webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor •...

40

Transcript of webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor •...

Page 1: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 2: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 3: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 4: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 5: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 1 of 18

Agenda for 8th Meeting of Northern Region Constituents regarding Connectivity/Long Term Access to Generation projects in NR

A. New/ Already discussed Connectivity & LTA Applications received by POWERGRID

Following Connectivity and Long term Access (LTA) applications for new generation projects in NR are proposed to be discussed. In addition, there are certain modifications of already granted Long term Access. The list of the projects to be discussed is given below:

Table-1.0

Sl. No Applicant Time frame Location IC (MW)

Connectivity Sought (MW)

LTA Sought (MW)

1 Nuclear power Corporation of India Ltd.

Aug’2020 Fatehabad (Haryana)

1400 1400 1400

2 Noida Power Company Ltd. April’2014 Greater Noida,

U.P - 500 500

3 Jaiprakash Power Ventures Ltd. Aug’2015 Himachal Pradesh

1000 - 264

4 Lucknow Solar Power Development Corporation Ltd.

Mar’2017 Lucknow 270 270 270

5

Essel Saurya Urja Company of Rajasthan Ltd.

July’2017 Rajasthan 750 750 750

Adani Renewable Energy Park Rajasthan Ltd.

Dec’2016 Rajasthan 250 250 250

Adani Green Energy Ltd. Dec’2016 Rajasthan 250 250 250

Saurya Urja Company of Rajasthan Ltd. (Two Applications)

Jan’2017 Rajasthan - 250+250 250+250

Saurya Urja Company of Rajasthan Ltd.

Dec’2016 Jaisalmer, Rajasthan

1000 1000 -

Saurya Urja Company of Rajasthan Ltd.

Dec’2016 Jodhpur,

Rajasthan 1000 1000 -

6 NSL Tidong Power Generation Pvt. Ltd.

Jun’2016 Himachal Pradesh

- - 88

7 NHPC Ltd.(Kishenganga HEP) Sep’2016 J&K 330 330 330

8 Aditya Birla Nuvo Ltd. Oct’2016 Sikar, Rajasthan 150 150 -

9 Indian Oil Corporation Ltd. (Mathura Refinery)

July’2018 Mathura, U.P - 100 -

10 NTPC Ltd. (Bilhaur STPP) Dec’2017 Bilhaur, U.P 1320 1320 -

11 SJVNL Ltd. (Dhaulasidh HEP) Jan’2018 Hamirpur, H.P 66 66 -

12 Connectivity & Long Term Applications held up seeking directions from CERC

13 Uttrakhand Connectivity/LTA Applications

14 Inter – Regional LTA Applications to NR

Page 6: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 2 of 18

Details of the applications are given below:

1.0 Connectivity & LTA to GHAVP Nuclear power plant (2X700MW) of M/s NPCIL in Haryana

The connectivity & LTA application from NPCIL was discussed during the 7th Meeting

of Northern Region Constituents regarding Connectivity/Long Term applications.

According to the application, the connectivity as well as Long Term Access for 1400

MW is from upcoming Nuclear power generator (2X700MW) of M/s NPCIL for

Gorakhpur Haryana Anu Vidyut Pariyojna (GHAVP) located at Fatehabad, Haryana.

As per the application, the Connectivity was sought w.e.f. Sep.’2020 with target

Beneficiaries as Northern region.

Following Transmission System for Connectivity & LTA was proposed during the 7th

meeting of Connectivity & LTA applications in NR:

Proposal: GHAVP Nuclear plant (2X700MW) of M/s NPCIL is in proximity of Fatehbad 400/220

kV substation of POWERGRID. Hence, connectivity can be granted at Fatehbad.

Presently, Fatehbad 400/220 kV S/s is connected with LILO of one circuit of Moga-Hissar

400 kV D/c line. LILO of Moga-Bhiwadi 400 kV D/c line at Hissar is under implementation

and therefore another 400 kV D/c line would be available between Moga & Hissar.

System studies have been carried out for 2020 time frame with the proposal as given

below:

Sl. No. Case Exhibit No.

1 Without considering NPCIL Generation I

2 With NPCIL generation II

3 With Outage of NPCIL-Hissar 400 kV S/c III

4 With Outage of Khedar-Kirori 400 kV S/c Line IV

5 With Outage of both circuits of Khedar-Kirori 400 kV D/c line V

From the studies it has been seen that all line loadings are well within limits under normal

as well as contingency situations.

Therefore, following transmission system was proposed for connectivity as well as for

evacuation of power from NPCIL generation:

Proposal for Connectivity:

� Fatehbad - NPCIL generation 400 kV D/c line

Proposal for Long Term Access:

� LILO of second circuit of Moga-Hisar 400 kV D/c line at Fatehbad

� LILO of both circuits of Moga-Hisar 400 kV D/c line at NPCIL generation switchyard

Hence, Connectivity & Long Term Access was proposed to be granted with the above

mentioned Transmission system.

Page 7: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 3 of 18

The Connectivity and LTA studies for the subject scheme came up for discussion in

the 36th SCM of Northern region Transmission Planning held on 13/07/2015. HVPNL

indicated that NPCIL had acquired land for 4*700 MW, whereas LTA & Connectivity

application was made for 2*700 MW. Thus the proposed scheme may need

changes considering the final capacity of 4*700 MW. Subsequently, CEA advised

that NPCIL and HVPNL to discuss and resolve the matter and confirm the capacity

for which the evacuation scheme is to be planned by CEA/CTU.

