UKSEDS Space Conference 23rd February 2013
Status Update James Webb Space Telescope
Launch Readiness Date: October 31, 2018
Public Web Site:
www.JWST.nasa.gov
John Thatcher MIRI European Consortium
Project Manager Astrium Ltd
Stevenage
![Page 2: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/2.jpg)
Outline
Introduction & Overview
Status – the ‘bits’
Launch and Deployment
Observations from an Oldie
![Page 3: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/3.jpg)
JWST Key Points
JWST is the successor to the Hubble Space Telescope
It is a joint mission by NASA, ESA (European Space Agency) & CSA (Canadian Space Agency)
JWST is named after the 2nd NASA Administrator (1961-1968) who drove the Apollo program whilst ensuring the future of space science missions
The Observatory is optimized for infrared observations (0.6 – 28 microns) for looking a long way back in space and time in order to study the origin and evolution of galaxies, stars and planetary systems
The telescope & instruments operate at cryogenic temperatures to get the necessary infrared performance to deliver that science:
![Page 4: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/4.jpg)
The Key Science Goals for JWST
First Light and Re-Ionization Assembly of Galaxies
Birth of Stars and Proto-planetary Systems
Planetary Systems and the Origin of Life
GL146 HH-30
M81
![Page 5: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/5.jpg)
European Scientists’ View on JWST (After Project’s Near-Death Experience in 2011)
• It is not “just hype” to say that ‘JWST is so scientifically powerful and able to address the key outstanding questions that it will transform astrophysics and cosmology’
• JWST is also technically audacious
• The JWST project is working hard to meet the 2018 launch date
• The associated lifetime cost of $8.7 billion is “public knowledge”…
• …but that is still significantly less than one dollar per light year of looking back in space and time!
5
![Page 6: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/6.jpg)
Mission Objective • Study the origin and evolution of galaxies, stars and
planetary systems – Optimized for infrared observations (0.6 – 28 µm)
Organization • Mission Lead: Goddard Space Flight Center • International collaboration with ESA & CSA • Prime Contractor: Northrop Grumman • Instruments:
– Near Infrared Camera (NIRCam) – Univ. of Arizona – Near Infrared Spectrograph (NIRSpec) – ESA – Mid-Infrared Instrument (MIRI) – EC/JPL – Fine Guidance Sensor (FGS) – CSA
• Operations: Space Telescope Science Institute (STScI)
Description • Deployable telescope w/ 6.5m diameter segmented adjustable primary mirror • Cryogenic temperature telescope and instruments for infrared performance • Launch October 2018 on an ESA-supplied Ariane 5 ECA rocket to Sun-Earth L2 • 5-year science mission + 2 years of data analysis
Warm, Sun-facing side
Cold, space-facing side
Integrated Science Instrument Module (ISIM)
Optical Telescope Element (OTE)
Sunshield
Spacecraft Bus
Phase A Phase B Phase C/D Phase E
Concept Development Design, Fabrication, Assembly and Test
Formulation Authorization
T-NAR Launch
Science Ops
ICR (PNAR)
NAR
Integrated Science Instrument Module (ISIM)
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
James Webb Space Telescope (JWST)
![Page 7: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/7.jpg)
Major Design Drivers • Need a big primary mirror for sensitivity – 6.5m diameter minimum
– So needs to be lightweight and deployable to fit in rocket fairing
• Need to be cold (to detect light shifted to the infrared) – This is where the science is! – Cannot then sensibly be in Earth orbit – need to go to L2 with a
big sunshield so telescope/instruments at ~40 Kelvin (-233 C)
• Need precision pointing, stability, wavefront sensing & control and state of the art optics and detectors
• Hence: – Need a big spacecraft (6.5 tonnes at launch) – Need big test equipment & facilities – Need a lot of money! ($8.7 billion+) and time – Need large collaboration of countries, agencies & institutes – Plus need at least the usual ‘one miracle per major project’… – …along with strong nerves and a thick skin.
