehicles & WWT plant & Sewerage system extension> Duruitorea Veche – Sewerage system constructionCahul Rayon> Rosu – Extension of sewerage system> Cahul – Rehabilitation of drinking water purification plantOrhei Rayon> Orhei – EE improvement of regional hospital, maternity ward Nisporeni Rayon> Nisporeni – EE improvement of reg. hospital, surgery departmentLeova Rayon > SEDS & FStudy WS sector (investment funds secured)Soldanesti / Floresti Rayon > Preparation of tender docs for SWM center> Recycling yard Floresti (design docs ready – funding unclear)
Pagina 26
GIS investment implementation overview
GIZ HQs
Working group MRDC, GIZ, LPA Approval
Ready for Procurement
MLPS IA2Project Preparation
RDAMLPS
IA1Tender doc BoQ
Preparation
MLPS IA1 Project Implementation
• Publication
• Evaluation
• Awarding
• Contracting
• Supervision
• Hand-over
Check
Pagina 27
GIS investment implementation =
1
Construction Process
2 3 4 5 O HO
A
RDA Working group MRDC, GIZ, LPA
RDA Site Supervisor
Tra
inin
g
Mon
itorin
g R
epor
t 1
Mon
itorin
g R
epor
ts
2, 3
, 4,
…
Acc
ep-
tanc
e of
w
ork
Han
d-ov
er t
o LP
A
Ope
ratio
n
Tra
inin
g by
su
pplie
r
MLPS GOPA1 expert accompaniment
RDA
MLPS CD measures
Support by Local Project Manager ?
Pagina 28
EEF Support Concept
EEF
> Monitoring
RDA MLPS
SwedenSTEE Pool
LPAProject
Handover!?
Training
Templates
Rayon energy manager
Site supervisor
Grant GIZGrant
Energy expert
Advice
Pagina 29
> 4. Capacity Development of LPAs & and Service Providers > improved capacities to manage & maintain improvements
> e.g. re planning, organizing, implementing, service delivery, fee collection, customer relations, tariffs, monitoring and evaluation …
• Implementation of Capacity Development Action Plan for service providers • In WSS implemented with other development partners under AMAC • In EE implemented with EEA & EEF > facilitate implementation of EEF
projects
• Scaling-up via participation of national sector entities
• Gender mainstreaming integral part
Pagina 30
> 5. Community mobilization & citizens’ engagement
> Improvement of local public services is client related activity> Citizens = clients / customers + right for quality & cost-effective services> Customer relation & gender balanced citizen involvement> Implementation of specific activity bundles on community mobilization,
planning and citizen engagement
SWM Soldanesti, Rezina and Floresti Rayons • Improving SWM local public services • Community mobilisation continued
WSS Riscani and Cahul Rayons• Improving WSS services
EE Tatarauca Veche• Awareness campaign re citizens’ payments continued
Pagina 31
MLPS IA1 Cross Cutting Areas
IMC experiences • …communicated by regional events & national conference co-
organized with partners e.g. (…UNDP, USAID, SDC etc.) under ownership of the State Chancellery, MRDC, MoEnv, RDAs and CALM
Public Procurement • Provide TA & back-stopping at all public procurement processes
Project implementation• Support attraction of co-financing• Capacitate local project managers
Public Infrastructure Registration • Support system development in support of projects
Pagina 32
Intervention Area 2 – Regional Planning and ProgrammingProgress July – December 2013 < & > Outlook 2014
Modernization of Local Public Services (MLPS) in the Republic of Moldova
Chişinău, 21 Feb 2014
Pagina 33
Context - Major Developments
Scenario B involving extensive EU assistance signed GIZ-EU in November 2013
Scenario B addendum to GOPA 2 contract agreed late January 2014
Major new activities and related outputs and results:
Workstreams Regional Planning
Project Development (1) (fiche)
Project Development towards ready to go (2)
Sector
Water/sanitation
BMZ- Sweden
BMZ-Sweden EU-PRDP
Solid Waste management
BMZ-Sweden
BMZ-Sweden EU-PRDP
Energy Efficiency of Public Buildings
BMZ-Sweden
BMZ-Sweden EU-PRDP
Local/ Regional Roads EU-PRDP EU-PRDP EU-PRDP
Business Development and Promotion
EU-PRDP EU-PRDP EU-PRDP
Pagina 34
Major Areas of Progress
Workstreams Regional Planning Project Development (1) (fiche)
Project Development towards ready to go (2)
Sector
Water/sanitation
BMZ- Sweden
BMZ-Sweden
EU-PRDP
Solid Waste management
BMZ-Sweden
BMZ-Sweden EU-PRDP
Energy Efficiency of Public Buildings
BMZ- Sweden
BMZ-Sweden EU-PRDP
Local/ Regional Roads
EU-PRDP EU-PRDP EU-PRDP
Business Development and Promotion
EU-PRDP EU-PRDP EU-PRDP
Pagina 35
Regional Sector Planning/Project Development
Water/sanitation
3 RSProgrammes in draft sent to MRDC (Feb-14)
Process of Possible Project Concept Identification starting
Solid Waste management
2 RSProgrammes completed with RDC approval (Feb-14)
33 Possible Project Concepts agreed as basis for project development – Project Development work starting
Energy Efficiency of Public Buildings
3 RSProgrammes completed with RDC approval (Feb-14)
5 Possible Project Concepts agreed as basis for project development – Project Development work starting on 3 SWM PPCs/SWM zones
Regional and Local Roads
Planning starting
Business Development and Promotion
Activities starting
Workstreams Regional Planning Project Development
Pagina 36
Regional Planning and Programming and Follow on Project Development
Key Indicator for Our Work
• 8 (11) regional sector plans
• At least 90 investment project fiches for investment projects in public assets with a total worth of up to 170 million Euro in the areas water and sanitation, solid waste management and energy efficiency of public buildings are prepared based on integrated and participatory local planning exercises and in line with sector priorities and norms. (baseline 2011: 0; source: number of project fiches developed)
Pagina 37
All project concepts related to Regional Sector Programmes are:
• Consistent with regional (sector programmes) and identified as part of process by stakeholder
• Consistent with general national policy directions
• Locked into a process and method of project development that will ensure ownership and sustainability
• Accompanied by an attempt to encourage key actors to undertake “accompanying measures” to ensure smooth implementation, sustainability of results and of relates services
Relation to Key Indicator
Pagina 38
Project Development - Projects and Possible Project Concepts
Sector Regional Plans/Programs Elaborated
Project Fiches Elaborated (PPCs)
Indicative Value of All Live Project Fiche in Sector (M€)
Energy Efficiency 3 33 + 66 in pre-fiche format (+ 2 ready to go + 9 “parked” awaiting financing)
33: 32.7466: 51.902: funded:2.2399: “parked – to be funded”: 11.46
Solid Waste Management
2 5 (+1) in ppc format 70.9
Water & Sanitation 3 (draft) 33 (est.) 70 33 (est.)