Accordingly, as indicated by NPCIL letter dated 12/01/2016, a meeting was

organised at HVPNL on 07/01/2016 to discuss the power evacuation and Start up

power (220 kV). HVPNL suggested that scheme should be planned for ultimate

capacity of 4*700MW. However, NPCIL desired considering the present financial

sanction for 2*700 MW, for which Connectivity and LTA applications have been

made, it prefers to retain the same applications, rather than making new applications

(4*700MW) for which no financial sanction is available.

Therefore, it has been proposed by NPCIL that power evacuation scheme for

GHAVP may be considered based on the earlier application (2*700MW). Therefore,

the LTA & Connectivity may be granted with above said Transmission system.

In addition to above mentioned system 125 MVAR bus reactor may be provided at

generation switchyard and switchgear equipment may be designed with 50 kA fault

level.

Members may deliberate.

2.0 Connectivity & Long Term Access to M/s Noida Power Company Ltd. for drawl

of 500 MW as a bulk consumer in Greater Noida area, Uttar Pradesh.

The issue of grant of Connectivity and LTA to Noida Power Company Ltd. (NPCL)

was discussed in various Standing Committee/LTA & connectivity meetings,

however, the same could not be resolved. During 34th SCM held on 08/08/14, it was

suggested that NPCL may approach CERC. Accordingly they had approached

CERC and CERC vide their order dated 16/09/2015 has directed to process the

applications. The detailed agenda for Connectivity & LTA to M/s NPCL was

circulated among all Northern region Constituents and following was proposed:

1) To grant LTA for drawl of 500MW power at G. Noida 765/400kV S/s of UPPTCL

through UPPTCL intra state system w.e.f. 1/10/2017 to 30/9/2042.

2) The already granted connectivity at 400/220 kV G. Noida (new) proposed under

ISTS, is proposed to be cancelled as M/s NPCL would be connected to UPPTCL

substations as mentioned in NoC and UP has stated that their system is capable to

supply 500 MW to NPCL. Further, the grant of Connectivity may be taken up by

UPPTCL.

3) The scheme NRSS XXXIII consisting of establishment of 2x500 MVA, 400/220kV

GIS substation at Greater Noida (New) along with Ballabhgarh – Greater Noida

Page 8: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 4 of 18

(New) 400 kV D/c line as agreed in the 31st Standing Committee Meeting on

02/01/2013 may be dropped.

The detailed agenda for the same is attached at Annexure-I for reference.

Members may discuss

3.0 Long Term Access for 264 MW to M/s Jaiprakash Power Ventures Ltd. for

Karcham Wangtoo Hydro Electric Plant in Himachal Pradesh.

LTA was earlier granted for 704 MW for Karcham Wangtoo generation project with

target regions as NR (440 MW), WR (176 MW) and SR (88 MW).

However, JPVL vide its letter dated 31.03.2014 and note submitted on 01.04.2015

has requested POWERGRID to reinstate the earlier granted LTA to Northern Region

beneficiaries for 704 MW instead of NR, WR and SR.

The matter was discussed during the 7th NR LTA/Connectivity meeting, CEA

suggested Jaiprakash Power Ventures Ltd. to apply with a new LTA application as

the change in LTA Quantum is more than 100 MW.

Subsequently, a fresh LTA application has been received from Jaiprakash Power

Ventures Ltd. in Aug’2015 for transfer of 264 MW of power from Karcham Wangtoo

generating plant to Northern region beneficiaries. As per the application, the LTA is

sought from Aug’2015 for 25 years.

For the revised grant of power transfer to NR, no augmentation / system

strengthening was identified as it was granted through the existing system only,

therefore, the above said LTA may be granted subject to the fulfillment of regulatory

provisions.

It has been seen that power transfer from Karcham Wangtoo plant to Northern

region beneficiaries shall enable availability of more power in Northern region.

Members may discuss

4.0 Connectivity & Long Term Access to M/s Lucknow Solar Power Development

Corporation Ltd. for 270 MW from Jalaun Solar Park in Uttar Pradesh.

In the 36th meeting of the Standing Committee of NR held on 13.07.15, following

transmission system for Solar Power Park in Jalaun, UP (370 MW) was agreed for

development as ISTS :

• Jalaun Pool - Kanpur (New) 400kV D/c line

• Establishment of 400kV Pooling station at Jalaun (400/220KV, 2x500MVA or

400/132kV, 3x200MVA) along with 1x125MVAr bus reactor

• Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with

solar park)

It was also decided that implementation of above transmission scheme shall be

taken up only after receipt of application from Solar park developer for LTA of at

least 25% of their installed capacity.

Page 9: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 5 of 18

Subsequently, M/s Lucknow Solar Power Development Corporation Ltd. (LSPDCL),

a JVC of UP New & Renewable Energy Development Agency (UPNEDA) and Solar

Energy Corporation of India (SECI), submitted the application for LTA & Connectivity

in ISTS for revised capacity (270 MW) of Jalaun Solar Power Park with NR as target

beneficiary region. As per the application, the LTA & Connectivity are sought from

Dec’2016 for 25 years, which was further revised as Mar’17.

MNRE has authorized above applicant as solar power park developer (SPPD) who

shall undertake infrastructural activities including arrangement for connectivity on

behalf of the solar power generators in the park.

