Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf ·...

61
Government of Andhra Pradesh Tribal Welfare Department Minutes of the 16 th Nodal Agency Meeting for Schedule Tribes Component Under the Chairmanship of Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister for SWE&TWE Venue: Metropolitan Convention Hall Date: 23.06.2017 Rc.No.L/1168/2017 dated,27.09.2017 The 16 th Nodal Agency Meeting for Schedule Tribes Component (earlier Tribal Sub Plan) was held under the chairmanship of Hon’ble Minister for SWE & TWE on 23.06.2017 at Hotel Metropolitan Convention, Vijayawada. The list of the Dignitaries / Officers present in the meeting is enclosed as Annexure-1. The Principal Secretary, Social Welfare, while welcoming the Hon’ble Minister for SWE & TWE informed the house that the meeting has greater importance since 16 th nodal agency meeting was the first meeting for the Minister for SWE & TWE after assuming the charge. Hon’ble Minister for SWE & TWE also welcomed all participants and requested for effective participation. He also informed the house that Hon’ble Chief Minister and Chairman of State Council for development of STs will be reviewing the performance of departments implementing STC (earlier TSP) on quarterly basis positively and hence departments need to plan out for ensuring 100% budget utilization against quarterly targets. The Principal Secretary, Tribal Welfare, while extending thanks to the Hon’ble Minister for giving direction to convene the nodal agency meeting, explained in brief the importance of TSP Act 2013, and the role of nodal agency in monitoring the Tribal Sub Plan. He indicated the effective implementation of Tribal Sub Plan by incurring an expenditure of Rs.2426.00 crore against Rs.3099.00 cr during 16-17 (78%). He also listed out departments which could not spend the budget allocated during 16-17 and sought their comments for non-utilization of funds. Keeping in view the priorities of Tribals, the plan for 17-18 has been approved for Rs.3528.74 cr, which is more than Rs.500.00 cr as compared to last year (16-17). The Chairman, Nodal Agency for SCC & STC & Hon’ble Minister for SWE & TWE, in his keynote address has endorsed the view point expressed by Principal Secretary, that the departments showing the nil performance in implementation of plan need to be discouraged and the departments working for tribal welfare need to be encouraged by allocating more funds. He emphasized that all the departments need to work with commitment to achieve the goals and to

Transcript of Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf ·...

Page 1: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Government of Andhra Pradesh Tribal Welfare Department

Minutes of the 16th Nodal Agency Meeting for Schedule Tribes Component Under the Chairmanship of

Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister for SWE&TWE

Venue: Metropolitan Convention Hall Date: 23.06.2017

Rc.No.L/1168/2017 dated,27.09.2017

The 16th Nodal Agency Meeting for Schedule Tribes Component (earlier Tribal Sub Plan) was held under the chairmanship of Hon’ble Minister for SWE & TWE on 23.06.2017 at Hotel Metropolitan Convention, Vijayawada.

The list of the Dignitaries / Officers present in the meeting is enclosed as Annexure-1.

The Principal Secretary, Social Welfare, while welcoming the Hon’ble Minister for SWE & TWE informed the house that the meeting has greater importance since 16th nodal agency meeting was the first meeting for the Minister for SWE & TWE after assuming the charge. Hon’ble Minister for SWE & TWE also welcomed all participants and requested for effective participation. He also informed the house that Hon’ble Chief Minister and Chairman of State Council for development of STs will be reviewing the performance of departments implementing STC (earlier TSP) on quarterly basis positively and hence departments need to plan out for ensuring 100% budget utilization against quarterly targets.

The Principal Secretary, Tribal Welfare, while extending thanks to the Hon’ble Minister for

giving direction to convene the nodal agency meeting, explained in brief the importance of TSP Act 2013, and the role of nodal agency in monitoring the Tribal Sub Plan. He indicated the effective implementation of Tribal Sub Plan by incurring an expenditure of Rs.2426.00 crore against Rs.3099.00 cr during 16-17 (78%). He also listed out departments which could not spend the budget allocated during 16-17 and sought their comments for non-utilization of funds. Keeping in view the priorities of Tribals, the plan for 17-18 has been approved for Rs.3528.74 cr, which is more than Rs.500.00 cr as compared to last year (16-17).

The Chairman, Nodal Agency for SCC & STC & Hon’ble Minister for SWE & TWE, in his keynote address has endorsed the view point expressed by Principal Secretary, that the departments showing the nil performance in implementation of plan need to be discouraged and the departments working for tribal welfare need to be encouraged by allocating more funds. He emphasized that all the departments need to work with commitment to achieve the goals and to

Page 2: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

reach the expectations of Hon’ble Chief Minister. Hon’ble Minister has taken an in depth review of schemes and works sanctioned to the departments under State and Central Schemes.

The Nodal Agency has reviewed and perused the action taken report on the minutes of 14th meeting of Nodal Agency for TSP.

The agenda wise review had been undertaken and major decisions/ resolutions taken/ passed during the meeting on the agenda items are as follows:

Agenda No. 1 Ratification of Department wise outlays proposed as BE, RE and Expenditure incurred for the year 2016-17 (as on 31.03.2017)

S.

No. Department Name BE BE after RE Exp

% of Exp w.r.to BE RE

1 2 3 4 5 6 7 1 Agriculture 8646.00 12640.61 6237.90 72.15 49.35 2 Horticulture 4578.00 5640.44 5247.44 114.62 93.03

3 Registrar Of Cooperative Societies

55.00 55.00 0.00 0.00 0.00

4 Sericulture 391.00 391.00 388.93 99.47 99.47 5 Animal Husbandry 2086.00 1560.31 1157.08 55.47 74.16 6 Fisheries 2041.00 2041.00 2030.96 99.51 99.51 7 APTRANSCO 1613.00 1613.00 1557.70 96.57 96.57 8 NEDCAP 100.00 50.00 50.00 50.00 100.00

9 Principal Chief Conservator Of Forests 600.00 546.98 346.24 57.71 63.30

10 Ayush 224.00 155.00 143.22 63.94 92.40 11 Family Welfare 7000.00 7000.00 4367.44 62.39 62.39 12 Public Health & Family Welfare 1796.00 1796.00 1796.00 100.00 100.00 13 Collegiate Education 3085.00 585.69 364.22 11.81 62.19 14 Intermediate Education 1500.00 650.00 71.75 4.78 11.04 15 Technical Education 1279.00 870.10 896.94 70.13 103.08 16 DG And IG Of Police 50.00 50.00 44.97 89.94 89.94 17 Weaker Section Housing 10000.00 9000.00 4881.99 48.82 54.24

18 Industries And Commerce & Export Promotion 1800.00 1800.00 450.00 25.00 25.00

19 Information, Technology, Electronics &Communications

1174.00 1174.00 880.50 75.00 75.00

20 Employment And Training 1175.00 1175.00 21.57 1.84 1.84 21 Registrar General Of High Court 400.00 0.00 0.00 0.00 0.00

22 Municipal Administration & Urban Development 1000.00 500.00 188.39 18.84 37.68

Page 3: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No.