Current base-line (31/12/13) accepted for Phase B work: 103.64 M€ (i.e. Approved Possible Project Concepts - 32.74 M€ (EE) +70.9 M€ (SWM), all anchored in regional sector plans.
Pagina 39
Issue of Financing for Projects and Project Preparation
Documentation Number
(Towards RTG)M€ (indicative)
Energy Efficiency
Will include documentation equivalent to feasibility studies according to standards already approved by GIZ Construction Department
12 RTG (equivalent)
11.8
Solid Waste Management
Pre-feasibility stage is covered by Regional Plans. Elaboration stage includes Feasibility Study, EIA, Conceptual Design
3 (+3) 26.1
Water & Sanitation
Pre-feasibility stage is covered by Regional Plans. Elaboration stage includes Feasibility Study, Environmental Management Plan Conceptual Design
12 25
Regional and Local Roads
Pre-feasibility stage is covered by Regional Plans. Elaboration stage includes Feasibility Study, Environmental Management Plan Conceptual Design
12 x 15 km (180km)
40
102.9
Pagina 40Type presentation title here
The LogicRegional
Planning (1)
Project Identification
(2)
Project Development
(3A)
Targeted Sector
Reform (3B)
Financing (4)
Sustainable projects and services driving durable change
Pagina 41
• In EE, already more projects than available investment financing (shortfall = approx 9 MEUR). By early 2015, the shortfall will be greater (est. 9+5) and by end 2015 in the order of at least 25 MEUR if financing is not found
• In SWM, shortfall of resources likely in Q2-2015 to complete full technical design and tender book of major infrastructure in 3 SWM zones and to accelerate work on 3 other zones.
• However feasibility studies/EIA and conceptual technical design will be complete for 3 zones with prospect of implementation by start 2016 (for investments near 30MEUR)
• In WSS, shortfall of resources likely in Q2-2015 to complete full technical design and tender book of major WSS infrastructure in 12 rayonal centres and to expand to others.
• Feasibility studies/Environmental Management Plans and conceptual technical design will be complete for 12 projects with prospect of implementation by start 2016 (for investments near 25MEUR)
• Roads – to be determined but likely as WSS
Financing Issues
Pagina 42
More resources will be needed:
• (i) to finance the implementation of a (conservatively) estimated 100MEUR of ready or near ready to go projects by end 2015/start 2016
• (ii) to support finalisation of project preparation in certain “heavy” areas e.g. SWM, WSS
• As MRDC, RDAs, LMs work to develop programmes, projects and reform respects sectors (eg SNIP/GOST etc), IFIs and donors need to anticipate and plan for a major shift if real financial demand
Conclusions
Pagina 43
Capacity building with a view to implementing ENPI programs and applying for ENI programs
• Organization of eight public consultations to identify priorities for the following cross-border cooperation programs.
Pagina 44
Capacity building with a view to implementing ENPI programs and applying for ENI programs
• Organization of three working group meetings on cross border cooperation programs for 2014-2020.
• Organization of trainings on the implementation of transnational cooperation projects funded under the Transnational Co-operation Program “South-East Europe” for the period 2007-2013.
• Provision of individual consultations regarding the implementation of cross-border cooperation projects.
Pagina 45
Implementation of regional development policies by capacity building of LPAs, RDAs and RDCs
• 8 trainees from the Public Administration Academy have the opportunity to strengthen their practical skills in the field of regional planning and programming by participating in sector workshops and study visits to pilot projects.
• Piloting of the “Regional Development” training program (40 hours).
• 17 trainers in the field of regional development
• Curriculum document
• Participant's Guide.
• Facilitator's Guide
Pagina 46
Further activities
• Organization of working group meetings on cross border cooperation programs for the period 2014-2020.
• Organization of workshops on implementing projects financed under the European Neighbourhood and Partnership Instrument (ENPI).
• Supporting trainees from the Public Administration Academy upon master's thesis completion.
• Implementation of continuous training programs on “Local and Regional Planning and Programming” and “Regional Development”.
Pagina 47
Thank you for attention.
German Development Cooperation through GIZChișinău, 31a Bulgară str.,T + 373 22 22-83-19F + 373 22 00-02-38
Internet: www.giz.de, www.serviciilocale.md