Based on the revised Solar generation capacity (270 MW) of Jalaun SPP, earlier

agreed scheme was reviewed. In this regard, joint studies between POWER GRID

and UPPTCL were carried out wherein 220kV as well as 400 kV alternatives along

with availability of approved generation and associated transmission system of UP in

various scenarios were studied. Study Results for the same has been discussed &

enclosed with 37th Standing Committee Agenda of NR. Based on the studies &

discussion, following transmission scheme (ISTS) is proposed:

� LILO of one circuit of 400kV Orai(UP)- Mainpuri (UP) 400kV D/c line at Jalaun

Pooling station

� Establishment of 400/132kV, 3x200 MVA Pooling station at Jalaun along with

1x125MVAr bus reactor

� 132kV Line bays at Jalaun Pooling station (for its interconnection with solar park

system)

However 132kV interconnection from SPPD 132kV S/s to Jalaun Pooling station

(ISTS) shall be established by the SPPD itself.

Hence, Connectivity & Long Term Access is proposed to be granted to the above

applicant with the above mentioned transmission system.

Members may deliberate.

5.0 Connectivity & Long Term Access applications M/s Saurya Urja Company of

Rajasthan Ltd., M/s Essel Saurya Urja Company of Rajasthan Ltd. & Adani

Renewable Energy park Rajasthan Ltd. for Ultra Mega Solar Parks in Bhadla,

Distt. Rajasthan.

In the 36th Meeting of Standing Committee on Power System Planning in Northern Region held on 13.07.2015, inter-state transmission scheme for evacuation of 3000MW of solar power in Jodhpur (Bhadla :1000MW) and Jaisalmer (Parewar and Fatehgarh : 2000 MW) was in-principally agreed :

• 765kV Parewar – Bhadla(PG) D/C (initially to be charged at 400kV)

• 765kV Fatehgarh – Bhadla(PG) D/C (initially to be charged at 400kV)

• 765kV Bhadla (PG) – Bikaner(PG) D/C

• 400kV Bhadla (PG)- Bhadla (RVPN) D/C (Quad)

Page 10: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 6 of 18

• Establishment of 3x500MVA, 400/220kV Pooling Station at Parewar (with a

provision to upgrade at 765kV level)

• Establishment of 3x500MVA, 400/220kV Pooling Station at Fatehgarh (with a

provision to upgrade at 765kV level)

• Establishment of Pooling Station at Bhadla (PG) (765/400kV : 3x1500MVA &

400/220kV : 3x500MVA,)

• 220kV line bays at Parewar, Fatehgarh & Bhadla (PG) for interconnection of

solar plants

• Associated reactive compensation (both bus & line reactor)

It was also agreed that implementation of above system shall be taken up only after receipt of LTA of at least 25% of their installed capacity from respective Solar park developers.

Subsequently following applicants applied as solar power park developer for

connectivity & Long Term Access in ISTS at Bhadla (Jodhpur). The details of solar

parks as per the applications is as under:

S.No Name of

applicant

location Connectivity

(MW)

LTA (MW) Commissioning

schedule as per

LTA application

LTA Sought

for

1 M/s Saurya

Urja

Company of

Rajasthan

Ltd.

Bhadla/

Tehsil

Bap &

Phalodi

500MW 500MW

(2 applications

of 250MW)

1st Jan 2017 25 years

2 M/s Adani

Renewable

Energy Park

Rajasthan

Ltd

Bhadla 250MW 250MW 31st Mar 2017

25 years

3 M/s Essel

Saurya

Company of

Rajasthan

Ltd

Phalodi &

Pokaran

750MW

(Phalodi -

400MW

Pokaran-

350MW)

750MW

(Phalodi -

400MW

Pokaran-

350MW)

1st Jul 2017 25 years

As per the LTA application, M/s Saurya (S.No 1) & M/s Adani (Sl.No 2) indicated

target beneficiary as Northern region while M/s Essel (Sl. No. 3) indicated target

beneficiary as NR-400 MW and WR-350 MW.

MNRE has authorized all the above applicants as solar power park developers

(SPPD) who shall undertake infrastructural activities including arrangement for

connectivity on behalf of the solar power generators in the park.

Page 11: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 7 of 18

M/s Adani (250 MW) and M/s Saurya Urja Co. Ltd. (500 MW) desired connectivity at

220kV voltage level whereas M/s Essel (750 MW) desired connectivity at 400kV

voltage level. Necessary 220kV & 400kV interconnection line from Solar Power

Parks upto 220/400/765kV Bhadla Pooling station (ISTS) shall be developed by the

respective applicants/SPPD as part of its internal transmission infrastructure.

However, scope of 4 nos. 220kV line bays and 2 nos. 400kV line bays at 220/400kV

Bhadla Pooling station for interconnecting SPPD’s 220kV /400kV lines is kept under

the present scope of the proposed scheme (2 nos. each for M/s Saurya Urja & Adani

Renewable and 2 nos. 400kV for M/s Essel).

Considering the above three (3) LTA applications for total 1500 MW Power transfer

requirement from Bhadla Solar Complex, following transmission scheme is

proposed, out of earlier agreed transmission scheme in 36th standing committee:

� 765kV Bhadla (PG) – Bikaner (PG) D/C

� 400kV Bhadla (PG) - Bhadla (RVPN) D/C (Quad)

� Establishment of Pooling Station at Bhadla (PG) (765/400kV: 3x1500MVA

400/220kV: 3x500MVA)

� 2 nos. 400kV & 4 nos. 220kV line bays at Bhadla (PG) for interconnection of

solar park interconnection

� 1x240 MVAr switchable line reactor at each end of 765kV Bhadla(PG)-

Bikaner(PG) D/c line

� 1x240 MVAr (765kV) & 1x125 MVAr (400kV) Bus reactors at Bhadla Pooling

Station

Hence, Connectivity & Long Term Access is proposed to be granted to the above

applicants with the above mentioned transmission system.