Department Name BE BE after RE Exp % of Exp w.r.to

BE RE 1 2 3 4 5 6 7

23 Municipal Administration 1000.00 1243.34 1243.34 124.33 100.00 24 Panchayat Raj Engineering 4715.00 4715.00 4182.65 88.71 88.71 25 Rural Development 102169.00 122280.05 90383.79 88.46 73.92 26 Rural Water Supply 5588.63 7805.42 6869.05 122.91 88.00 27 Planning Secretariat 5702.00 3202.00 410.15 7.19 12.81 28 Land Administration 50.00 27.50 18.04 36.08 65.60 29 Relief & Disaster Management 500.00 250.00 0.00 0.00 0.00 30 Adult Education 106.00 1812.09 1520.68 1434.60 83.92 31 Sarva Siksha Abhiyan 7186.05 7902.23 7902.23 109.97 100.00

32 School Education Including RMSA 6695.95 6807.93 2301.34 34.37 33.80

33 Skill Devp, Entrepreneurship & Innovation

2500.00 2500.00 2500.00 100.00 100.00

34 Tribal Welfare 89236.00 99091.09 62473.00 70.01 63.05 35 Gurukulam 8770.00 8770.00 5770.00 65.79 65.79

36 Administration, State Roads & Road Safety (RSW) ENC R & B 2000.00 3624.09 3653.23 182.66 100.80

37 Rural Roads, ENC (R & B) 5249.00 5249.00 4107.85 78.26 78.26 38 Transport, Roads & Buildings 200.00 1200.00 150.00 75.00 12.50 39 Ground Water 118.00 118.00 44.45 37.67 37.67

40 Minor Irrigation Including APSIDC

3000.00 3677.39 3589.49 119.65 97.61

41 Disabled Welfare 25.00 25.00 25.00 100.00 100.00

42 Women Development And Child Welfare 11903.00 25122.38 13685.53 114.98 54.48

43 Cultural Affairs 200.00 100.00 33.00 16.50 33.00 44 SAAP 500.00 0.00 0.00 0.00 0.00 45 Tourism 606.00 0.00 0.00 0.00 0.00 46 Youth Services 1383.00 1383.00 1037.25 75.00 75.00 47 Food & Civil Supplies 0.00 3122.50 1622.50 0.00 51.96

GRAND TOTAL 309995.63 359322.14 244645.81 78.92 68.09

Resolution 6/2017: The Nodal Agency has reviewed department wise BE, releases & expenditure for 16-17 and the following instructions have been issued.

1. Chairman of the Nodal Agency has informed the house that the departments which are

failed to plan and utilize the budget will not be getting allocation for the next year and such funds will be reappropriated to the needy departments working for welfare of Tribals.

Page 4: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

2. Civil Supplies and Animal Husbandry Departments need to submit the list of ST beneficiaries for the year 2016-17.

3. The Municipal Administration & Urban Development Department has to submit the list of works undertaken in urban areas under drinking water and road connectivity for the year 16-17 under TSP.

4. The Health, Medical and Family Welfare department has to submit the list of initiatives taken during 16-17 made under TSP.

5. The departments which could not utilize the funds for 16-17 retained in PD accounts need to utilize the same in this year before the end of second quarter.

6. The departments particularly Agriculture, Horticulture, Animal Husbandry, Sericulture, Ayush need to submit the list of ST farmers benefitted under TSP 16-17 and success stories.

Agenda No. 2 Perusal of the Allocations of STC (Earlier TSP) 2017-18

S. No. Department Name BE BE after

RE Exp % of Exp

w.r.to BE RE

1 2 3 4 5 6 7 1 Agriculture 8597.68 9815.54 73.46 0.85 0.75 2 Horticulture 5680.17 5680.17 106.31 1.87 1.87 3 Sericulture 391.00 391.00 0.00 0.00 0.00 4 Registrar Of Cooperative Societies 35.00 35.00 0.00 0.00 0.00 5 Animal Husbandry 2086.00 2086.00 401.29 19.24 19.24 6 Fisheries 2041.00 2041.00 0.00 0.00 0.00 7 Principal Chief Conservator Of Forests 623.92 623.92 10.21 1.64 1.64 8 Technical Education 1384.00 1384.00 0.00 0.00 0.00 9 Collegiate Education 900.31 900.31 0.00 0.00 0.00

10 Intermediate Education 700.00 700.00 0.00 0.00 0.00 11 APTRANSCO 3441.06 3441.06 0.00 0.00 0.00 12 NREDCAP 100.00 100.00 0.00 0.00 0.00 13 School Education Including RMSA 6874.37 6874.37 11.99 0.17 0.17 14 Sarva Siksha Abhiyan (SSA) 9191.00 9191.00 0.00 0.00 0.00 15 Adult Education 10.00 10.00 0.00 0.00 0.00 16 Food & Civil Supplies 4000.00 4000.00 2000.00 50.00 50.00 17 Public Health & Family Welfare 1796.00 1796.00 0.00 0.00 0.00 18 Family Welfare 9457.17 9457.17 1995.00 21.10 21.10 19 Ayush 154.84 154.84 0.00 0.00 0.00 20 DG & IG Of Police 12.00 12.00 0.00 0.00 0.00 21 Weaker Section Housing 22987.06 22987.06 0.00 0.00 0.00 22 Ground Water 100.30 100.30 22.25 22.18 22.18 23 Minor Irrigation Including APSIDC 2982.00 2982.00 456.61 15.31 15.31 24 Industries Department 2300.00 2300.00 0.00 0.00 0.00

Page 5: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No. Department Name BE BE after

RE Exp % of Exp

w.r.to BE RE

1 2 3 4 5 6 7

25 Information, Tech, Electronics and Communications Secretariat 1056.60 1056.60 0.00 0.00 0.00

26 Employment And Training 30.60 30.60 1.44 4.71 4.71

27 Municipal Administration & Urban Development 1167.01 1167.01 1.89 0.16 0.16

28 Municipal Administration 1000.00 1000.00 0.00 0.00 0.00 29 Planning Secretariat 5800.00 5800.00 31.70 0.55 0.55 30 Panchayat Raj Engineering 4715.00 4715.00 2047.20 43.42 43.42 31 Rural Development 107540.66 107540.66 12977.58 12.07 12.07 32 Rural Water Supply 6093.62 6093.62 608.22 9.98 9.98 33 Land Administration 39.50 39.50 0.03 0.08 0.08

34 Skill Development, Entreprenuership And Innovation 2500.00 2597.11 0.00 0.00 0.00

35 Tribal Welfare 108745.11 108745.11 1851.89 1.70 1.70 36 GURUKULAM 343.20 343.20 0.00 0.00 0.00 37 APSRTC 900.00 900.00 0.00 0.00 0.00 38 R & B State Roads 2000.00 2000.00 1.68 0.08 0.08 39 R & B Rural Roads 5800.00 5800.00 42.67 0.74 0.74 40 Women Development And Child Welfare 13428.15 13428.15 19.39 0.14 0.14 41 Disabled Welfare 25.00 140.00 0.00 0.00 0.00 42 Cultural Affairs 170.00 170.00 0.00 0.00 0.00 43 Youth Services 5175.55 5175.55 0.00 0.00 0.00 44 SAAP 500.00 500.00 0.00 0.00 0.00

GRAND TOTAL 352874.88 354304.85 22660.81 6.42 6.40

Resolution 7/2017: The proposals for 2017-18 have been perused, approved and recommended to place before the State Council for Development of STs for ratification. While approving the action plan the Nodal Agency has instructed the line departments as under:

1. All the departments shall ensure utilization of budget allocated for the year 2017-18 and

quarterly progress against BE since the State Council for development of STs will be reviewing the quarterly performance under STC (earlier TSP).

