Mission Unit 12m Glide Installation Instructions CZU026 Page 1 Rev 01

Transcript of Mission Unit 12m Glide - sutcliffeplay.co.uk · Mission Unit Installation Instructions 1 Check...

Page 1: Mission Unit 12m Glide - sutcliffeplay.co.uk · Mission Unit Installation Instructions 1 Check using the Parts List that none of the components are missing. 2 Plan the final position

Mission Unit12m Glide

Installation Instructions

CZU026

Page 1Rev 01

Page 2: Mission Unit 12m Glide - sutcliffeplay.co.uk · Mission Unit Installation Instructions 1 Check using the Parts List that none of the components are missing. 2 Plan the final position

CZU026Mission UnitInstallation Instructions

1 Check using the Parts List that none of the components are missing.

2 Plan the final position of the play equipment ensuring there is sufficient space.

3 Excavate the foundation holes in accordance with the plan.

4 Each leg is numbered to correspond with the foundation plan.

5 Position 2 off 300 long spragging irons into the holes provided in each post upright and stand in the foundation holes.

6 Join each pair of posts together at the top with the bracing brackets. Ensure the two vertical posts are 12M apart, center to center.

7 Fill the foundation holes to the required depth with concrete.

8 Do not allow the equipment to be used until the concrete has set (2 - 3 days) and the required safety surfacing has been installed.

9. Fit the foot rests and rail. Fit the cable assembly as shown on the detail sheet. It is very important that the cable is not pulled tight, or this will put too much strain on the posts. There must always be some sag in the cable.

10 Tighten all fixing bolts and fit covers

11 Follow the maintenance instructions supplied.

During installation care must be taken to prevent hazards to children.Extra care should be taken if conditions are abnormal.

Page 2Rev 01

Page 3: Mission Unit 12m Glide - sutcliffeplay.co.uk · Mission Unit Installation Instructions 1 Check using the Parts List that none of the components are missing. 2 Plan the final position

Rev 01

Glide AssemblyMissionInstallation Instructions

U Bolt Installation Instructions

Page 3

Page 4: Mission Unit 12m Glide - sutcliffeplay.co.uk · Mission Unit Installation Instructions 1 Check using the Parts List that none of the components are missing. 2 Plan the final position

Page 4Rev 01

CZA

022

CZA

190

CZS

220

Ref

D

escr

iptio

n Q

tyC

ZA02

2 C

rank

ed L

H D

Rai

l 1

CZA

190

12M

Glid

e 1

CZS

220

Han

d/Fo

ot H

olds

6

CP

U02

6 P

osts

(set

of 4

) 1

Set

CZU

026F

Fix

ing

Kit

1 S

et

Whe

n fit

ting

the

cabl

e as

sem

bly

to th

e po

sts,

ens

ure

the

conc

rete

is fu

lly s

et. T

he c

able

mus

t alw

ays

have

som

e sa

g,

do n

ot a

djus

t the

cab

le to

o tig

ht o

r it w

ill p

ut e

xces

sive

stra

in

on th

e su

ppor

t pos

ts.

Adj

ust t

he s

eat c

hain

leng

th to

giv

e a

min

imum

sea

t cle

aran

ce

of 3

50m

m w

hen

load

ed w

ith a

69.

5kg

wei

ght.

The

sea

t is

supp

lied

with

ext

ra c

hain

link

s so

exc

ess

can

be re

mov

ed to

ob

tain

the

corr

ect s

eat c

lear

ance

if re

quire

d.

Mis

sion

Uni

tPa

rts

List

CZU

026

Page 5: Mission Unit 12m Glide - sutcliffeplay.co.uk · Mission Unit Installation Instructions 1 Check using the Parts List that none of the components are missing. 2 Plan the final position

Page 5

Recommended Regular Inspection and Maintenance Interval Days 7 14 28 56 365

Check stability of structure, tighten connections if required.

Check all uprights at ground level for corrosion and/or rot.Replace any defective parts.

Check all painted elements for damage, rub down and repaint or replace as required.

Check chain/ropework assemblies for wear and damage, replace if required.

Check rotating and pivot points for wear and smooth runninglubricate or replace if required.

Check rubber parts for wear and/or damage, replace if required.

Check tension cables, adjust if required.

Check wear of cables, replace if required.

Check slide chutes for smoothness and any foreign elements, remove any found.

Check rubber safety surfaces for damage and poor performance, repair or replace if required.

Check loose fill safety surfaces, remove any foreign elements, rake level and top up if required.

Disposal Instructions

All components should be broken down into categories of:-1 Mild Steel - all Swing Frames, Playzone, Toddlerzone, Teenzone activities, Mission, Deck Frames and Springie Frames.2 Stainless Steel - all Slides, Mirror Panels.3 Aluminium - all Playzone, Mission and Toddlerzone Posts.4 Galvanised Steel - all Chains and Teenzone Posts.5 Moulded Rubber Products without steel inserts - all Mission and Toddlerzone Caps and edge details.6 Timber - all natural timber, plywood, and MDF panels.Wherever possible these materials should be taken to specialist recycling organisations and recycled.In some cases where composite materials are used, then disposal at land fill sites is the only alternative such as:7 Moulded Rubber Products encasing steel inserts - all Swing Seats, Deck Tops, Duo/Dizzy Disc Tops.8 High Pressure Laminate - all Toddlerzone, Playzone and Teenzone Panels.9 Steel Core Polypropylene Rope - all Scramble Nets, Space Nets, Playzone/Toddlerzone/Mission Ropes.

CZU026Mission UnitMaintenance Instructions

Rev 01

NOTEThe warranty is invalidated if these instructions are not followed.All wood needs annual inspection and retreatment where required.