Connectivity Applications:

In the 7th Meeting of Northern Region Constituents regarding Connectivity/Long

Term applications held on 14.07.2015, Connectivity applications from M/s Saurya

Urja Company of Rajasthan Ltd. for Solar power projects of 1000MW capacity each

at Bhadla & Parewar (Jaisalmer) in Rajasthan were deliberated. However

confirmation of RVPN regarding Connectivity points, space availability for 220 kV &

400 kV bays etc. could not be discussed. However, following was observed while

processing the Connectivity applications of M/s Saurya Urja Company of Rajasthan

Ltd.:

− M/s Saurya applied for Connectivity of 1000 MW capacity each at Bhadla &

Jaisalmer (Parewar)

− M/s Saurya vide letter dated. 23.06.15 informed that they have received

authorization from MNRE to apply for Connectivity/LTA in ISTS for both Bhadla

Phase-III (1000 MW) as well as Jaisalmer Phase-I solar projects (1000 MW)

therefore their applicant category may be considered as Solar Power Park

Developer (SPPD) in place of generator for above applications

Page 12: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 8 of 18

− Subsequently, M/s Saurya also applied for Connectivity & Long Term Access in

ISTS for 500 MW at Bhadla (Jodhpur). However authorization from MNRE to

above developer is given under Bhadla Phase-III (1000 MW) capacity only.

− Further, as per the discussion with Rajasthan/RRVPN, it was informed that M/s

Saurya is already given connectivity/LTA for its Bhadla Solar project (1000 MW)

by RVPN for 500 MW

− In effect, M/s Saurya Urja applied for Connectivity of 1500 MW from its Bhadla

Solar Project and SPPD authorization from MNRE is available for 1000 MW at

Bhadla out of which 500 MW is granted by RRVPN, as informed

− In addition, MNRE vide letter dated 17.12.15 intimated about cancellation of

Jaisalmer Ph-I solar Park (1000 MW) to be set up by M/s Saurya Urja at Parewar,

Joga & Kachuri villages of Jaisalmer.

− As the earlier Connectivity applications at Bhadla (1000 MW) & Parewar,

Jaisalmer (1000 MW) are pending with CTU, M/s Saurya may clarify about the

present status of 1000MW project each at Bhadla & Parewar (Jaisalmer) and their

connectivity applications in above context.

Regarding Connectivity application of M/s Adani Green Energy Pvt. Ltd., following

was observed:

− M/s Adani Green Energy Ltd. Had earlier applied for grant of Connectivity for 250

MW in the “Generator” category at Bhadla, Rajasthan. Also, M/s Adani Renewable

Energy Park Raj Ltd. has applied for Connectivity for 250 MW at Bhadla as

“SPPD”. All other application details including location of the project are same as

given in the application by M/s Adani Green Energy Ltd.. M/s Adani Green Energy

Ltd. may clarify about their Connectivity application.

Members may deliberate.

6.0 Long Term Access to NSL Tidong Power Generation Pvt. Ltd. for 88 MW of

Tidong HEP in Himachal Pradesh.

Long Term Application from M/s NSL Tidong Power Generation Pvt. Ltd. for 88 MW

from Tidong HEP located in Himachal Pradesh for transfer of power to Southern

region was discussed during the 7th Meeting of Northern Region Constituents

regarding Connectivity/Long Term applications. The transmission system discussed

& agreed for Interim as well as final arrangement for evacuation of power through

Tidong-I HEP is as below:

Interim Arrangement:

� LILO of one circuit of 220 kV D/C Kashang- Bhaba line at Tidong-I HEP

Final Arrangement:

� 2x315 MVA (7x105 MVA units) 220/400 kV GIS Pooling Station at Jangi (with

4000 Amps. switchgear) (with space provision for 3rd ICT)

� Tidong – Jangi Pooling Station 220 kV D/c line

Page 13: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 9 of 18

Further, it was deliberated during the above mentioned meeting that as the, power

transfer requirement is from Northern region to Southern region and the processing

of pending LTA applications since Nov’2013 for power transfer to Southern region

were held on litigation and now they are gradually being processed as per the priority

and availability of ATC.

Therefore, the above proposal for grant of LTA has also been discussed in

Connectivity/LTA meeting of Southern region constituents held on 29/12/2015 for

their concurrence and further after deliberations following was agreed:

LTA to NSL Tidong Power generation Private Limited may be granted subject to

commissioning of following:

� Angul-Srikakulam-Vemagiri 765kV D/c line along with “Constraints in 400kV

bay extensions at Vemagiri” (Including rearrangement of Vemagiri(PG)-

Vemagiri(AP) line).

� Wardha - Maheshwaram 765kV D/c link with anchoring at Nizamabad along

with “Connectivity lines associated with Maheshwaram substation”.

It has been requested by M/s NSL Tidong Power generation Pvt. Ltd. vide letter

dated 05/01/2016 from, that start date of LTA may be considered as 1st July, 2017 or

the readiness of POWERGRID corridor whichever is earlier. However, LTA can be

granted from July’2017 or commissioning of the above mentioned transmission

system whichever is later.

Members may discuss.

7.0 Connectivity & LTA to NHPC Ltd. for Kishenganga HEP for transfer of 330 MW

of power.

The Connectivity & LTA application was agreed & discussed during the 7th Meeting

of Northern Region Constituents regarding Connectivity/Long Term applications with

the following Transmission system:

o Kishenganga – Amargarh 220 kV D/c

o Kishenganga – Wagoora 220 kV D/c

As per the application, the beneficiaries are Punjab, Haryana, Delhi, Rajasthan, J&K,

Uttranchal & Chandigarh.

