Project Fact Sheet Project Name: Refurbishment of the Fluoroscopy Room and Patient Recovery Room

OT0039 - Barium Room

Location: X-Ray Imaging Department

Stage: Delivered

Client representative: Keith Marfleet / Imaging Services Lead

Andrew Delaney / Deputy Imaging Service Lead

Senior Project Manager (Capital): Alessandro Annunziata

Head of Capital Projects: John Brierley

Director of Estates: Phil Eagles

Project Update:

• Project completed in January 2016

• In Defects until January 2017

Project Brief:

In 2015 Milton Keynes University Hospital NHS Foundation Trust stated its intentions that the

provision of a clinical room ready for a future conversion to Fluoroscopy Room and Patient

Recovery Room was needed.

The benefits to Patients arising from the scheme proposals are:

• Provide an alternative area to undertake non fluoroscopic interventions e.g. Ultrasound

scans and ultrasound guided biopsies.

• Allow better use of the interventional room through receiving/recovering/monitoring

patients outside of the room. Datix’s are on the system indicating room blockage due to

waiting for hand over or bad availability.

• Provide a dedicated area for the recovery of patients within Imaging.

Construction works to create adequate clinical areas for effective delivery of services include

as follows:

• Alteration of partition walls to

reconfigure the layout of the area.

• Mechanical ventilation with hygienic

air grilles

• Hot and cold water services for

clinical sink and stainless steel scrub

up trough

• New fire smoke detectors

• New antiglare dimmable lights

panels in LED

• New heating and cooling at X-Ray

department with Daikin VRV IV Heat

Pump with Variable Refrigerant

Temperature (VRT)

• Presence Detectors (PIR sensors)

designed to switch off lights if an

area is unoccupied

• New wireless nurse call system

• New hygienic Glass Reinforced

Polyester (GRP) doors

Construction Project Team:

Project Manager: Alessandro Annunziata Lead Designer Alessandro Annunziata

Main Contractor Parias Commercial Interiors Ltd

Project Facts & Figures:

Budget: £130,000.00 Funding Source: Capital

Tendering: single stage with priced schedule of works

Contract: JCT Minor works