MISSOURI SWMD DISTRICT ANNUAL REPORTPaper Shredding Truck 54,000.00 32.5000 1,661.54 24 L2017-055...
Transcript of MISSOURI SWMD DISTRICT ANNUAL REPORTPaper Shredding Truck 54,000.00 32.5000 1,661.54 24 L2017-055...
MISSOURI SWMD DISTRICT ANNUAL REPORTFISCAL PERIOD: JULY 1ST - (PREVIOUS YEAR) TO JUNE 30TH - (CURRENT YEAR) | 2019
District L - St.Louis - Jefferson Solid Waste Management District
SOLID WASTE MANAGEMENT DISTRICT ANNUAL REPORT
1 (a). What waste goals did the district have for the fiscal year period and what actions did the districts take to achieve these goals?
A primary District goal is to reduce the amount of waste being generated for disposal wherever possible in our region. The District goalsinclude reducing waste, maximizing recycling, expanding composting, supporting ongoing education in schools, businesses and communities,supporting ongoing regional household hazardous waste management programs, and developing additional end-use markets from recoveredmaterials. The District strives to maximize the economic impact of the recycling industry which provides jobs, tax revenues and other economicbenefits. The District also tries to maximize environmental benefits from the recycling industry, including conserving natural resources, savingenergy, reducing pollution, and reducing greenhouse gas emissions. The District implemented its annual grant program to encourage andsupport projects that reduce, reuse, and recycle waste. The District also provides ongoing information, education and technical assistance toenhance the recycling industry in the St Louis region. All of these efforts contribute to reducing the amount of waste generated for disposal. TheDistrict provides grant funds and staff support to achieve program goals.
1 (b). What waste goals does the district have for the upcoming fiscal period and what actions does the district plan to take to achieve thesegoals. Please include the types of grant proposals that will be sought for the upcoming period to assist in meeting these goals.
The District actively solicits as many grant proposals as possible to maximize the ability to work on all subject areas, and leverage as muchadditional funding as possible. The District receives requests for assistance that are several times greater than the amount of funding available.The District will also continue to provide information, education, and technical assistance to the maximum extent possible. The District goalremains to reduce the amount of waste being generated for disposal wherever possible. Waste reduction projects, including education projects,are eligible projects for the District Grant Program.
2 (a). What recycling goals did the district have for the fiscal year period and what actions did the district take to achievethese goals?
2 (b). What recycling goals does the district have for the upcoming fiscal year period and what actions does the district plan to take to achievethese goals? Please include the types of grant proposals that will be sought for the upcoming period to assist in meeting these goals?
District priorities will continue to expand on the areas mentioned above. Additional emphasis on developing new and expanded local end-usemarkets is important for ensuring sustainability and growth of the recycling industry and maximizing the economic potential of one of Missouri'sprimary green industries. Efforts to reduce contamination and improve processing of single-stream materials will continue to be a focus in 2020.
3 (a). What resource recovery goals did the district have for the fiscal year period and what actions did the district take to achieve thee goals?
The District is supportive of resource recovery but does not have adequate resources to make any significant contributions to this effort.Resource recovery programs are in a good position to tap other resources in an effort to expand their efficiency and utilization. EPA reports thatMissouri landfills emit over two million tons of methane on an annual basis. Given the extremely dangerous nature of these gases, minimizinglandfill methane generation and maximizing recovery continues to be the most prudent course of action.
3 (b). What resource recovery goals does the district have for the upcoming fiscal year period and what actions does the district plan to take toachieve thee goals? Please include the types of grant proposals that will be sought for the upcoming period to assist in meeting these goals.
Resource recovery programs are an eligible grant activity as a potential application for grants. With limited resources and a lower priority forthese types of projects, it is unlikely that district funds would be awarded for any projects. No applications were received.