However, final allocation from Ministry of Power for the generation project has not

been confirmed by NHPC who as an applicant has applied for Connectivity as well

LTA as per CERC regulations, 2009 to fulfill the regulatory requirements. In this

regard NHPC need to submit the power allocation from Govt of India so as the

intimation of Connectivity & LTA can be issued.

Members may discuss

Page 14: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 10 of 18

8.0 Connectivity to M/s Aditya Birla Nuvo Ltd. for 150 MW for Solar generating

plant in Rajasthan.

Connectivity application has been received in September’2015 from M/s Aditya Birla

Nuvo Ltd. for 150 MW quantum of power from Solar generating plant Project located

in Sikar, Rajasthan. As per the application, Connectivity has been sought from

Oct’2016.

As per the application, the nearest ISTS point is Sikar (POWERGRID) 400/220 kV

substation which is about 30 km from the generating plant. However, due to non-

availability of space for 220 kV bays at Sikar 400/200 kV (PG) substation, the same

cannot be given. The other option for providing connectivity is through LILO of one

circuit of Sikar (PG)-Sikar (RVPNL) 220 kV D/c at the Solar generating station.

RVPNL may provide their consent for the same.

Taking into consideration very early commissioning schedule of the solar plant ie.

Oct’2016 (as per the application) the construction of dedicated line may be taken up

by the applicant itself.

Subsequently, it is to mention that mere connectivity does not full fills the condition of

adequacy of transmission system for transfer of power to target beneficiaries and the

grant of connectivity shall not entitle to interchange any power with the grid unless it

obtains Long-Term Access, Medium Term Open Access or Short Term Open

Access.

Transmission beyond immediate evacuation system is to be evolved once the

applicant applies for the LTA. Hence, applicant may apply for Long Term Access.

Members may deliberate.

9.0 Connectivity to M/s Indian Oil Corporation Limited for 100 MW as bulk

Consumer for their Mathura refinery.

Connectivity application dated 15/06/2015 received from Indian Oil Corporation

Limited as a bulk consumer for 100 MW quantum of Mathura refinery, Uttar Pradesh

was discussed during the 7th Meeting of Northern Region Constituents regarding

Connectivity/Long Term applications.

Connectivity to the applicant was agreed with the following Transmission system:

� 220 kV D/c line from Mathura Refinery to Prithala 400/220 kV S/s

However, following issues have been observed while processing the Connectivity

application:

1) Connectivity is being sought as a bulk consumer, however, IOCL plans to

connect the generator as it is mentioned in the application that captive power

plant is proposed to be kept floating with the grid in import mode for meeting bulk

power requirement and emergency backup situation.

Page 15: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 11 of 18

2) If the applicant is already connected to the grid then in order to avoid the loop

flows, the existing connectivity may have to be opened.

3) Applicant to indicate by what time the load expansion is expected and

connectivity line should be matched with that time frame.

4) As the applicant is applying as a bulk consumer, therefore, it may not be allowed

to inject into the grid.

It was agreed during the above mentioned meeting that Connectivity may be granted

to M/s IOCL and they may take up the issue with CERC for construction of the line.

However, to discuss the various issues regarding implementation of connectivity line,

based on the request of M/s IOCL, a meeting was held between CTU and M/s IOCL

on 27/08/2015 in M/s IOCL has expressed its desire to connect to STU network for

which STU consent is required. No further communication has been received from

IOCL in this regard.

In view of this, the grant of connectivity to M/s IOCL for 100 MW as a Bulk Consumer

shall be granted based on the feedback from IOCL. IOCL may please update the

same.

Members may discuss

10.0 Connectivity to Bilhaur STPP (2X660MW) of M/s NTPC Limited in Uttar Pradesh

Connectivity application for 1320 MW from coal based Bilhaur STPP (2X660MW)

generation of M/s NTPC Limited was discussed in 7th Meeting of Northern Region

Constituents regarding Connectivity/Long Term applications on 14/07/2015 with the

following Transmission system:

� Bilhaur- Kanpur(New) 400 kV (Quad) D/c line

In addition to above mentioned system 125 MVAR bus reactor may be provided at

generation switchyard and switchgear equipment may be designed with 50 kA fault

level.

As per the application, Connectivity was sought w.e.f. Dec. 2017 for drawl of startup

power and commissioning requirement.

It was mentioned in the earlier meeting that mere connectivity does not full fill the

condition of adequacy of transmission system for transfer of power to target

beneficiaries and the grant of connectivity shall not entitle to interchange any power

with the grid unless it obtains Long-Term Access, Medium Term Open Access or

Short Term Open Access. Transmission beyond immediate evacuation system is to

be evolved once the applicant applies for the LTA. Hence, NTPC was asked to apply

for LTA.

NTPC assured that they would submit the LTA application within 1 month, however,

the same has not received till yet.

Members may discuss.

Page 16: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 12 of 18

11.0 Connectivity to Dhaulasidh Hydro Electric Power Project (66MW) of M/s SJVN

Limited in Himachal Pradesh.

The connectivity application from M/s SJVN Ltd. for 66 MW (Plus 10% inbuilt

overload capability to meet grid requirement) was discussed during the 7th Meeting

of Northern Region Constituents regarding Connectivity/Long Term applications.

However, the LTA application is yet to be received.

It was deliberated in the last meeting that as per the connectivity application, the

nearest substation for connectivity are 220/132kV Mattansidh(HPSEB)

Substation(20.30km), 132/33kV Dehra(HPSEB) substation(22.81km) & 400/220kV

Hamirpur (POWER GRID) substation (40km). As the generation step up voltage as

informed by the applicant is 132kV and there is no ISTS substation in the vicinity, the

connectivity need to be provided at STU substation.

