    MIT OpenCourseWarehttp://ocw.mit.edu

    1.040 Project Management

    Spring 2009

    For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.

    http://ocw.mit.edu/http://ocw.mit.edu/termshttp://ocw.mit.edu/termshttp://ocw.mit.edu/
  • 7/31/2019 MIT1_040s09_lec01

    2/21

    1.040/ 1.4011.040/ 1.401

    Pr oj ect Managem entPr oj ect Managem entSpring 2009Spring 2009

    Course IntroductionCourse Introduction

    Fred Moavenzadeh

    Depart ment of Civil and Environmental EngineeringDepart ment of Civil and Environmental Engineering

    Massachuset t s Inst it ut e of TechnologyMassachuset t s Inst it ut e of Technology

  • 7/31/2019 MIT1_040s09_lec01

    3/21

    OutlineOutline

    IntroductionIntroduction

    Course InformationCourse Information

    Lecture OutlineLecture Outline

    T.A.T.A.

    Students; Background, Interests, &Students; Background, Interests, &

    ExpectationsExpectations

  • 7/31/2019 MIT1_040s09_lec01

    4/21

    Project ManagementProject Management

    Focus of ClassFocus of ClassConstruction Projects;Construction Projects;

    Primarily Infrastructure ProjectsPrimarily Infrastructure Projects

  • 7/31/2019 MIT1_040s09_lec01

    5/21

    TopicsTopics

    The Course is divided in three parts:The Course is divided in three parts:

    Part 1: Project FinancePart 1: Project Finance

    Part 2: Project EvaluationPart 2: Project Evaluation

    Part 3: Project OrganizationPart 3: Project Organization

    There will be a few Guest LecturersThere will be a few Guest Lecturers

  • 7/31/2019 MIT1_040s09_lec01

    6/21

    Term Project (1.401)Term Project (1.401)

    Step 1: Preliminary Project ProposalsStep 1: Preliminary Project Proposals

    Step 2: Project DetailsStep 2: Project Details

    Step 3: DeliverablesStep 3: Deliverables

    ReportReport PresentationPresentation

  • 7/31/2019 MIT1_040s09_lec01

    7/21

    DESIGN CLOSEOUTDEVELOP-

    MENT DIVESTMENTOPERATIONS

    Construction PhasesConstruction Phases

    & Class Topics& Class Topics

    FEASIBILITYANALYSIS

    PROJECTMANAGEMENT

  • 7/31/2019 MIT1_040s09_lec01

    8/21

    Construction Phases

    Strategic Planning, or conceptualization The need for a project isidentified, so that specific Objectives are achieved Alternative

    projects (including the do-nothing option) are examined System DesignThe approach for addressing the organizations

    strategic concerns is established during systems design Therequirements are translated into specific technical specifications

    Detailed Design is the phase in which the optimal systems designis translated into a detailed technical implementation scheme

    Development refers to the implementation of the detailed design

    Operations and Lifecycle Support represents the period during

    which the project yields benefits to the organization DivestmentThe initial design again determines the potential for

    proper divestment in the context of the sociopolitical and naturalenvironment

  • 7/31/2019 MIT1_040s09_lec01

    9/21

    Feasibility Studies and PreliminariesFeasibility Studies and Preliminaries

    Understanding project finance and evaluationUnderstanding project finance and evaluation Helps understand economic challenges faced by ownerHelps understand economic challenges faced by owner

    and contractorand contractor

    Risk managementRisk management

    Deciding on fundamentals of contractDeciding on fundamentals of contract

    Delivery systems (organizational method)Delivery systems (organizational method) Contract type (how pay?)Contract type (how pay?)

    Award method (how decide who hired?)Award method (how decide who hired?)

  • 7/31/2019 MIT1_040s09_lec01

    10/21

    DESIGN CLOSEOUTDEVELOP-

    MENT DIVESTMENTOPERATIONSFEASIBILITY

    ANALYSIS

    PROJECTMANAGEMENT

    Construction PhasesConstruction Phases

  • 7/31/2019 MIT1_040s09_lec01

    11/21

    Design PhaseDesign Phase

    EstimationEstimation

    Successive estimates producedSuccessive estimates produced Planning & SchedulingPlanning & Scheduling

    WBSWBSWeb Based SchedulingWeb Based Scheduling

    Deterministic & probabilistic schedulingDeterministic & probabilistic scheduling

    Resource planningResource planning

    SimulationSimulation

  • 7/31/2019 MIT1_040s09_lec01

    12/21

    Project DynamicsProject Dynamics

    AsAs--planned vs. asplanned vs. as--built (e.g., errors and changes)built (e.g., errors and changes)