2. Food and civil supplies department has requested for additional allocation of Rs.10 Cr. The Nodal Agency instructed to spend the allotted funds and then approach the Nodal Agency with an action plan for re-approriation of funds during third quarter.

3. Animal Husbandry department is instructed to complete the plan of action by December-2017 and seek further support if any with action plan in third quarter.

4. Housing department has been instructed to complete all the incomplete houses by September, 2017 and also to submit the plan of action for converting 1,00,000 katcha

Page 6: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

houses into pucca, so that the Food and Civil Supplies department can provide LPG connections.

5. The Chairman of the Nodal Agency has instructed Skill Development Department to submit their activities and the list of personnel placed in the recent years. The Skill Development Corporation needs to coordinate with Youth Services Department to utilize unspent funds for skill development training programmes.

6. Municipal Administration and Urban Development Department has been advised to submit work wise action plan for the year 17-18.

7. The Panchayat Raj department and Tribal Welfare Engineering department are instructed to maintain and share the list of works being grounded to avoid duplication. The Nodal Agency has instructed to give priority for road connectivity to uncovered 592 (less than 500 population) habitations by utilizing the MGNREGS funds. All the works from 2014-15 are to be uploaded in the IT platform.

8. The Rural Water Supply department has been instructed to prepare DPR for providing drinking water to 1251 uncovered habitations.

9. The Health, Medical and Family Welfare department has been instructed to get the capital heads for booking expenditure for capital expenditure.

10. The Nodal Agency has granted permission for construction of two indoor stadia proposed by SAAP at Gummalaxmipuram and Buttayagudem.

11. The AYUSH department has to submit action plan for proposed cultivation of medicinal plants by ST farmers (ITDA wise).

12. Roads and Buildings (State Roads) department is requested to utilize the un-spent budget and submit fresh proposal for additional allocation to the Nodal Agency for sanction.

13. A revised action plan is to be submitted by the Chief Engineer, Minor Irrigation for re-appropriation as the allotted budget is more than requirement.

14. The APSIDC is directed to submit the list of works in the action plan and instructed to identify more command areas.

15. School Education department is instructed to submit a proposal for providing kit worth 1000/- for ST students from class 1st to 10th and this proposal is approved conditionally for pre-matric scholarship holders only. This distribution should be bio-metric based. Further, SE department has been advised to propose special schemes exclusively for Tribal students.

16. Department of Intermediate Education is instructed to submit a proposal for new scheme designed particularly for tribal empowerment. Department has been advised to prepare scheme to give a kit to every student on the lines proposed by School Education.

17. The SERP has been directed to design a scheme for activating the dormant SHGs in the tribal areas.

18. Nodal Agency has instructed all the departments to send district wise action plan for 2017-18 and submit the copy of the same to the Tribal Welfare Department. This will facilitate the POs/ District Collectors to review STC in the quarterly review meetings.

Page 7: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Agenda No. 3 Approval of the Action Plan of the Department for 2017-18.

3.1 The Tribal Welfare Department has prepared the Department wise, District wise Action Plan under Scheduled Tribes Component for the year 2017-18. The Action Plan is released by Hon’ble Chief Minister on the occasion of 126th Birth Anniversary of Dr.B.R.Ambedkar The Action Plan (copy enclosed) is submitted for kind perusal and approval of Nodal Agency. Resolution 8/2017: The Nodal Agency has approved the Sector wise, Department wise, Scheme wise, District wise action plan of STC for 2017-18 with a direction to place it before the State Council for Development of SCs and STs for approval.

3.2 (4) line departments i.e., Panchayat Raj Engineering, School Education Including RMSA, Municipal Administration, Women Development And Child Welfare have furnished revised action plans for the year 2017-18. The Action Plan (in Annexure-3.2) is submitted for kind perusal and approval of Nodal Agency.

Resolution 9/2017: The Nodal Agency has approved the revised Acton Plans submitted by above (4) Departments with a direction to place it before the State Council for Development of SCs and STs for approval.

Agenda No. 4 Ratification of the works sanctioned by the Govt. in some departments

4.1 Administrative sanction was accorded for 11 proposals (526 works) with a total cost of Rs.12271.04 Lakhs. The work wise details are at Annexure-4.1. 4.2 The works sanctioned by the Hon'ble MTW/ Chairman, Nodal Agency for TSP vide Lr.No.L/2587/2016, dt.27.10.2016. The details of works are at Annexure-4.2. 4.3 Road works proposed by EnC, R & B Rural Roads are at Annexure-4.3

Road works proposed by EnC, Panchayat Raj (Roads) in Narasaraopet & Sattenapalli Constituencies in Guntur District are at Annexure-4.4

(20) Buses out of (51) proposed APSRTC under the scheme “Buses operation in routes connecting Tribal habitations” (BIRTH) are at Annexure-4.5

The matter is placed before the nodal agency for ratification.

Page 8: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Resolution 10/2017: a) The Nodal Agency has accorded the Administrative Sanction for 11 proposals consisting

526 works with the total cost of Rs.12271.00 Lakhs submitted in Annexure-4.1 with a direction to place it before the State Council for Development of SCs and STs for approval.

b) The Nodal Agency has reviewed the proposal for sanction of 11 MI Works (31 Check

Dams) with a cost of Rs.136.60 Lakhs in Annexure-4.2 and directed the MD, APSIDC to verify whether there are prescribed percentage of ST ayacutdars under the TSP Act who are going to get benefitted with the above works and resubmit the proposals duly following the norms.

c) The Nodal Agency has approved 3 proposals submitted by the EnC R&B Rural Roads in

Annexure-4.3, covering 20 works with a total cost of Rs.6815.00 Lakhs in the jurisdiction of Paderu, Rampachodavaram and Seethampeta ITDAs with a direction to place it before the State Council for Development of SCs and STs for approval.

d) The Nodal Agency has reviewed the proposals submitted by EnC PR (Roads) in

Narasaraopet and Sattenapalli Assembly Constituencies in Guntur District in Annexure-4.4 and approved the works proposals of Serial Nos.2,4,6,7,10 with a direction to place it before the State Council for Development of SCs and STs for approval.

e) The Nodal Agency has reviewed the proposals submitted in Annexure-4.5 by APSRTC for

ratification of 20 buses operated under the scheme “Buses operation In Routes connecting Tribal Habitations (BIRTH)” and ratified the action with a direction to place it before the State Council for Development of SCs and STs for approval.