As the representative from HPPTCL or HPSEBL was not present in the meeting,

therefore, a separate meeting for discussing the issues regarding grant of

Connectivity to Dhaulasidh HEP was held on 24/08/2015 among members from

CEA, POWERGRID, HPSEB, HPPTCL & SJVNL. In the meeting, following options

were discussed for providing Connectivity to Dhaulasidh HEP:

1) SJVNL may construct a 132 kV D/c line upto the newly proposed HPSEBL/HPPTCL

132/33 kV Nadaun substation along with the construction of requisite 132 kV bays on

both ends. However, cost of construction of Nadaun substation along with LILO of

both circuits of Dehra- Mattansidh 132 kV D/c line at this substation may be built by

HPSEBL/HPPTCL as an intra-state transmission works.

2) SJVNL may construct the LILO of both circuits of Dehra-Mattansidh 132 kV D/c line

at their generation switchyard.

3) SJVNL may construct a 132 kV D/c line from Dhaulasidh generation switchyard to

Mattansidh 220/132 kV substation of HPSEBL.

A meeting regarding this issue among HPSEBL/HPPTCL & SJVNL was held on

09/09/15 and further, SJVNL vide letter dated 08/10/2015 has informed that

considering techno-economic reasons, the Connectivity of Dhaulasidh generation

plant may be granted through 220 kV D/c line from Dhaulasidh HEP to 400/220 kV

S/s at Hamirpur (PG).

It may be mentioned here that the connectivity line shall have to be constructed by

SJVNL including bays at both ends, in line with CERC regulations.

Members may discuss.

12.0 Pending Connectivity & Long Term Applications pertaining to Northern region

It is to inform that there are many Long Term Access applications where LTA could

not be granted as the LTA applicants have sought repeated extensions in grant of

Long Term access by requesting to keep their applications ‘in abeyance’. Similarly,

some applications could not be granted LTA as the regional constituents opined and

informed about the lack of progress of generation plant.

Page 17: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 13 of 18

As discussed in the earlier LTA/Connectivity meetings among all Northern region

Constituents, these “Held-Up” LTA applications have outlived their utility and that

they ought to be closed. However, in the absence of any provision in the

Regulations/Detailed Procedure for treatment of application Bank Guarantee

submitted along with these LTA applications, CTU had sought the

directions/guidelines of the Hon’ble Commission to be issued for the treatment of

such Bank Guarantees.

Therefore, the treatment of the applications/Bank Guarantee shall be as per the

directions/guidelines of the Hon’ble Commission. The list of such LTA/Connectivity

applications is as below:

Following LTA applications are pending for directions/guidelines from CERC due to

non-signing of LTA agreement:

Sl.

No

Applicant Time frame Location IC Connectivity Sought (MW)

LTA Sought (MW)

1 Himachal Pradesh Power Corporation Limited (Sainj HEP)

April’2014 Himachal Pradesh

100 100 100

2 Himachal Pradesh Power Corporation Limited (Sawra Kuddu)

Dec’2012 Himachal Pradesh

111 111 111

13.0 LTA/Connectivity to hydro projects in Uttarakhand

Various hydro projects being developed in Uttarakhand were discussed during the

7th Meeting of Northern Region Constituents regarding Connectivity/Long Term

applications held on 14.07.2015. The detail is given below:

Sl. No Applicant Time frame Location IC (MW)

Connectivity Sought (MW)

LTA Sought (MW)

1 Jaiprakash Associates Ltd. (Roorkee Unit)

April’2017 Uttrakhand 120 - 10

2 Jaiprakash Associates Ltd. (Panipat Unit)

April’2017 Uttrakhand 120 - 10

3 Gama Infraprop (P) Ltd. Oct’2011 Uttrakhand 225 - 50

4 NTPC Ltd. (Gidderbaha STPP) Deferred Punjab 2640 2640 2617.74

5 Miyar HEP Company Ltd. July’2017 Himachal Pradesh

120 120 120

6 SELI HEP Company Ltd. Oct’2017 Himachal Pradesh

400 400 400

7 M/s NHPC Ltd. (Kotlibehl HEP) 2016-17 Uttrakhand 215 215 (10% overload capacity)

215 (10% overload capacity)

Page 18: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 14 of 18

A) Projects for which LTA is granted beyond Kashipur: Tapovan Vishnugarh

HEP(520MW), Alaknanda HEP (300 MW) & Phatabyung HEP (76 MW)

It was deliberated in the last LTA/Connectivity meeting that Connectivity to these

projects was agreed by PTCUL and LTA granted by CTU beyond Kashipur. Now as

the system is being developed as deemed ISTS, these generators need to apply

fresh for connectivity to CTU, which would be granted by CTU. Phatabyung HEP &

Alaknanda HEP have signed LTAA, however based on revised connectivity

application, the injection point for LTA would also get changed to deemed ISTS

network and the already signed agreement would also have to be revised. After

grant of connectivity and LTA, PTCUL would require to sign Implementation

Agreement with the generators in line with CERC Regulations.

i. Connectivity to Tapovan Vishnugarh Hydro project (520 MW) of M/s NTPC Ltd.

in Uttarakhand.