    Significance of feedbacksSignificance of feedbacks -- CounterCounter--intuitive effects ofintuitive effects of

    policies (e.g., overtime)policies (e.g., overtime)

  • 7/31/2019 MIT1_040s09_lec01

    13/21

    DESIGN CLOSEOUTDEVELOP-

    MENT DIVESTMENTOPERATIONSFEASIBILITY

    ANALYSIS

    PROJECTMANAGEMENT

    Construction PhasesConstruction Phases

  • 7/31/2019 MIT1_040s09_lec01

    14/21

    Project ManagementProject Management

    1. The phases of1. The phases of-- DevelopmentDevelopment

    -- Close OutClose Out

    Resource SchedulingSimulation

    Basics of Project Monitoring and Control

    Changes and Claims

    Earned Value Analysis

    Quality Reviews and Audits

  • 7/31/2019 MIT1_040s09_lec01

    15/21

    Project ManagementProject Management

    1. The phases of1. The phases of-- DevelopmentDevelopment

    -- Close OutClose Out

    Resource Scheduling

    Simulation

    Basics of Project Monitoring and Control

    Changes and Claims

    Earned Value Analysis

    Quality Reviews and Audits

    Resource Scheduling

    - How to allocate resources ($, time, etc.) to execute a given task efficiently-Trade offs between conflicting/competing resources

    Tools: graphical analyses, programming (linear, integer, heuristic, etc.)

  • 7/31/2019 MIT1_040s09_lec01

    16/21

    Project ManagementProject Management

    1. The phases of1. The phases of-- DevelopmentDevelopment

    -- Close OutClose Out

    Resource SchedulingSimulation

    Basics of Project Monitoring and Control

    Changes and Claims

    Earned Value Analysis

    Quality Reviews and Audits

    Simulation

    - Involves mathematical description/representation of the management process

    - Helps identify optimal schedules and decisions

    - Helps to quickly determine impact of alternative schedules

    -Tools: algorithms implemented on computers

  • 7/31/2019 MIT1_040s09_lec01

    17/21

    Project ManagementProject Management

    1. The phases of1. The phases of-- DevelopmentDevelopment

    -- Close OutClose Out

    Resource SchedulingSimulation

    Project Monitoring and Control

    Changes and Claims

    Earned Value Analysis

    Quality Reviews and Audits

    Project Monitoring and Control

    -How to track your project costs, schedule (time), and other resources- Helps ascertain whether targets are being met

    - Needed so that due changes can be made to schedule as and when necessary

  • 7/31/2019 MIT1_040s09_lec01

    18/21

    Project ManagementProject Management

    1. The phases of1. The phases of-- DevelopmentDevelopment

    -- Close OutClose Out

    Resource SchedulingSimulation

    Basics of Project Monitoring and Control

    Changes and Claims

    Earned Value Analysis

    Quality Reviews and Audits

    Changes and Claims

    -What are the causes of time delays, cost overruns, change orders?

    - How can such problems be prevented or mitigated

    - Conflict resolution

  • 7/31/2019 MIT1_040s09_lec01

    19/21

    Project ManagementProject Management

    1. The phases of1. The phases of-- DevelopmentDevelopment

    -- Close OutClose Out

    Resource SchedulingSimulation

    Basics of Project Monitoring and Control

    Changes and Claims

    Earned Value Analysis

    Quality Reviews and Audits

    Earned Value Analysis

    -is a snapshot in time (as the project is in progress)- compares work plan vs. actual work progress

    - is a standard method of (a) measuring project progress at any given point in time,(b) updating forecasts of completion date and final cost,

    - Is an early warning system to detect deficient or endangered progress.

  • 7/31/2019 MIT1_040s09_lec01

    20/21

    Project ManagementProject Management

    1. The phases of1. The phases of-- DevelopmentDevelopment

    -- Close OutClose Out

    Resource SchedulingSimulation

    Basics of Project Monitoring and Control

    Changes and Claims

    Earned Value Analysis

    Quality Reviews and Audits

    Quality Reviews and Audits

    -Quality Control (typically done by owners inspectors at the end of major production phases.

    - Quality Assurance (typically done by contractor throughout the production, incl. raw materials

    - Audits and QA/QC Reviews (retrospective in nature)

  • 7/31/2019 MIT1_040s09_lec01

    21/21

    Project ManagementProject Management

    1. The phases of1. The phases of-- DevelopmentDevelopment

    -- Close OutClose Out

    2. Related Topics2. Related Topics

    -- Risk and Uncertainty, etc.Risk and Uncertainty, etc.