Agenda No. 5

5.1 Consideration of the works proposals received by the Nodal Agency from certain Departments. EnC (TW) has submitted (15) works with a cost of Rs.7204.25 Lakhs are placed for perusal and approval of Nodal Agency. The details of the works are placed at Annexure-.5.1. Resolution 11/2017: The Nodal Agency has approved the proposal submitted by EnC Tribal Welfare in Annexure-5.1 for sanctioning of 15 works with a cost of Rs.7204.25 lakhs with a direction to place it before the State Council for Development of SCs and STs for approval. 5.2 The proposals which have been sent by the District Collectors and other HoDs are submitted for perusal and approval of the Nodal Agency. The details of works are placed at Annexure-5.2.

Page 9: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Resolution 12/2017:

The Nodal Agency has considered the proposals sent by the District Collectors and other HODs in Annexure-5.2 with a direction to forward the same to the concerned departments to ascertain the availability of funds under STC for this financial year and resubmit the same for consideration in the next Nodal Agency meeting. 5.3 The proposals have been received from CM Office and other Public Representatives for sanction of the works. The details are placed at Annexure-5.3. Note: The proposals have not been received through Collectors after verification of the parameters such as

40% of the ST population for the proposed villages Verification of work whether already covered in other schemes or not Whether the works were proposed with detailed estimates prepared by the department

concerned.

Resolution 13/2017: The Nodal Agency has considered the proposals received from CM Office and other Public Representatives in Annexure-5.3 and directed to send the same for verification by the Collectors w.r.t the prescribed parameters. 5.4 The EnC, PR has submitted 20 alternative works with an estimated cost of Rs.2116.50 Lakhs for the 20 works of Rs.2116.50 Lakhs sanctioned vide G.O.Ms.No. 323, dt.31.03.16 and requested for revised administrative sanction.

Resolution 14/2017: The Nodal Agency has approved the alternative works submitted by EnC, PR in Annexure-5.4 with an estimated cost of Rs.2116.50 Lakhs for the 20 works of Rs.2116.50 Lakhs sanctioned vide G.O.Ms.No.323, dt.31.03.2016 and requested for revised administrative sanction. 5.5 The APSRTC has proposed to sanction 51 buses under the scheme “Buses operation in routes connecting Tribal habitations” (BIRTH), out of which 20 buses have already been sanctioned on the occasion of 126th Birth Anniversary of Dr.B.R.Ambedkar.

The remaining 31 Buses proposed by APSRTC in Annexure-5.5 are placed below for sanction by the Nodal Agency under STC 2017-18.

Resolution 15/2017: The Nodal Agency ratified the sanction of 20 buses in connection with the occasion of 126th Birth Anniversary of Dr. B.R.Ambedkar and sanctioned the remaining 31 buses proposed by APSRTC in Annexure-5.5.

Page 10: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

5.6 Action plan for providing of Roads & Drinking water facilities for improving the living standards of the tribals by overall development of the Human Development Indeces submitted for approval.

Resolution 16/2017: The Nodal Agency has approved the proposal for providing of connectivity roads (WBM Roads) in convergence with MGNREGS with a direction to follow the norms of MGNREGS. The Nodal Agency has also directed to propose the Drinking Water works in Tribal Habitations to the Government to consider and sanction under Special Funds. 5.7 The Spl. Commissioner, Collegiate Education, Govt. of AP, Vijayawada has sent a proposal for requesting for sanctioning additional budget of Rs.40.33 lakhs under the head 2202-03-796-11-06-130/132 for purchase of 1090 duel desks by way of re-appropriation from the allocated funds of Rs.1020 Lakhs under head 2202-80-796-11-09-500/503. Resolution 17/2017: The Nodal Agency has approved the proposal for sanctioning additional budget of Rs.40.33 Lakhs under the head 2202-03-796-11-06-130/132 for purchase of 1090 duel desks by way of re-appropriation from the allocated funds of Rs.1020.00 Lakhs under head 2202-80-796-11-09-500/503 with a direction to place it before the State Council for Development of SCs and STs for approval. 5.8 It has been proposed to start a Book Grant Scheme for the year 2017-18. In this scheme the tribal students studying the professional courses would be supplied with the sets of reference books as suggested by the concerned institutions. This year it is proposed to issue 6,646 book sets to the students with a total cost of Rs.332.11 Lakhs

Resolution 18/2017: The Nodal Agency has approved the proposal of Book Grant Scheme for the year 2017-18 as proposed by Spl.Commissioner, Tribal Welfare with a cost of Rs.332.11 Lakhs with a direction to place it before the State Council for Development of SCs and STs for approval. Agenda No. 6 6.1 The Spl. CS to Govt., PR&RD, Housing Dept., AP, Amaravathi has submitted a proposal for sanctioning of additional budget of Rs.25,000/- per house from the respective sub plan funds to complete the houses which are in LL/ RL stage as the tribal beneficiaries are not in a position to complete the houses due to insufficient unit cost which is presently Rs.1,05,000/- for STs. The additional financial burden for 2,136 houses as proposed by the Housing Department would be Rs.534 Lakhs.

Hence, submitted the same for kind perusal of the Nodal Agency.

Page 11: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Resolution 19/2017: The Nodal Agency has agreed the proposal for additional budget of Rs.534 Lakhs i.e., @Rs.25,000/- per house for 2,136 houses from the respective sub plan funds to complete the houses which are in LL/RL stage as the tribal beneficiaries are not in a position to complete the houses due to insufficient unit cost for STs with a direction to place it before the State Council for Development of SCs and STs for approval. 6.2 The CEO, SERP has proposed for sanction of pensions for 1,00,000 additional ST beneficiaries which will cost Rs.108 Cr for exchequer. Submitted for perusal of the Nodal Agency.

Resolution 20/2017: The Nodal agency has agreed the proposal for sanctioning of pensions for 1,00,000 additional ST beneficiaries which will cost Rs.108.00 Cr for exchequer duly meeting the expenditure from the funds available under TSP with a direction to place it before the State Council for Development of SCs and STs for approval. 6.3 The Spl. Commissioner, WD & CW has proposed to provide “nutri-food” basket i.e., monthly nutrition supplements consisting of commodities like gram, black gram, ragi powder, ground nut, cooking oil, jaggery to the ST household every month as a part of nutrition mission to combat malnutrition in convergence mode.

In the concept note, the exact financial requirements for implementation of the above scheme and the availability of funds under different components and further requirement of the funds have not been mentioned. A letter was also addressed to the Spl. Commissioner, WD&CW to furnish the above details for taking further action in the matter.

