MITSUBISHI LATEST LNG CARRIERS -...

13
© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved. MITSUBISHI LATEST LNG CARRIERS Mitsubishi Shipbuilding Co., LTD November 27, 2018

Transcript of MITSUBISHI LATEST LNG CARRIERS -...

Page 1: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

Mitsubishi Shipbuilding Co., LTD

© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

MITSUBISHI LATEST LNG CARRIERS

Mitsubishi Shipbuilding Co., LTD

November 27, 2018

Page 2: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

2© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

After 1983 59 LNGCs

80 85 90 95 2000BANSHU MARU

ECHIGO MARU

NW SANDERLING

GOLAR MAZO

DEWA MARU

DWIPUTRA

NW STORMPETREL

NW SWIFT

LNG VESTA

DOHA

NW SEAEAGLE

AL WAJBAH

ISH

EKAPUTRA

AL KHOR

AL JASRA

LNG JAMAL

SOHAR LNG

ABADI

PUTERI INTAN SATU

GALEA

GALLINA

PUTERI NILAM SATU

PACIFIC NOTUS

PUTERI FIRUS SATU

GEMMATA

05 10

SERI BALHAF

SERI BALQIS

PACIFIC ENLIGHTEN

CYGNUS PASSAGE

M M

M

M

M

M

M

M

M

M

M

M

M

M

M

NO96

M

M

NO96

M

M

M

M

M

M

M

M

NO96

M

M

M

M

M

NO96

NO96

NO96

NO96

NO96MM

TAITAR No.3

TAITAR No.1M

M

ARCTIC PRINCESS

ARCTIC LADY

PASIFIC EURUS

IBRI LNG

SERI BAKTI

ALTO ACRUX

SERI BEGAWAN

GRAND ANIVA

SERI BIJAKSANA

GRAND ELENA

MPACIFIC ARCADIA

MLNG VENUS

MLNG JUROJIN

MSEISHU MARU

MESSHU MARU

MLNG SATURN

15

M

M

M

M177km3

M177km3

M

MDFDE

DFDE

UST

UST

UST

UST

UST

UST

UST

UST

UST

STaGE

STaGE

M STaGE

STaGE

STaGE

M180km3

STaGE

M180km3

STaGE

M165km3

: Conventional MOSS(35 Vessels)

M

: Membrane(8 Vessels)

NO96

: SAYAENDO MOSS (UST*)(8 Vessels)

M

: New gene. MOSS(RINGO-STaGE**)

(8 Vessels)

M

STaGE

**: Steam Turbine and Gas Enginehybrid propulsion plant

LNGC Building Record

LNG MARS

PACIFIC MIMOSA

OCEANIC BREEZE

DIAMOND GAS ORCHID

DIAMOND GAS ROSE

*: Ultra Steam Turbine (reheat turbine) plant

LNG JUNO

Page 3: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

3© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

History of LNGC Construction (MOSS type)1st generation

125,000m3, 5tanks2nd generation

127,000m3, 4tanks3rd generation

137,000m3, 5tanks4th generation

147,000m3, 4tanks

5th generation 155,000m3, 4tanks“SAYAENDO” & UST

6th generation 180,000m3, 4tanks

“Sayaringo” & STaGE

Continuous tank cover

Capacityexpansion

Page 4: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

4© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

Conventional LNGC

• Nickname “SAYAENDO”• Light structure with

continuous tank cover• Low FOC• Better maintainability

SAYAENDO Concept

Page 5: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

5© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

Better Terminal Compatibility• Tradable cargo tank capacity for worldwide terminals• Compact dimension on per with conventional 147km3 LNGC• 49m Breadth for New Panama Canal Transit

Improved Operating Economy• Increased cargo capacity (+8000m3 from 147km3)• FOC saving by UST, improved hull form and less wind resistance.• Low BOR (0.15 to less 0.10%/d selectable)• Flexibility of fuel selection (100% Gas, 100% Oil & Dual burning)

• Maintenance cost saving(less supporting structure of pipes)

Environmentally Friendly• Less CO2 emission by low FOC• 100% Gas burning & 100%MGO(0.1% sulfur oil)can be used• Low NOx Emission (Lower than Tier III level)

Cost Saving• Less Steel Weight

Key Technologies

Moss/Stretched tank

UST/Reheat turbine

Continuous tank cover

Design Concept of SAYAENDO

Page 6: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

6© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

Conventional tank cover → Not effective on strength

Continuous tank cover → Effective strength member

SAYAENDO can save the Steel Weight by providing continuous tank cover contribute largely to whole Hull Strength.