4. Summarize the types of projects and results during the fiscal year, including previous fiscal years as part of the 5 yearreporting. (add additional rows if needed)
GOAL: ACTION:
1 See Attached File
PROJECT #: * NAME OF PROJECTRESULTING IN
TONNAGE DIVERSIONFROM LANDFILLS:
COST OF PROJECT: NUMBER OF TONSDIVERTED:
AVERAGE COST PERTON DIVERTED:
1L2015-006 Plastics and Fiber
Process75,000.00 1.5000 50,000.00
1/20
2L2016-016 Post Consumer
Polyester Fiber Fill30,000.00 3.5100 8,547.01
3 L2016-059 Heavy Metal 41,000.00 64.1200 639.43
4L2017-003 Recycling Pilot
Program, Phase II55,000.00 44,553.8900 1.23
5
L2017-010 CultivatingLeadership &Education AroundRecycling Solutions
35,000.00 15,797.7000 2.22
6 L2017-011 Glass Crusher 10,000.00 285.0000 35.09
7L2017-014 ST Louis HHW -
Regional CollectionProgram
50,000.00 169.7100 294.62
8 L2017-015 Feed Me 40,000.00 1,353.5900 29.55
9
L2017-019 A New Look & ANew Way of DoingThings: RecyclingInitiatives at UMSL
20,000.00 119.3000 167.64
10L2017-020 Bins Braking
Barriers40,000.00 17,732.7100 2.26
11L2017-021 A Davidson
RecyclingCommitment
40,000.00 221.5000 180.59
12L2017-024 Recycling Cart
Upgrade50,000.00 847.1000 59.02
13L2017-026 Mobilization &
EquipmentProcurement Subsidy
45,000.00 599.5300 75.06
14L2017-027 HELP Satellite
Facility in JeffersonCounty
45,000.00 160.1100 281.06
15L2017-031 St Charles County
ReStore45,000.00 5,124.9200 8.78
16L2017-033 Carpet
ReclamationProgram - Phase VII
25,000.00 72.5000 344.83
17L2017-034 Electronic
Recycling20,000.00 2,750.0000 9.09
18L2017-037 Cardboard Solar
CompactorInstallation
10,000.00 2.2800 4,385.96
19L2017-040 Manufacturing
100% RecycledLumber
55,000.00 50.0000 1,100.00
20 L2017-051 Infeed Conveyor 60,000.00 6,226.1900 9.64
2/20
21 L2017-052 Recycling Carts 7,000.00 277.0500 25.27
22 L2017-053 Fuel Wash U 31,000.00 7.1900 4,311.54
23
L2017-054 RecyclingDumpster Container& Commercial MobilePaper ShreddingTruck
54,000.00 32.5000 1,661.54
24 L2017-055 Bale Out 74,193.53 14,461.3200 5.13
25L2017-056 Go Green With
Grace15,000.00 51.3000 292.40
26L2017-058 Hard Drive
Shredder15,000.00 459.5900 32.64
27L2018-002 St Louis HHW
Regional CollectionProgram
50,000.00 116.9800 427.42
28L2018-004 HHW & E-Scrap
Recycling Project60,000.00 152.7900 392.70
29L2018-005 Recycling on a Roll
Pilot Program, III45,000.00 44,515.8000 1.01
30 L2018-006 Feed Me More 40,000.00 343.4700 116.46
31L2018-008 Styrofoam
Recycling Project70,000.00 397.0800 176.29
32L2018-009 Recycling
Extravaganza20,000.00 44.2500 451.98
33L2018-010 St Charles County
ReStore60,000.00 4,114.5800 14.58
34L2018-011 Manufacturing
100% Recyclables35,000.00 27.0000 1,296.30
35L2018-012 Recycling On The
Go70,000.00 69.8900 1,001.57
36L2018-014 Residential CRT &
TV Recycling20,000.00 395.0000 50.63
37L2018-015 Replacement of 26'
Box Truck40,000.00 391.0000 102.30
38L2018-016 Mobile Hard Drive
Shredding Services40,000.00 538.7200 74.25
39L2018-017 Green Dining
Alliance50,000.00 877.5000 56.98
40L2018-019 Always Green
Recycling in 201830,000.00 176.4000 170.07
41
L2018-020 Project SHARE:School, Home & AllAround RecyclingEducation
35,000.00 17,126.4200 2.04
3/20
42 L2018-022 Roll-Off Containers 35,000.00 1,265.5100 1.17
43L2018-023 MKU Recycling
Roadshow30,000.00 20.0600 1,495.51
44
L2018-024 ConnectingStudents toRecycling Initiativesat UMSL
15,000.00 167.6400 89.48
45L2018-025 Cardboard &
Shrink WrapRecycling Program
25,000.00 153.0400 163.36
46L2018-026 Recycling
Program, Phase VIII20,000.00 124.6400 160.49
47 L2018-027 ReStore 2018 30,000.00 359.0000 83.57
48L2018-028 2018 Recycle Cart
ReplacementProgram
50,000.00 568.0000 88.03
49L2018-032 Depackager
Operations Grant25,000.00 0.0000 0.00
50L2018-033 Electronic
Recycling20,000.00 665.0000 30.08
51L2018-034 Pantry Patron
Expansion30,000.00 99.0000 303.03
52 L2018-035 Independence 60,000.00 23,592.4900 2.54
53L2018-036 Television
Recycling EducationProgram
20,000.00 1,497.4900 13.36
54L2018-037 Residential
RecyclingImprovement Project
50,000.00 0.0000 0.00
55L2018-038 Refab
Deconstruction100,000.00 489.5000 204.29
56L2018-039 Workforce
Expansion30,000.00 99.5000 301.51
57 L2018-042 Save the Organics 15,000.00 2,987.5000 5.02
58L2018-043 Leftovers, etc.