Connectivity application has been received in October’2015 from NTPC Ltd. for 520

MW quantum of Tapovan Vishnugarh Hydro Project located in Uttarakhand. As per

the application Connectivity has been sought from Sep’2018. The commissioning

schedule of the first unit is 1st September’2018. The associated composite

transmission system for various hydro projects in Uttarakhand including Tapovan

Vishnugarh HEP was revised in the 35th Standing Committee meeting of

transmission planning of NR held on 3/11/14. The proposed transmission system is

given below:

� Establishment of 400/220 kV, 2X315MVA Pipalkoti (GIS) substation

� Tapovan Vishnugad HEP– Pipalkoti (THDC) S/s 400kV D/c (Twin Moose) line

� LILO of one circuit of Vishnu Prayag-Muzaffarnagar 400 kV line at Pipalkoti

400/220 kV substation

� Pipalkoti-Srinagar 400 kV D/c (Quad)

� Srinagar-Kashipur 400 kV D/c (Quad)

� 8 Nos. 400kV line bays in Pipalkoti substation.

It is to mention here that Long Term Open Access has already been granted to M/s

NTPC Ltd. for generation plant beyond Kashipur. However, as per the minutes of 7th

LTA/Connectivity meeting of Northern region held on 14/07/2015, PTCUL shall sign

the implementation agreement with the generator as per the CERC guidelines.

Connectivity for the same may be granted.

ii. Connectivity for 259MW to Alaknanda HEP (300MW) of M/s GMR (Badrinath) Hydro Power Generation Pvt. Ltd in Uttarakhand.

M/s GMR (Badrinath) Hydro Power Generation Pvt. Ltd had been granted Long term

Access, for transfer of 259 MW power from Alaknanda HEP (300MW) in

Uttarakhand. In the last LTA/Connectivity meeting, M/s GMR (Badrinath) Hydro

Power Generation Pvt. Ltd had informed that their generation activities are on hold

due to the case pending in Supreme Court and the revised commissioning schedule

shall be March’2021, subject to Supreme Court Order.

Page 19: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 15 of 18

Regarding connectivity, applicant had agreed to submit a fresh application for

Connectivity to CTU. Further, it was decided that revised LTA intimation shall be

issued after receipt of connectivity application and grant of connectivity.

Subsequently applicant would need to sign requisite addendum to earlier signed LTA

agreement. It was also informed that for implementation of associated transmission

system, applicant needs to sign implementation agreement with PTCUL.

Applicant to update the status.

Members may discuss.

iii. Connectivity to Phata Byung Hydro project (76 MW) of M/s Lanco Mandakini Hydro Energy Pvt. Ltd. in Uttarakhand.

In the last meeting it was discussed that the generator i.e. M/s Lanco Pvt Ltd. shall

apply for Connectivity to CTU with the revised commissioning schedule and revised

LTA intimation shall be issued after receipt of connectivity application and grant of

connectivity. Further addendum to earlier BPTA agreement also needs to be signed.

Connectivity application has been received in Aug’2015 from M/s Lanco Mandakini

Hydro Energy Pvt. Ltd. for transfer of 76 MW power from Phata Byung Hydro

Project. As per the application, Connectivity has been sought from Sep’2017. The

composite associated transmission system for various hydro projects in Uttarakhand

including Phata Byung HEP has been developed by PTCUL under which, Phata

Byung HEP is connected through:

� LILO of one circuit of Rambara- Baramwari 220kV line at the generation

switchyard

It is to mention here that Long Term Open Access has already been granted beyond

Kashipur. However, as per the minutes of 7th LTA/Connectivity meeting of Northern

region held on 14/07/2015, PTCUL shall sign the implementation agreement with the

generator as per the CERC guidelines.

Members may discuss.

B) Projects for which Connectivity/ LTA applied to CTU

iv. Connectivity to Pipalkoti Hydro project (444 MW) of M/s THDC India Ltd. in Uttarakhand. Connectivity application was received in July’2014 from THDC India Ltd. for Pipalkoti

Hydroelectric Project (4X111MW) located in Uttarakhand. As per the application,

connectivity has been sought from Apr.’2018.

The associated composite transmission system for various hydro projects in

Uttarakhand including Vishnugarh Pipalkoti HEP was revised in the 35th Standing

Committee meeting of Power System Planning of NR held on 3/11/14. The agreed

transmission system is given below:

Page 20: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 16 of 18

� Establishment of 400/220 kV, 2X315MVA Pipalkoti (THDC) substation

� Tapovan Vishnugad HEP– Pipalkoti (THDC) S/s 400kV D/c (Twin Moose) line

� Pipalkoti HEP-Pipalkoti (THDC) S/s 400 kV D/c (twin moose) line

� LILO of one circuit of 400kV Vishnuprayag-Muzaffarnagar line at Pipalkoti

(THDC) substation

� Pipalkoti-Srinagar 400 kV D/c Quad line

� Srinagar-Kashipur 400 kV D/c (Quad) line

� 8 Nos. 400kV line bays in Pipalkoti substation.

It is proposed that connectivity to Pipalkoti Hydro project (444 MW) of M/s THDC

India Ltd. may be granted to M/s THDC India Ltd. with the above composite system.

However, PTCUL shall sign the implementation agreement with the generator as per

the CERC guidelines.

Note: It may be mentioned that since integrated transmission system has been

evolved for Tapovan Vishnugarh, Akalnanda & Pipalkoti hydro projects, therefore,

the Connectivity & LTA shall be granted for each project based on the

commissioning schedule. The integrated transmission system is to be developed in a

phased manner depending on the commissioning schedule of the generation

projects.

Members may discuss.

C) Other Projects: It was deliberated in the 7th LTA/Connectivity meeting held on

14/07/2015 that there are certain other projects who had applied connectivity to

PTCUL, however they had not applied for LTA to CTU. In addition some of the

generation developers have neither applied for connectivity nor LTA. PTCUL may

impress upon those generators to apply for connectivity and LTA to CTU.