Hence the matter is placed for kind perusal of the Nodal Agency.

Resolution 21/2017: The Nodal Agency has approved and directed the Spl. Commissioner, TW to obtain the detailed estimates for the Nutri-food basket project from the Spl. Commissioner, WD & CW with a direction to place it before the State Council for Development of SCs and STs for approval. 6.4 The Project Officer, ITDA, Chintoor has submitted proposals for Construction of two bridges across the Sokuleru vagu and Chilaka vagu including minor CD works with a financial outlay of Rs.7.50 Cr which is required as a part of infrastructure to PVTG area for better access to livelihoods, education and health facilities. Hence the matter is placed for kind perusal and sanction by the Nodal Agency.

Page 12: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Resolution 22/2017: The Nodal Agency has reviewed the proposal and return the same with a direction to re-examine the proposal on desirability of constructing the bridge in the light of the submergence of the area under Polavaram Project. 6.5 Various representations have been received from the O/o CMO, MLAs and DTWOs and other general public requesting for sanction of community halls / to extend financial assistance to the incomplete community halls taken up under MPLAD funds/ ZP funds. The representations are at hamlet, village and mandal levels that too community wise.

Further, some of the representations are to complete the incomplete community halls

taken up with other grants at district level. However, there is no specific budget available in the department to take up such works.

Therefore, a decision has to be taken to for considering the representations of community

halls. Resolution 23/2017: The Nodal Agency has reviewed the proposals received for construction of Community Halls and approved some of the proposals in Resolution No.26/2017 pending verification by the District Collectors on the following parameters with a direction to place it before the State Council for Development of SCs and STs for approval.

40% of the ST population for the proposed villages Verification of work whether already covered villages in other schemes or not Whether the works were proposed with detailed estimates prepared by the department

concerned. 6.6 The District Collector, Srikakulam has requested for Rs.65.55 Cr for completion of 5,134 incomplete houses sanctioned to Scheduled Tribes beneficiaries of Srikakulam district. Hence, submitted for kind perusal and orders of the Nodal Agency. Resolution 24/2017: The Nodal Agency has agreed the proposal of the Collector, Srikakulam for additional funds for completion of incompleted houses in principle with a direction to coordinate with the Housing Department whose proposal for additional budget @25,000/- per house has been approved in Resolution No.19/2017 with a direction to meet the expenditure from TSP funds available and to place it before the State Council for Development of SCs and STs for approval.

Page 13: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister
Page 14: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Annexure – 1

S.No. Name of the Officer Name of the Department Designation Phone No. E-Mail ID 1 G.Venkateswara Rao Civil Supplies Dy.Director 8008301383 [email protected]

2 CH.V.Somasekhar R&B CE (Roads) 9440818004 [email protected]

3 K.Sitaramaraju Fisheries Additional Director 9440814702 [email protected]

4 B.Dhanunjaya Rao Fisheries Dy.Director 9440814706 [email protected]

5 K.Rajendra Prasad APSPDCL Divisional Engineer 9491066727 [email protected]

6 Dr.A.Madhava Rao Ground Water Dy.Director 8331852046 [email protected]

7 P.Subramanya Sastry CE (PR) (Roads) Chief Engineer 9490318975 [email protected]

8 Ch.ChinaeMohammad Collegiate Education Superindent 9032548216 [email protected]

9 G.Vijaya Lakshmi Co-operation Additional Registrar 8897271000 [email protected]

10 R.Ganapathiraju Health & Family Dy.Director 7702914141 [email protected]

11 P.Vidyasagar Rao R&B Dy.EE 9440818217 [email protected]

12 Sivashanaz R&B Dy.EE 9440818219 [email protected]

13 D.Suman Kalyani APEPDCL General Manager 9440814385 solar@apeasternpower

14 S.Appala Naidu APEPDCL Administrative Officer 9490612636 cgmasap@apeasternpower

15 P.Sriramulu Housing S.E 7093930605 [email protected]

16 A.V.Subba Rao Tribal Welfare Engg.Dept. D.E 9441814228 [email protected]

17 G.Rani Babu Civi Suppiles Director 7723077400 [email protected]

18 D.Venkateswara Rao Technical Education Exonin-Ad Sec 9912342292

19 Durga Prasad Sahu Industries & Commerce J.S 8008504307

20 SVN Rajamouli CPR & RP AIE/NRM 9409099914

21 Y.Sankar Naik PR & RD STE(F) 9491069934 [email protected]

22 N.V.Ramana Murthy PR & RD STE(NRM) 8790804832 [email protected]

23 A.V.R.K.Murthy Rural Development A.A.O 8712805090 [email protected]

24 RSV Ratnaji Rao RD Dept (NTRJS) Superindent 9866119899 [email protected]

25 Y.V.S.Suryanarayana Adult Education A.D. 9440104823 [email protected]

26 A.Subba Reddy School Education J.D. 9652836677 [email protected]

27 D.Madhu Sudhan Rao SSA J.D. 9849909167 [email protected]

28 M.Srinivasa Rao Employement & Training Asst.Director 8886882009 [email protected]

29 G.Siva Kumar Employement & Training Dy.Director 8886882148 [email protected]

30 M.Ravi Sankara Sarma Ayush Dy.CEO 9000717128 [email protected]

31 V.Sudharkar APSRTC Dy.CTM(O) 9959224884 [email protected]

32 N.Geethanjali Collegiate Education J.D. 7675946633 [email protected]

33 B.Vijaya Bharathi MEPMA Finance Manager 9701385106 [email protected]

34 Dr.C.P.Nagi Reddy CESS Consultant 8978228686

35 M.Santhi Swarup Planning Dept. Joint Director 9849901509 [email protected]

36 L.Devanandam Sports Authority of AP Nodal Officer 9866317324

37 K.Sitaram YATC(Sports & YS) Jt.Sect. 7331142802 [email protected]

38 T.Ranga Rao CID Superindent 9440627310 [email protected]

39 P.Seshu Narayana Intermediate Education J.D. 9490744902 [email protected]

40 K.Vijaya Ratnam Industries Dept. J.D. 9640909812 [email protected]

41 Dr.P.Sujay Kumar Sericulture Sericulture Officer 9866559647 [email protected]

42 B.Sreenevasulu PR (ED) Dy.EE 9493392980 [email protected]

43 K.Pandu Ranga Murthy Panchayathi Raj Ex.Engineer 9948600855 [email protected]

44 P.Rambabu PR (ED) Dy.EE 9440733596 [email protected]

Page 15: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S.No. Name of the Officer Name of the Department Designation Phone No. E-Mail ID 45 CH.S.S.Prasad PR Engg. Dept. Dy.EE 9177994146 [email protected]