Resource & LearningCenter
30,000.00 0.0000 0.00
59L2018-045 St Louis HELP
Recycling &Expansion Project
25,000.00 32.2500 775.19
60 L2018-047 C & D Upgrade 40,000.00 78,906.0000 0.51
61 L2018-048 Perennial 20,000.00 11.7800 1,697.79
62 L2018-051 Beer Disposal 4,000.00 0.0000 0.00
4/20
63L2018-053 Jewish Food
Pantry CompostingProgram
20,000.00 106.4000 187.97
64 L2018-056 Furnishing Hope 15,000.00 136.7800 109.67
65L2019-002A Waste
Management SingleStream Recycling
28,000.00 314.6700 80.98
66L2019-002C City of Ellisville
Single StreamRecycling
12,500.00 196.7800 63.52
67L2019-002D City of Brentwood
Single StreamRecycling
11,400.00 159.3500 71.54
68L2019-002E City of Kirkwood
Single StreamRecycling
52,500.00 1,050.0000 50.00
69L2019-002F Waste Connections
Single StreamRecycling
45,000.00 2,774.0300 16.22
70L2019-002G City of St. Peters
Recycling Expansion23,400.00 0.0000 0.00
71L2019-002H Central Paper
Stock Single StreamAssistance
38,799.00 0.0000 0.00
72L2019-003 2019 St Charles
County RecyclingProgram
100,000.00 0.0000 0.00
73L2019-004 St Louis HHW
Waste Collection100,000.00 0.0000 0.00
74L2019-005 City of Brynes Mill
Recycling Center45,000.00 0.0000 0.00
75L2019-006 Recycling
Extravaganza EventSeries
20,000.00 0.0000 0.00
76L2019-008 Recycling On A Roll
Pilot Program, IV100,000.00 0.0000 0.00
77L2019-009 River CleanUP
Program7,500.00 0.0000 0.00
78L2019-010 Recycling on the
Go65,000.00 0.0000 0.00
79L2019-011 Ninth Annual
Recycle Day, 9-21-198,500.00 0.0000 0.00
80L2019-012 Uniform
Repurpose40,000.00 0.0000 0.00
5/20
81L2019-014 2019 Recycle Cart
ReplacementProgram
70,000.00 0.0000 0.00
82L2019-016 New Employee
Positions35,000.00 0.0000 0.00
83L2019-017 Breckenridge Hills
Recycling Program25,000.00 0.0000 0.00
84 L2019-018 Keep Me Dry 35,000.00 0.0000 0.00
85L2019-020 Always Green
Recycling 2019Project
15,000.00 0.0000 0.00
86
L2019-021 St Louis HELP -JeffersonCounty/City of St.Louis
25,000.00 0.0000 0.00
87 L2019-022 Roll Off Truck 85,000.00 0.0000 0.00
88L2019-023 Cardboard Drop
Off Containers55,000.00 0.0000 0.00
89L2019-025 Recycling Road
Show30,000.00 0.0000 0.00
90
L2019-026 Habitat forHumanity of StCharles CountyReStore
25,000.00 0.0000 0.00
91L2019-027 SHARE 2:0 School,
Home & All AroundRecycling
50,000.00 0.0000 0.00
92L2019-029 Creative Reuse
Programs20,000.00 0.0000 0.00
93L2019-030 Green Dining
Alliance50,000.00 0.0000 0.00
94L2019-031 Valley Park
Recycles6,409.39 0.0000 0.00
95L2019-032 Residential CRT &
TV Recycling15,000.00 0.0000 0.00
96L2019-034 Procurement for
Mobile HDD/SSDShredder
45,000.00 0.0000 0.00
97L2019-035 Recycling Program
201915,000.00 0.0000 0.00
98L2019-036 2019 DORI
Electronics25,000.00 0.0000 0.00
99L2019-037 Glass Recycling
Depositories45,000.00 0.0000 0.00
6/20
100L2019-038 Replacement of 26'
Box Truck25,000.00 0.0000 0.00
101 L2019-039 Grappling 30,000.00 0.0000 0.00
102L2019-040 Electronic
Recycling 201920,000.00 0.0000 0.00
103L2019-041 Truck & Rollcarts
to Expand RecyclingCollection Activities