Structural HeightAbt.47m

Structural Height abt.27m

Larger Structural Deck Area

Small Structural Deck Area

Hull Weight Reduction by Continuous Tank Cover

Page 7: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

7© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

SAYAENDO Type

Wind load analysis by wind tunnel tests

Conventional Type

• Longitudinal Wind Force is decreased by abt.20-40% from conventional type.

It shall contribute to improve fuel consumption in actual voyage.3-4% improvement of fuel consumption is expected under Beaufort 5 wind scale condition.

• Lateral wind resistance is increased slightly.Influence on ships’ maneuverability and mooring at terminals have been confirmed.

Reduction of Longitudinal Wind Resistance

Page 8: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

8© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

Patent pendingNew MOSS type tank(Apple shaped tank)

180km3 class New Panamax MOSS type LNGC"SAYARINGO"

High efficient twinPropulsion plant

“RINGO (apple)”

180km3 capacity within New Panamax breadth 49m

"SAYARINGO" is nickname of New Panamax MOSS type LNG Carrier with continuous tank cover and apple shaped tanks. (“apples” in a “pod”)

1. Continuous tank cover

2. Apple shaped tank3. High efficient Plant

SAYARINGO Concept

Page 9: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

9© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

COG

Tank height

Apple shape TankApple shape Tank

Stretched MOSS tank Apple-shaped tank

円筒

Sphere

Cylinder

Sphere

Sphere

Torus

Torus

New MOSS type tank named Apple-shaped tank with minor geometrical modification from the MOSS tank is configured with combination of sphere, cylinder and torus part.

Extension of stretched cylindrical part Northern and Southern convex shape configured by sphere and torus in seriesLess total height and Lower center of gravity

Lower COG

Less height“SAYAENDO’s tank” “SAYARINGO’s tank”

Sphere

Sphere

Cylinder

Center Of Gravity

Apple-shaped Tank

Page 10: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

10© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

HV

RH BOILER

GAS HTR

MGO

BOG

LP TURB

HPTURB

R/G

RH

CARGO TK

IPTURB

R/G

FPP

FPP

PEM

AST.

Gen.

Gen.

2 STAGEL/D COMP.(2 sets)

L/D COMP.

GAS HTR

PCV

MGO

Gen.

6L50DF

6L50DF

6L50DF

Conv. Trans.

DFD generator

UST

Electricpropulsion

• STaGE is a hybrid propulsion system of UST and DFD Electric propulsion plant.• Plant efficiency is significantly improved by waste heat recovery of DFD.• Propulsion power is reduced by adoption of twin-screw system

Abt. 80% of waste heat from DFD is recovered.

STaGE Concept

Propulsion Electric Motor

Page 11: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

11© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

Construction of SAYARINGO STaGE

SAYARINGO

STaGE

USTElectric Propulsion UST HP Turbine

The first SAYARINGO STaGE has been delivered in Jun., 2018

Launch March 2017 Sea Trial February 2018

PEM

DFE & Generator UST

Main Boiler

Page 12: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina

12© 2018 MITSUBISHI SHIPBUILDING CO., LTD. All Rights Reserved.

10080

60

Over 40% reduction of CO2 emissions per cargo unit

(3) Wind resistance improvement: minus 3 to 4%

(2) Hull-form improvement: minus 20%(Enlarged lightweight twin-skeg hull)

(1) STaGE plant:minus 20%

(1) STaGE plant

147km3, Conventional steam turbine plant (4th Generation)

(2) Hull-form improvement(3) Wind resistance improvement

Improved by more than 20% compared with 155m3 SAYAENDO(5th Generation)

Reduction of CO2 Emissions by Energy SavingSAYARINGO (6th Generation)

Page 13: MITSUBISHI LATEST LNG CARRIERS - JOGMECtechno-forum.jogmec.go.jp/2018/detail/files/presentation/07_hiramat… · al jasra lng jamal sohar lng abadi puteri intan satu galea gallina