![Page 8: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/8.jpg)
JWST – The Observatory Per The Design Drivers
![Page 9: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/9.jpg)
JWST Observatory Elements
Primary
Sun Shield
Spacecraft Bus
Secondary ISIM Backplane
Tertiary
![Page 10: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/10.jpg)
JWST System Hierarchy
James Webb Space Telescope System
Launch Segment Observatory Segment Ground Segment
Integrated Science Instrument Module (ISIM)
Optical Telescope Element (OTE)
Spacecraft Element (SE)
Launch Vehicle
Payload Adapter
Launch Site Services
Science and Operations Center (SOC)
Common Command And Telemetry System (CCTS)
Institutional Services
Spacecraft Bus
Sunshield
Ariane Launcher JWST Observatory Deep Space Network
Space Telescope Science Institute
![Page 11: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/11.jpg)
Big Spacecraft (JWST Full Size Model with Goddard Team)
![Page 12: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/12.jpg)
12
Another Reminder of How Big JWST Is
![Page 13: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/13.jpg)
Outline
Introduction & overview
Status – the ‘bits’ (major ones)
Launch and deployment
Observations from an Oldie
![Page 14: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/14.jpg)
A2 17 nm
A4 10 nm
A1 16 nm
C3 14 nm
B6 16 nm
A5 15 nm
B3 8 nm
C5 15 nm
A6 18 nm
B5 9 nm
B8 14 nm
EDU 15 nm
C4 15 nm
C6 10 nm
C2 15 nm
A3 10 nm
B2 13 nm
C1 9 nm
B7 14 nm
Primary Mirror Polishing is Completed and All the Segments are Gold Coated
Measured total figure error of 13.3 nm rms is
well below requirement of 17 nm
![Page 15: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/15.jpg)
![Page 16: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/16.jpg)
Mirror Assembly at Ball Aerospace
Final Configuration 3 Assembly
Hexapod assembly to mirror substrate
Mirror Handling GSE
Hexapod/RoC assembly in progress
![Page 17: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/17.jpg)
Secondary Mirror Assembly
![Page 18: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/18.jpg)
Tertiary Mirror Assembly
TM substrate and sub-bench TM handling GSE
TM in optical test stand TM testing
![Page 19: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/19.jpg)
Fine Steering Mirror
FSM in vibration testing
![Page 20: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/20.jpg)
Completed Backplane Center Section
Flight Backplane Assembly
Assembling Side
Frames
![Page 21: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/21.jpg)
Integrated Science Instrument Module (ISIM)
![Page 22: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/22.jpg)
Flight Mid-InfraRed Instrument (MIRI)
![Page 23: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/23.jpg)
The Mid-Infra Red Instrument (MIRI)
![Page 24: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/24.jpg)
European Consortium Who & Where
ESA/ESTEC JWST Project Office Prodex Office
DTU Space Hexapod
ETH Contamination Control Cover Cryo Harness
INTA MIRI Telescope Simulator (MTS)
CEA Imager Coronagraph Analysis LESIA/LAM Coronograph
CSL Input, Optics & Calibration (IOC) Instrument Control Electronics (ICE) Imager Mirrors U. of Leuven EGSE Software Support
DIAS Filters
ATC Principal Investigator Optical Engineering Spectrometer Pre-Optics (SPO) Calibration Sources Astrium Ltd. Consortium Management PA Coordination System Engineering U. of Leicester Mechanical Engineering Primary Structure MGSE RAL Thermal Engineering & Hardware Optical Bench Assembly AIV
MPIA Heidelberg Electrical Engineering Cryo Mechanisms U. of Köln Low Resolution Spectrometer Double Prism
ASTRON Spectrometer Main Optics (SMO)
U. Leiden Spectroscopy Analysis
U. of Stockholm Filters and Gratings
![Page 25: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/25.jpg)
MIRI Coming Out of CryoVac Testing in 2011 86 days of 24/7 cold testing at RAL at 6.5 K
51 scientists and engineers from European Consortium, STScI, JPL and GSFC provided 6,000 staff hours of shift support
2,465 test scripts run successfully 6.5 TB of data
25
![Page 26: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/26.jpg)
Flood Illuminated Images Show Near-Perfect Optical Alignment
F560W MRS Longwave MRS Shortwave
![Page 27: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/27.jpg)
MIRI - First Flight Instrument Delivered - May 29th 2012
![Page 28: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/28.jpg)
Instruments will be Integrated into this Flight Structure Starting Next Week
![Page 29: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/29.jpg)
ISIM Structure Mounted for Ambient Strength Proof Test
![Page 30: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/30.jpg)
OSIM Cryo-Vac Test ● Testing the instruments requires an Optical SIMulator (OSIM) ● OSIM itself is a complicated instrument and has to be checked out
cold and in-vacuum ● Cryotesting at GSFC about to resume.
Beam Image Analyzer in the 30K section (top) OSIM in the 100K section (bottom)
![Page 31: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/31.jpg)
OSIM Lift into the SES (Space Environment Simulator)
![Page 32: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/32.jpg)
ISIM CryoVac Testing
SES chamber (27 x 40 ft)
LN2 Shroud
LHe shroud
ISIM
OSIM
Vibration Isolation Supports
OSIM Primary Mirror Alignment Diagnostic
Module
Fold Mirror 3 Tip/Tilt
Gimbal Assembly
LHe shroud
![Page 33: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/33.jpg)
Outline
Introduction & overview
Status – the ‘bits’
Launch and deployment Observations from an Oldie
![Page 34: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/34.jpg)
Launch and deployment videos can be found on the JWST website at: www.jwst.nasa.gov
![Page 35: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/35.jpg)
Outline
Introduction & overview
Status – the ‘bits’
Launch and deployment
Observations from an Oldie
![Page 36: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/36.jpg)
Some Observations Based on 30 Years ‘In Space’ - 1
It’s a great career! – spacecraft, rockets, international collaboration, the physics of the universe – and they pay you to do it – and it’s fun!
A constant learning experience – you can never know all there is to know about the subject
There is no need for Europeans to be over-awed by NASA
JWST could well be the last of the really big observatories for a very long time…
…but more, smaller, faster missions offer lots of opportunities
The UK is in a great position after the Council of Ministers meeting thanks to a lot of preparation work by many in government, industry and academia
This requires mind-set changes, particularly in ESA, to get more bang for the buck (another long story).
![Page 37: MIRI & the James Webb Space Telescope](https://reader033.fdocuments.in/reader033/viewer/2022052210/5551205bb4c905f10b8b5529/html5/thumbnails/37.jpg)
Some Observations Based on 30 Years ‘In Space’ - 2
Especially in the multi-national context, you would do well to remember Mart’s 3 laws of space engineering (Charles Martin was an old-school chief designer and space enthusiast) Politics first Finance second Engineering third
Finally, at a personal level: Your career path is in your own hands, do not trust others to
arrange it for you or assume they will do it Always be prepared to seize an opportunity so keep your eyes
and ears open Don’t be afraid of decisions – you will never have all the
information you need to make the ideal one Finally, to quote Bill Boeing, this is not a bad mantra: ‘Act, move forward, get things done’.