20,000.00 0.0000 0.00
104L2019-042 Single Stream
Recycling RearLoader
20,000.00 0.0000 0.00
105L2019-043 OFS Electronic
Tablet ReceiptProgram Expansion
7,000.00 0.0000 0.00
106L2019-046 Cardboard &
Shrink WrapRecycling Program, II
23,000.00 0.0000 0.00
107L2019-047 Personnel Salaries
To Operate25,000.00 0.0000 0.00
108L2019-048 Improving
Recycling25,000.00 0.0000 0.00
109 L2019-049 Furnishing Hope 20,000.00 0.0000 0.00
110L2019-050 Community
Bicycle RecycleEfforts
15,000.00 0.0000 0.00
111L2019-051 City Recycling
Improvement Project40,000.00 0.0000 0.00
112L2019-054 Leftovers, etc.
Resource & LearningCenter
20,000.00 0.0000 0.00
113
L2019-057 Vehicle forEnhancing aSuccessful Multi-Family RecyclingProgram
20,000.00 0.0000 0.00
114L2012-003PI HW Waste
Collection225,000.00 38.3800 5,862.43
115L2014-018 Saving Trees from
Trailer to Baler40,000.00 3,999.2200 10.00
116L2015-011 Education in
Textile Recycling13,000.00 34.5700 376.05
117 L2015-026 Bigger Better Baler 50,000.00 2,206.0000 22.67
118L2015-039 Trailers for Green
Growth35,000.00 3,240.7800 10.80
7/20
119L2015-046 4 A Greener Game
Recycling Program15,000.00 17.2900 867.55
120L2016-007 Recycling Pilot
Program 2016-201730,000.00 16.9000 1,775.15
121L2016-010 Mighty Monster
Baler40,000.00 4,087.5300 9.79
122L2016-017 Drop Trailer
Service10,000.00 885.0000 11.30
123
L2016-029 Commercial SingleStream RecyclingRear-Loader Truck &Driver
75,000.00 528.1500 142.01
124 L2016-033 Clamp & Roll 20,000.00 4,026.0000 4.97
125L2016-045 Construction &
Demolition Recycling90,000.00 21,485.4200 4.19
126L2016-058 Zoo Recycling
Program Equipment14,000.00 680.8000 20.56
127L2017-029 Recycling
Expansion Program25,000.00 81.5600 306.75
128L2012-011 Always Green
Recycling Project45,000.00 1,555.0000 28.94
129L2012-031 Mercy Recycling
Program40,000.00 0.6500 61,538.46
130L2012-056 Go Green with
Grace80,000.00 1,072.3900 74.60
131L2012-059 2012 Food
Composting & GlassRecycling Program
60,000.00 1,198.5000 50.06
132 L2013-002 Waste Replaced 25,000.00 1,550.0000 16.13
133L2013-003 Expansion of
Asphalt ShingleRecycling
60,000.00 0.0000 0.00
134L2013-020 Always Green
Recycling Project90,000.00 2,517.0000 35.76
135L2013-030 Organic Cardboard
& Plastic RecyclingProject
75,000.00 116.0000 646.55
136L2013-039 Food for the
Hungry10,000.00 110.0000 90.91
137L2013-042 Electronics
Collection &Processing
15,000.00 125.0000 120.00
138L2013-047 Mercy Recycling
Program50,000.00 85.0000 588.24
8/20
139
L2013-049 DeconstructingHomes to CreateJobs and PromoteCreative Re-Use
25,000.00 123.0000 203.25
140L2014-002 HHW Expansion
Program70,000.00 9.0600 7,726.27
141L2014-006 Electronics
Recycling ExpansionProject
34,000.00 3,000.0000 11.33
142L2014-009 Carpet
ReclamationProgram, Phase IV
24,000.00 37.1200 646.55
143L2014-012 St Charles County
ReStore60,000.00 7,562.2300 7.93
144L2014-014 Always Green
Recycling Project50,000.00 3,104.0000 16.11
145 L2014-022 Refab 40,000.00 40.0000 1,000.00