46 B.Bindu RWSAS A.E.E 8121610604 [email protected]

47 K.Ramudu APSWRGRS D.E.E 9490728095 [email protected]

48 M.Usha Rani Finance Dept.Sec. Dy.Secy. 9010203522 [email protected]

49 Y.U.Bhaskar Rao A.P.State Housing Corporation General Manager 7093930008 [email protected]

50 D.Narasimha Rao APSIDC D.E.E 9490959933 [email protected]

51 K.Venkata Swamy APSIDC JMD 9490959938 [email protected]

52 K.Venu Gopal Ground Water Director 8333991301 [email protected]

53 A.Sesha Chalapathi Rao Animal Husbandry Dept. AD (Plg.) 9989932544 [email protected]

54 Dr.A.Gurava Reddy Animal Husbandry Dept. V.A.S 8790998067 [email protected]

55 N.Srinivasa Reddy Minor Irrigation Dy.CE 9959511733 [email protected]

56 K.Rajendra Babu Minor Irrigation Dy.EE 8978988821

57 S.Sridhar Reddy Minor Irrigation AEE 9989252425 [email protected]

58 P.Venu Gopal ITE&C Dept. Project Manager E-Procurement 9966961652 [email protected]

59 N.Srinivasa Rao Higher Education, AP Secretraiat Asst.Secty. 9160137777 [email protected]

60 D.G.Krishna Reddy Director of Municipal Adm. Joint Director 9100591917 [email protected]

61 D.Chitti Babu Director of Municipal Adm. Asst.Director 9849905769 [email protected]

62 Dr.M.Ashok Kumar Horticulture Dy.Director 7330735555 [email protected]

63 NSR Murthy Sericulture Asst.Director 9949358994 [email protected]

64 CVS Ramamurthy Panchayath Raj Engg.Dept. E.N.C 9440100167

65 R.V.Rao Panchayath Raj Dept. Chief Engineer 9440905868 [email protected]

66 S.Kanthanath PR & RD Joint Sect. 9652931122 [email protected]

67 T.Prabhakara Rao RWS C.E 9100120504 [email protected]

68 Dr.N.Sailaja APSSDC 9849289088 [email protected]

69 G.Anil Kumar APSSDC Sr.Manager 9912122899 [email protected]

70 SHR Prasada Rao Youth Services A.O 9440158915 [email protected]

71 M.Galeb SC Corporation General Manager 9908131989

72 G.Butchaiah Reddy NEDCAP EE 9703364433 [email protected]

73 Addala.Parvathi Agriculture ADA 8886614856 [email protected]

74 N.B.Raju SAAP VC & MD [email protected]

75 K.Venkata Ratnam APDASCAC(D.W) Project Officer 9949358407

76 R.Vasantha Rao Dept. of Cultural Affairs Dy.Director 9959352281 [email protected]

77 N.Madhu Sudhana Rao LIDCAP General Manager 9949050399 [email protected]

Page 16: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

ANNEXURE-3.1

Action Plan for 2017-18

Action Plan booklet enclosed

ANNEXURE-2.2

S. No Head of Account Name of the scheme Allocation

1 2 3 4 1 PANCHAYAT RAJ & RURAL DEVELOPMENT SECRETARIAT 1 Panchayat Raj Engineering A 4515-00-796-07-12 Construction of Roads under RIAD Programme 100.00 B 4515-00-796-07-11 Construction of Roads under RIDF Programme 615.00 C 4515-00-796-11-13 Asst to Panchayat Raj Institutions for Construction of Rural Roads 10000.00 D 2515-00-796-11-46 Upgradation of NREGP works 7000.00

Total Panchayat Raj Engineering 17715.00 2 School Education including RMSA

A 2202-02-796-06-05 Support for Educational Development including teachers training and Adult Education 14.93

B 2202-02-796-06-05 Support for Educational Development including teachers training and Adult Education 51.35

C 2202-02-796-12-05 Support for Educational Development including teachers training and Adult Education 21.90

D 2202-02-796-12-05 Support for Educational Development including teachers training and Adult Education 77.03

E 2202-02-796-06-07 Rashtriya Madhyamika Siksha Abiyan (RMSA) 700.04 F 2202-02-796-12-07 Rashtriya Madhyamika Siksha Abiyan (RMSA) 1050.07 F 2202-02-796-11-39 Est of B.Ed and D.Ed Colleges for ST students in tribal areas 10.00 G 2202-01-796-06-05 Sarva Siksha Abhiyan (SSA) 4876.00 H 2202-01-796-12-05 Sarva Siksha Abhiyan (SSA) 4315.00 I 2202-01-796-06-06 Nutrious Meals Programme (MDM - Cooking Cost) 1709.68 J 2202-01-796-11-10 Nutrious Meals Programme (MDM - Cooking Cost) 1121.18 K 2202-01-796-12-06 Nutrious Meals Programme (MDM - Cooking Cost) 2118.19

Total School Education 16065.37 3 MUNICIPAL ADMINISTRATION A 4217-60-796-11-06 Providing insfrastructure facilities in ST localities (TSP) 1000.00 B 2217-80-796-11-20 Assistance to Municipalities under State Finance Commission (TSP) 1000.00

Total Municipal Administration: 2000.00 IV WOMEN, CHILDREN, DISABLED & SENIOR CITIZENS SECRETARIAT 4 WOMEN DEVELOPMENT AND CHILD WELFARE A 2236-02-796-11-06 Anna Amrutha Hastham 1000.00

Total Women Development & Child Welfare: 1000.00

Page 17: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

ANNEXURE-4.1

Work Proposals submitted by EnC Tribal Welfare

Sl No. Description Grant

Admn. sanction reference

No of works

Est.Cost. Rs. In Lakhs.

Remarks

a) Administratively sanctioned works 1 Construction of PM

College Hostel (G), Kakarapadu,of Koyyuru Mandal

Education infrastructure

G.O. MS No. 2, TWD(Edn.1) Dated

12-1-2017

1 200.00

2 Requirement of certain amenities for establishment of ITDA complex at Chinturu & Providing certain amenities for Ashram schools in (4) merged mandals of E.G.Dist .

Education infrastructure

G.O. MS. No. 3, TW (Edn-1) dated 12-1-

2017

23 958.00

3 Sanction of compound walls to (96) TW Girls Educational institutions

Article 275(1) G.O. MS. No. 51, TW (BUD) dated 10-2-

2017

96 1179.00 80 works with Est.Cost Of

Rs.916.92 Lakhs proposed in 14th Nodal agency for

approval . 4 Sanction of compound

walls to (14) TW Girls Educational institutions

Education infrastructure

G.O. MS. No. 52, TW (BUD) dated 10-2-

2017

14 419.18

5 Revised administrative sanction for certain works pertains to T.W.Educational institutions, ITDA staff quarters & YTC's

Education infrastructure

G.O. RT No. 114 TW(BUD) Dated

08.03.2017

8 133.64 Additional amount of

Rs.133.64 Lakhs aginst the

original sanction of Rs.1230.00

Lakhs. 6 Providing gap funding

to complete (20) Roads & Bridge works taken up under IAP/ACA in fullfledged shape under Education nfrastructure Grant in ITDAs of Seethampet, Paderu &R.C.Varam

Education infrastrucure

G.O. RT No. 130 TW (BUD) Dated 17-03-

2017

20 964.53

7 Providing gap funding to complete (279) works taken up under IAP/ACA in full-fledged shape under Education Infrastructure Grant in ITDAs of Paderu and R.C.Varam

Education infrastructure

G.O. RT No. 131 TW (BUD) Dated 17-03-

2017

279 1965.77

8 Construction of Tribal Museum , interiors,

Education infrastructure

GO.MS. NO. 27 TW(GCC) Dated 06-

1 3033.00

Page 18: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Sl No. Description Grant Admn. sanction

reference No of works

Est.Cost. Rs. In Lakhs.

