MKE 4 kick waveform scanTI 8 MD 6/6/09
Jan UythovenThanks to Mike B, Stephane and
Jerome
Calibration of BTV beam position vs. kicker voltage, all TI 8 screens
• Two best screens: BTV813 and BTV876
Raw data: BTV pos – timing delayfor BTV813
Apply Calibration, Swap Curve by 180 degrees
BTV813
BTV876
Mean and error bars (spread =)for both screens
Results of both screens agree rather well: Zoom on previous slide
Conclusions
• BTVs provide very precise measurement of kick waveform
• The kick used for LHC beams is just within the spec of 1 % ripple
• For LHC operation the MKE4 kick should be made longer, similar to CNGS, and the last part of the kick to be used after further measurements– Reduce ripple seen by the beam– Less stress on the clipper switch