146L2014-027 2014 Food
Composting Program35,000.00 3,206.0000 10.92
147L2014-043 Recycling &
Composting in theMarietta Parking Lot
8,000.00 482.0000 16.60
148L2014-050 Expansion of
Asphalt ShingleRecycling Operation
50,000.00 20,196.0000 2.48
149L2015-002 2015 St. Charles
County Recycling &Equipment Project
50,000.00 54.9000 910.75
150L2015-005 Computer De-
Manufacturing29,681.00 53.5800 553.96
151L2015-010 Always Green
Recycling Project80,000.00 3,598.0000 22.23
152 L2015-016 REFAB 80,000.00 494.0000 161.94
153 L2015-017 INC 120,000.00 21,234.9600 5.65
154L2015-018 Drop Off Area
Upgrade, Expansion& Education
45,000.00 20.8800 2,155.17
155L2015-022 Expansion of
Asphalt ShingleRecycling
64,500.00 0.0000 0.00
156 L2015-024 Extruder 60,000.00 57.7500 1,038.96
157L2015-029 2015 Recycle Truck
& EducationalMailers
75,000.00 495.6800 151.31
9/20
5.Summarize projects not resulting in Tonnage Diversion
158L2015-042 Mercy Recycling
Program12,000.00 0.8000 15,000.00
159L2015-055 Expansion of
Asphalt ShingleRecycle Operation
64,500.00 1,056.0000 61.08
160 L2013-057 Pallet Recycling 20,000.00 1,828.0000 10.94
161
L2016-002 2016 St. CharlesCounty HHWImplementation &Electronic Recycling
60,000.00 19.0000 3,157.89
162L2016-005 Clean Compost
Project25,000.00 475.0000 52.63
163L2016-019 Always Green
Recycling9,000.00 1,435.0000 6.27
164L2016-020 OFS Conveyor
Project20,000.00 385.0000 51.95
165L2016-021 Carpet
ReclamationProgram, Phase VI
15,000.00 141.2500 106.19
166L2016-031 2016 Food
Composting Program50,000.00 3,358.0000 14.89
167L2016-051 Recycling
ElectronicsExpansion
70,000.00 3,559.0000 19.67
168L2016-052 Mercy Recycling
Program12,000.00 76.2500 157.38
169L2018-017 Green Dining
Alliance50,000.00 1,785.3000 20.01
LIST PROJECTS BY NUMBER AND NAMENOT RESULTING IN TONNAGEDIVERSION FROM LANDFILLS.
COST OF PROJECT: MEASURABLE OUTCOMES ACHIEVEDFOR THESE PROJECTS:
1
L2017-044 Building A Respectful &Resourceful Community
40,000.00 held 3 summer camps at publiclibraries education workshops held 12VAN GO presentations held 10workshops impacted 20,000 newchildren providing families andclassrooms with their re-useableresources
10/20
2
L2018-003 Strengthening RegionalRecycling Goals
65,000.00 Presented 64 On-Demand Lessons,impacted 2,176 students Presented 16Special Projects, impacted 134students Presented 4 Teachertrainings, impacted 52 teachers.Presented 3 teacher workshops,impacted 9 teachers Held 7 highereducation meetings, impacted 67college students Produced 6newsletters Held Green Living Festivalwith 4,005 attendees, gave 9sustainability tours for 224participants, held 30 adult educationclasses with 345 participants. Attended39 community events with 1,943participants.
3
L2018-013 Recycle Right St. Louis 125,000.00 Achieved over 1.5 million hitsthrough social media. Impacted over300 people through public event.Featured on 30 media channels Held 4Facebook Live events that was shareda total of 225 times with a combinedviewing of 24,000 views.