Remarks

exterior abiance including tower with revolving restarurant ampthi theater, at KAPULAPPADU (V), Bheemunipatnam (M) of Vishakhapatnam District ,

04-2017

9 Construction of Sri Alluri Sita Rama Raju Memorial Museum at KAPULUPPADA (V), Bhimunipatnam Mandal

Education infrastructure

G.O. MS. No. 26 TW(GCC), Dated 06-

04-2017

1 150.00

10 Construction of Tribal Museumi interior artistic works such as Art & culture, Hologram and articafts , at KAPULAPPADU (V), Bheemunipatnam (M) of Vishakhapatnam District ,

Education infrastructure

GO.MS. NO. 28 TW(GCC) Dated 06-

04-2017

1 294.00

11 Providing additional infrastructure to (84)TW/Educational institutions to complete the works in full shape, which were sanctioned earlier under Building for School Complex (BSC),Educational Infrastructure (EI), SSA, CSS, IAP, Art.275(1) & NABARD grants

Education infrastrucure

G.O.Rt.No.47 dt:14-06-2017.

84 3417.92

TOTAL 526 12271.04

Page 19: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

ANNEXURE-4.2

Works Sanctioned by Hon’ble Minister, Tribal Welfare &Chairman, Nodal Agency vide

Lr.No.L/2587/2016, dt.27.10.2016.

S. No. District Nature of work Length in

KM Amount

Rs. 1 YSR Kadapa MI Works Check Dams (31) -- 136.6

ANNEXURE-4.3

Road works proposed by EnC R&B

S No Assembly constituency Name of Work Amount Rs In

Lakhs

1 Paderu Reconstruction of RCC slab culvert at Km 44/2-4 of Waddadi - Paderu road 30

2 Paderu Widening and strengthening of Paderu - Araku Road from Km 9/0 to 18/0 980

S. No. PO ITDA Name of work Amount

(Rs in Lakhs)

1

Rampa-chodavaram

Widening & Strengthening of Rajahmundry - Maredumilli - Bhadrachalam Road from km 48/755 to 55/7 in East Godavari District.

750

2 Improvements to Pandirimamidi - Chavitidibbalu road from km 0/0 to 6/0 East Godavari District. 200

3 Improvements to Pandirimamidi - Chavitidibbalu road from km 6/0 to 11/0 East Godavari District. 200

4 Improvements to Pandirimamidi - Chavitidibbalu road from km 11/0 to 20/0 East Godavari District. 200

5 Widening & Strengthening of Narsipatnam - Devipatnam road from km 100/00 to 105/0 in East Godavari District. 600

6 Widening & Strengthening of Narsipatnam - Devipatnam road from km 105/00 to 119/2 in East Godavari District. 1300

7 Widening & Strengthening of Rajahmundry - Maredumilli - Bhadrachalam Road from km 35/853 to 46/225including diversion road at Seethapalli from km 0/0 to 5/0 in East Godavari District.

500

8 Road from Molleru to Ramuladevapuram from km 0/0 to 4/0 120

9 BT road from Masampalli to Rajavaram (1 Mojor Bridge) from km 0/0 to 1/5 100

10 Narasapuram R&B Road to Musinikunta R&B Road (Via) Kannaram, Kothaveedi from km 0/0 to 15/0

450

11 Kakawada to Akuru road from km 0/0 to 12/0 360

12 Velagapalli to Pedanuthula (Via) donalanka, Gangavaram from km 0/0 to 9/0 210

13 Formation of Link road from Kaniwada to Panasalova (Via) Vootlabanda village from km 0/0 to 6/0 250

Page 20: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No. PO ITDA Name of work Amount

(Rs in Lakhs)

14 Rajavaram R&B road to Donelapalli from km 0/0 to 5/0 125 15 Pathakota to Gummirevula road from km 0/0 to 2/5 300

Sub Total 5665

1

Seethampeta

Upgradation to BT Road from P-H Road to Lowaguda (via) Kottaguda from Km 0/0 to 3/0 in Srikakulam District 300

2

Upgradation to BT Road from P-H Road to Lowaguda (via) Upparajammi, Iyyapaguda, Panasaguda from Km 0/0 to 4/0 in Srikakulam District Kottaguda from Km 0/0 to 4/0 in Srikakulam District

400

3 Upgradation to BT Road from Jonaga to Sammrelli (via) Sarihadduguda, Yeguvasamarelli, Seedhi from Km 0/0 to 5/5 in Srikakulam district.

450

Sub Total 1150

Total 6815

Page 21: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

ANNEXURE-4.4

Road works proposed by EnC PR (Roads)

S. No Mandal Name of the Work

Name of the GP/

Hab

Tota

l len

gth

in K

M

No.

of C

D w

orks

No.

of

Habi

tatio

ns

bene

fitte

d

Estim

ated

co

st (R

s. In

La

khs)

Remarks

1 Nekarikallu

Balance work for BT road from Nekarikallu to Sivanagarthanda

Sivanagarthanda. 3.40 2 1 250

ST population

77.64%

2 Rajupalem Road from Uppalapadu to Challapallithanda

Challapallithanda 3.20 2 1 285

ST population

97.2%

3 Nekarikallu

Road from Nekarikallu Aavuladonka to Lakshmipuramthanda

Lakshmipuramthanda

6.00 1 1 360 ST

population 100%

4 Nekarikallu Road from Sivanagarthanda to Udayanagarthanda

Udayanagarthanda 3.50 2 1 250

ST population

100%

5 Nekarikallu Road from Kunkalagunta to Zillapeta

Zillapeta 4.80 4 1 326 ST

population 100%

6 Nekarikallu

Road from Nekarikallu Karampudi R&B Road to Balaji Nagarthanda

Balaji Nagarthanda

2.00 1 1 240 SC/ST

Population 86%

7 Rompicherla

Road from Vipparla - Chejerla R&B Road to Chakalikunta via Kothapalli (Balance work)