Members may discuss

14.0 Inter – Regional LTA Applications to NR

Based on LTA applications and Central Sector allocations, total power transfer

requirement towards NR comes out to about 26000MW. If certain

uncertain/abandoned/closed applications are not considered, power transfer

requirement reduces to about 23500 MW. In addition to the import requirement of

NR assessed above, additional requirement of about 2500 MW power transfer to NR

is envisaged from following generation projects in WR (& SR):

Page 21: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 17 of 18

Sl No.

Generation Projects Region Additional Allocation to NR (MW)

1 KSK Mahanadi Power Company Ltd WR 1000 (Firm)

2 MB Power (MP) Ltd. WR 200 (169MW Firm)

3 MB Power (MP) Ltd. WR 144

4 Suzlon Power Infrastructure Ltd. (3 applications, location of project in SR)

SR 120

5 SEI Sunshine Power Pvt. Ltd. WR 180

6 Rewa Ultra Mega Solar Ltd. WR 300

7 DB Power Chhattisgarh Ltd. WR 75 (Firm)

8 Maruti Clean Coal & Power Ltd * WR 205 (Firm)

9 TRN Energy Ltd * WR 240 (Firm)

Grand Total 2464 MW

* TRN Energy and Maruti Clean Coal & Power Ltd. had submitted LTA applications against firm PPAs signed with beneficiaries in NR; however same were closed on account of incomplete applications. Above mentioned quantum of WR – NR power transfer desired by TRN and DBPCL

and MCCPL has been considered in studies considering that they have firm PPA as

they may apply afresh. In addition to above applications, LTA application of Barethi

STPS indicates about 871MW power allocation to Northern Region. Hence, the total

power transfer requirement to NR after considering above applications is likely to be

about 26500-27000 MW.

The above mentioned was discussed during the 22nd meeting of WR constituents

regarding Connectivity/Open Access held on 30.11.2015, wherein it was mentioned

that since generation projects in WR (particularly in Chhattisgarh) and in Odisha,

which have strong connectivity with WR (via Chhattisgarh), have materialised in

time, the WR – NR corridor gets stressed. After detailed deliberations, it was decided

during the meeting that the above mentioned applications (from Sl. No. 1 to 7) shall

be granted LTA to NR with the following inter-regional corridor:

New WR – NR Inter Regional Corridor

• Establishment of New 2x1500MVA, 765/400kV Substation at Allahabad

• Vindhyachal Pool – Allahabad (New) 765kV D/c line

• Allahabad (New) – Lukhnow 765kV D/c line

• LILO of Sasaram – Fatehpur 765kV S/c line at Allahabad (New)

• LILO of Meja – Allahabad 400kV D/c line at Allahabad (New)*

*Note: While carrying out the above studies it was observed that Allahabad –

Allahabad 400 kV D/c line becomes critically loaded. Accordingly in this case LILO of

Allahabad – Kanpur 400 kV D/c line at Allahabad (New) has been considered and

with this problem of critical loading of Allahabad – Allahabad (New) gets alleviated.

Page 22: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar

Agenda for 8th Meeting of Northern Region constituents regarding Connectivity/LTA Applications

Page 18 of 18

Considering the above, the studies have been carried out with a total import of about

27000 MW to Northern region. The results of the studies with and without additional

transmission system are enclosed at:

• Base Case (Without Additional Corridor) Exhibit - A

• Outage of Agra – Gwalior 765 kV S/c Exhibit –B

(Without Additional Corridor)

• Base Case with Additional Corridor Exhibit – C

• Outage of Agra - Gwalior 765 kV one circuit Exhibit –D

(With Additional Corridor)

From the study results it may be seen that under the outage of one circuit of Agra –

Gwalior 765 kV line the other circuit gets loaded to about 3100 MW without

additional corridor. Studies with strengthening indicate that there would not be any

problem in transferring the envisaged transfer of power. This shall also facilitate in

catering to some contingencies under N-I-I outage & transfer of economic power

from outside NR, if required. Here it may be mentioned that additional strengthening

would not only transfer the envisaged LTA quantum but would also help in providing

some margins which can be utilized for grant of access to the new applicants.

Further, as per a recent CERC order, LTA to NR granted to M/s Jindal India Thermal

Pvt. Ltd. (JITPL, Odisha) for 834MW needs to be re-allocated to other generation

projects in queue for power transfer to NR. Moreover, M/s Sterlite (Odisha) (200MW

to NR) and Bina Power Supply Co. Ltd. (MP) (132.675MW to NR) have also filed

similar petitions in CERC regarding relinquishment of their LTA quantum towards

NR. Considering this scenario, studies would be carried out and LTA to the

applicants in order of their priority shall be discussed and granted in line with CERC

regulations.

Page 23: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-I
60001726
Typewritten Text
X:\north\standing committee\37 scm\Studies\NPCIL
Page 24: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-II
60001726
Typewritten Text
X:\north\standing committee\37 scm\Studies\NPCIL
Page 25: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-III
60001726
Typewritten Text
X:\north\standing committee\37 scm\Studies\NPCIL
Page 26: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-IV
60001726
Typewritten Text
X:\north\standing committee\37 scm\Studies\NPCIL
Page 27: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-V
60001726
Typewritten Text
X:\north\standing committee\37 scm\Studies\NPCIL
Page 28: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
ANNEXURE-I
Page 29: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 30: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 31: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 32: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 33: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 34: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 35: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 36: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
Page 37: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-A
Page 38: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-B
Page 39: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-C
Page 40: webapps.powergrid.in Minutes/NR… · 400/132kV, 3x200MVA) along with 1x125MVAr bus reactor • Line bays (220 or 132kV) at Jalaun Pooling station (for its interconnection with solar
60001726
Typewritten Text
EXHIBIT-D