4
L2018-021 ReUse ReStoresImagination
30,000.00 Presented 5 education workshopsPresented 36 VAN GO presentations,impacting 3,332 parents and students 2recycle centers open 4 days a week,impacting 24, 546 parents and students
5
L2018-029 Green Building Educationfor Waste Diversion
20,000.00 Held 24 education programs thatintegrate recycling, waste diversionand reuse and promote their alignmentwith LEED Green Building RatingSystem, impacting 1131 attendees.Had 59 schools participate in the GreenSchools Quest, impacting 3,500students and teachers Held 2 LEEDGreen Associate Exam Prep course and2 WELL AP Exam Prep course with atotal of 17 attendees. Held 10 evenprograms related to wasteminimization with 1021 attendees.Held 10 sessions and webinars with275 attendees.
6L2018-031 Missouri Product
Stewardship Council: A Multi-DistrictEducation & Action Forum
30,000.00 Held 14 MO PSC meetings, plus 6Executive committee meetings with 80attendees.
7
L2018-046 Project Earth 10,000.00 Published 6 quarter page recyclinglessons in "The American", anewspaper serving the city schools,impacting over 80, 000 students andteachers
8L2018-052 Hansen's Summit 5,000.00 Held composting summit, impacting
90 attendees
11/20
6. Identify separate statistics for items banned from landfills:
7. Identify separate statistics for items NOT banned from landfills:
8. Describe your district's grant proposal evaluation process.
Grant Proposals are evaluated in accordance with grant regulations set forth by DNR. Proposals are evaluated individually by executive boardmembers using criteria in DNR regulations. Individual board member scores are tallied and averaged to generate a ranked list of projects.Executive Board members reviewing grants allocate funds to projects by rank. Funds are allocated to leverage as much additional investmentas possible and fund as many projects as possible. Most projects only receive partial funding of the requested amounts. The Executive Boardapproves the list of projects with funding levels. These are submitted to DNR for review.
9
L2018-054 Go Green 20,000.00 Grantee met all of the workforcedevelopment goals by collaboratedwith 15 industries for job placements.Placed 36 people into new "green" jobs93 people trained to be placed in new"green" jobs
10L2018-055 COAM Workshop 2018 5,000.00 Held composting summit, impacting
48 attendees
11L2018-057 In The Green Productions
Presents Jack Kaufmann10,000.00 Held 20 multi-media recycling
presentations, impacting 3,520teachers and students
12L2019-002L Wentzville Recycle
Conversion10,750.00 Produced and delivered 13,500
postcards to residents regarding singlestream contamination.
13L2019-002M Lake St. Louis
Communication Plan10,000.00 Produced and delivered 10,567
postcards to residents regarding singlestream contamination.
14
L2019-002N Waste ConnectionsSingle Stream Recycling Education
9,750.00 Produced and delivered 4000 flyersto residents regarding single streamcontamination and 600 stickers forcarts that were contaminated.
LIST PROJECTS BYNUMBER AND NAME
RESULTING INTONNAGE DIVERSION
FROM LANDFILLS.
LIST COST OFPROJECT RESULTING
IN TONNAGEDIVERSION:
NUMBER OF TONSDIVERTED FROM
PROJECT:
AVERAGE COST PERTON DIVERTED:
MEASURABLEOUTCOMES
ACHIEVED FORTHESE PROJECTS:
1L2018-030 St Louis
Consolidation Center30,000.00 293.0000 102.39 keeping lamps out
of the landfill byusing packing boxes
2L2017-057 St Louis
Consolidation Center13,000.00 73.0000 178.08 keeping lamps out
of the landfill byusing packing boxes
LIST PROJECTS BY NUMBERAND NAME RESULTING IN
TONNAGE DIVERSION FROMLANDFILLS.
LIST COST OF PROJECTRESULTING IN TONNAGE
DIVERSION:
NUMBER OF TONSDIVERTED FROM PROJECT:
AVERAGE COST PER TONDIVERTED:
1. Board and Council Members
12/20
Name:
Jean Ponzi
Check:
Board Council
Representative of:
County Public
City Other
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
4344 Shaw Blvd.
City:
St Louis
State:
MO
Zip Code:
63110
Phone number with area code:
314-577-0246
Fax:
Email:
2. Board and Council Members
Name:
Don Orf
Check:
Board Council
Representative of:
County Public
City Other
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
6523 Delor
City:
St Louis
State:
MO
Zip Code:
63109
13/20
Phone number with area code:
314-640-2796
Fax:
Email:
3. Board and Council Members
Name:
Eric Larson
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
Jefferson County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
P.O, Box 100
City:
Hillsborol
State:
MO
Zip Code:
63050
Phone number with area code:
(636)797-6411
Fax:
Email:
4. Board and Council Members
Name:
Robert Bradshaw
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
14/20
Jefferson County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
P.O, Box 100
City:
Hillsboro
State:
MO
Zip Code:
63050
Phone number with area code:
636-797-5043
Fax:
Email:
5. Board and Council Members
Name:
Jamie Paige
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
St Charles County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
1001 Schroeder Creek Blvd.
City:
Wentzville
State:
MO
Zip Code:
63385
Phone number with area code:
636 639-2055
Fax:
Email:
15/20
6. Board and Council Members
Name:
Ryan Tilley
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
St Charles County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
1650 Boone's Lick Road
City:
St Charles
State:
MO
Zip Code:
63301
Phone number with area code:
636-949-7406
Fax:
Email:
7. Board and Council Members
Name:
Tim Warren
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
St Louis County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
16/20
6060 Valley View Drive
City:
St Louis
State:
MO
Zip Code:
63089
Phone number with area code:
636-405-0444
Fax:
Email:
8. Board and Council Members
Name:
Jennifer Gauble
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
St Louis County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
701 College Road
City:
Lebanon
State:
IL
Zip Code:
62254
Phone number with area code:
314-484-0434
Fax:
Email:
9. Board and Council Members
Name:
17/20
Pat Kelly
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
St Louis County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
1034 S. Brentwood Blvd #410
City:
Brentwood
State:
MO
Zip Code:
63117
Phone number with area code:
314-726-4747
Fax:
Email:
10. Board and Council Members
Name:
Kathrina Dunegan
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
St Louis County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
6121 N. Hanley
City:
St. Louis
State:
MO
18/20
Zip Code:
63121
Phone number with area code:
314-615-8936
Fax:
Email:
11. Board and Council Members
Name:
Julie Griffin
Check:
Board Council
Representative of:
County Public
City Other
PLEASE DESCRIBE "OTHER"
St. Louis Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
13115 Lester Drive
City:
St Louis
State:
Missouri
Zip Code:
63138
Phone number with area code:
314-791-8083
Fax:
Email:
12. Board and Council Members
Name:
Vijay Bhassin
Check:
Board Council
Representative of:
19/20
Response created on: Jan 8, 2020 at 12:09 PM CST by [email protected]
Response last updated on: Feb 18, 2020 at 08:35 AM CST by [email protected]
Upload File:
2019 Annual Report by Dave final.docx Maximum of 5 mb file size
County Public
City Other
PLEASE DESCRIBE "OTHER"
St Louis County Representative
Official Title:
Officer Chair
Vice-Chair Secretary
Treasurer Other
Address:
12726 Chandler Ridge Ct.
City:
St Louis
State:
Missouri
Zip Code:
63131
Phone number with area code:
314-488-4148
Fax:
Email:
20/20
1 (a). What waste goals did the district have for the fiscal year period and what actions did the districts take to achieve these goals?
1 (a) A primary District goal is to reduce the amount of waste being generated for disposal wherever possible in our region. The District goals include reducing waste, maximizing recycling, expanding composting, supporting ongoing education in schools, businesses and communities, supporting ongoing regional household hazardous waste management programs, and developing additional end-use markets from recovered materials. The District strives to maximize the economic impact of the recycling industry which provides jobs, tax revenues and other economic benefits. The District also tries to maximize environmental benefits from the recycling industry, including conserving natural resources, saving energy, reducing pollution, and reducing greenhouse gas emissions. The District implemented its annual grant program to encourage and support projects that reduce, reuse, and recycle waste. The District also provides ongoing information, education and technical assistance to enhance the recycling industry in the St Louis region. All of these efforts contribute to reducing the amount of waste generated for disposal. The District provides grant funds and staff support to achieve program goals.
1 (b). What waste goals does the district have for the upcoming fiscal period and what actions does the district plan to take to achieve these goals. Please include the types of grant proposals that will be sought for the upcoming period to assist in meeting these goals.
1 (b) The District actively solicits as many grant proposals as possible to maximize the ability to work on all subject areas, and leverage as much additional funding as possible. The District receives requests for assistance that are several times greater than the amount of funding available. The District will also continue to provide information, education, and technical assistance to the maximum extent possible. The District goal remains to reduce the amount of waste being generated for disposal wherever possible. Waste reduction projects, including education projects, are eligible projects for the District Grant Program.
2 (A) WHAT RECYCLING GOALS DID THE DISTRICT HAVE FOR THE FISCAL YEAR PERIOD AND WHAT ACTIONS DID THE DISTRICT TAKE TO ACHIEVE THESE GOALS?
The District goal is to maximize recycling throughout the region. The recycling industry is in a period of significant uncertainty due to the disruption of recycling markets for certain materials due to the National Sword policy being implemented in China. This situation is in a period of flux, but it could cause significant short-term problems for co-mingled recycling programs. One of the two major single-stream recycling processors closed in 2018. The District has funded a regional education campaign to keep communities informed and is also providing some short-term financial support through a plan implementation project. Additional education efforts may be needed to focus on reducing contamination in single stream recycling programs. Longer term challenges are to significantly expand the Missouri Market Development program to develop Missouri-based end-use markets for recovered materials.
Progress continues despite the significant reduction in financial resources available since 2005. The amount of funding available to support the growth of the industry is carefully allocated to support all aspects of the District mission and leverage additional resources. To illustrate, selected highlights are discussed below.
Reducing contamination in residential recycling remains a priority and much progress has been made as single-stream recycling collection continues to function. Single-stream collection now predominates for residential collection in the region. A major educational effort is underway to reduce contamination in single-stream collection programs. It is too soon to tell if single-stream will be able to continue as it has been, or if recycling collection program changes will be needed in the future. Education to continue to expand participation and reduce contamination are needed for the next several years. Educational efforts to reinforce participation are occurring, but more education will be needed, including programming to reduce contamination.
Commercial recycling also continues to grow in the amount of materials being diverted. Businesses throughout the region, state, and country continue to green their operations, and recycling is always one of the first steps toward sustainability. Commercial recycling streams are generally cleaner than residential single-stream recycling materials and are better able to be marketed.
Recycling markets fluctuations and sluggish markets continue to be an impediment, and there is an economic opportunity to turn these resources into value-added products at the local level. Local end-use market development will continue to increase in importance as recycling grows as a global industry. Additional financial resources could really help this effort. More recycled product manufacturing could have an important impact in the region and state in terms of jobs and tax revenues.
2 (b). What recycling goals does the district have for the upcoming fiscal year period and what actions does the district plan to take to achieve these goals? Please include the types of grant proposals that will be sought for the upcoming period to assist in meeting these goals?
2 (b) District priorities will continue to expand on the areas mentioned above. Additional emphasis on developing new and expanded local end-use markets is important for ensuring sustainability and growth of the recycling industry and maximizing the economic potential of one of Missouri's primary green industries. Efforts to reduce contamination and improve processing of single-stream materials will continue to be a focus in 2020.
3 (a). What resource recovery goals did the district have for the fiscal year period and what actions did the district take to achieve these goals?
3 (a) The District is supportive of resource recovery but does not have adequate resources to make any significant contributions to this effort. Resource recovery programs are in a good position to tap other resources in an effort to expand their efficiency and utilization. EPA reports that Missouri landfills emit over two million tons of methane on an annual basis. Given the extremely dangerous nature of these gases, minimizing landfill methane generation and maximizing recovery continues to be the most prudent course of action.
3 (b). What resource recovery goals does the district have for the upcoming fiscal year period and what actions does the district plan to take to achieve these goals? Please include the types of grant proposals that will be sought for the upcoming period to assist in meeting these goals.
3(b) Resource recovery programs are an eligible grant activity as a potential application for grants. With limited resources and a lower priority for these types of projects, it is unlikely that district funds would be awarded for any projects. No applications were received.
8. Describe your district's grant proposal evaluation process.
Grant Proposals are evaluated in accordance with grant regulations set forth by DNR. Proposals are evaluated individually by executive board members including criteria in DNR regulations. Individual board member scores are tallied and averaged to generate a ranked list of projects. Executive Board members review ranked grants and allocate appropriate funds to projects. Funds are allocated to leverage as much additional investment as possible and fund as many projects as possible. Most projects only receive partial funding of the requested amounts. The Executive Board approves the list of projects with funding levels. These are submitted to DNR for review.