Chakalikunta 2.00 3 1 100

SC/ST population

80.30%

9 Rompicherla

Road from Edward peta to Papisettipalem via Chakalikunta

Chakalikunta, Papisettipalem

6.50 6 2 400 SC/ST

population 86.83%

10 Rompicherla BT to Road from Kothapalli to Chakalikunta.

Chakalikunta 5.80 6 1 125

ST Population

80%

TOTAL

2336

Page 22: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

ANNEXURE-4.5

Proposals by APSRTC under BIRTH Scheme

Proposals of NEC region

S. No Depot From To Route cource Buses

1 SKT S.Kota Vavilapadu Vepada, Veeluparti 1 2 SKT S.Kota Valasi Damuku, Nimmalapadu 1 3 SKT S.Kota Devarapalli K.G.Pudi, Samarabba 1 4 PPM G.L.Puram Polsmguda Panasabadra,Podissa,Soba 1 5 PPM Parvathipuram Velagavalasa Gangapuram,Telunaidupeta,Mulaga 1 6 PPM Parvathipuram Sarvapadu Pedakerjala,Chinakerjala 1

7 SLR Salur Aluru Pachipenta, Kotikapenta, Kesali, Modavalasa 1

8 SLR Salur Sambara Pulleruvalasa, Bantumakkuva, Chemudu 1 9 PLS Pls Bathupuram Haripuram, Porla, Desiramachandrapurm 1

10 PLKD Palakonda Antikonda Seetampeta,Mogadara,Ghati,Gumada,Tamaralli 1

11 PLKD Palakonda Kedaripuram Seetampeta,Donubai,Polla,Neelakantapuram,G.L.Puram 1

12 PLKD Palakonda Polla Navagam,Veeragattam,Chinagora 1 13 PLKD Palakonda Sambam Kusumi Jn..,Kodisa 1

TOTAL

13

Proposals of Visakhapatnam Region

S. No Depot From To Route Cource Buses

1 Paderu Paderu Koravangi Pedabayalu 1 2 Paderu Paderu Gomangi

1

3 Paderu Paderu Guduturu G.Maduguala 1 4 Paderu Paderu Pattam Araku 1 5 Paderu Paderu Pedabayalu Araku 1 6 Nrsp Narsipatnam Koyyur Kommaki, Nadimpalkem 1 7 Nrsp Narsipatnam Paderu Chpl, Bagurathi, G.Madugula 1

Page 23: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Annexure-5.1

List of revised administrative sanction works/ New school buildings proposed for nodal agency approval (Rs. In Lakhs)

S.No

Original Grant

Name of the District Name of the Work Est. Cost

Revised admin. sanction Est. Cost.

Differnce amount Remarks

1 BSC Visakhapatnam Construction of Dormitory to GTWAHS (B) at Chintapalli of Visakhapatnam District 80.00 90.00 10.00 The increase is due to completion

of works as per type designs & change of 2 SSrs leads to Priceadjustment and as per structural designs.

2 BSC Visakhapatnam Construction of Dormitory to GTWAHS (B) at Wangasara of Visakhapatnam District 80.00 91.00 11.00

3 Nabard XVIII Visakhapatnam

Construction of Additional Infrastructure facilities to GTW Ashram School (B) at Chintapalli 1 of Visakhapatanam

100.00 119.66 19.66

4 Nabard XVIII Visakhapatnam

Construction of Additional Infrastructure facilities to GTW Ashram School (B) at Wangarasa of Visakhapatanam

100.00 119.49 19.49 Price adjustment - 18.00 Lakhs , Tender percentage-2.00 Lakhs, Structural design variations in foundation-15.00 Lakhs, & other deviations in all items of Rs.10.00 Lakhs.

5 SDF Visakhapatnam Construction of Degree College of (Women) at Marripalem. 100.00 145.00 45.00

6 BSC Vizayanagaram Construction of Staff Quarters to Ashram High School (Girls) at Kothavalasa (V) saluru(M) in Vizayanagaram district

30.00 39.10 9.10

The increase in estimate cost Rs.9.10 Lakhs due to excess Tender percentage-3.60% -Rs.1.11 Lakhs, Price adjustment -Rs.5.40 Lakhs and other minor deviations .

New school buildings converted from Hostel to Residential schools / Ashram school under GOI grant.

7 SCA to TSP, EI srikakulam TW Ashram School for Boys Tekkali Srikakulam

District ( Converted Ashram School 875.00 0.00 875.00 Proposed approval Of Nodal Agency

8 SCA to TSP, EI srikakulam Tw Ashram School for Boys ,Bhamini,

Srikakulam District( Converted Ashram School) 875.00 0.00 875.00 Proposed approval Of Nodal Agency

9 SCA to TSP, EI srikakulam Tw Ashram School for Boys ,Palakonda,

Srikakulam District( Converted Ashram School) 875.00 0.00 875.00 Proposed approval Of Nodal Agency

Page 24: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S.No

Original Grant

Name of the District Name of the Work Est. Cost

Revised admin. sanction Est. Cost.

Differnce amount Remarks

10 EI Guntur Tw Ashram School for Boys ,Narasarao Peta, Guntur District( Converted Ashram School) 820.00 0.00 820.00 Proposed approval Of Nodal Agency

11 EI Guntur Tw Ashram School for Girls ,Narasarao Peta, Guntur District( Converted Ashram School) 520.00 0.00 520.00 Proposed approval Of Nodal Agency

12 Art.275 (1), EI Prakasham

TW Ashram School Ponnalur, Prakasham District( Site Identified for C/o own Building to Ashram)

500.00 0.00 500.00 Proposed approval Of Nodal Agency

13 Art.275 (1), EI Prakasham TW Residential School , Kanigiri, Prakasham

District (Converted Res.School) 875.00 0.00 875.00 Proposed approval Of Nodal Agency

14 EI Kadapa TW Residential School , Rayachothi, Kadapa district (Converted Res.School) 875.00 0.00 875.00 Proposed approval Of Nodal Agency

15 EI Vizianagaram TW Ashram School for Boys MondemKhallu , Parvathipuram (Converted Ashram School) 875.00 0.00 875.00 Proposed approval Of Nodal Agency

Total 7580.00 604.25 7204.25

Page 25: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Annexure-5.2

List of works proposed for nodal agency approval (Received from District Collectors & HoDs): (Rs. In Lakhs)

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

1 Srikakulam Providing BT Surface to the road from Kosangi Junction to Jathapu Lada via Danjupai Junction,Lada and Peddaguda villages 3.80 310.00

2 Srikakulam Providing BT Surface to the road from Pathapatnam Tekkali road to Temburu-Ampuram road via Peduru,Kannayyapeta and also BT road from Ganguvada to Gopalapuram 8.10 470.00

Total : 11.90 780.00 1 Srikakulam B.T. Road from Seethampeta Donubai R & B road to Panda Via Lada. 6.500 500.00 2 Srikakulam B.T road from P.H. road to C.S.P. road Via Bommika Kusimi 14/2 to 16/2 K.Ms. 2.000 140.00 3 Srikakulam Providing B.T. Road from Kadagandi to Bommika Via Gajali Chkaliguda 5/0 to 7/8 Kms 2.80 200.00

4 Srikakulam Providing B.T. surface to the road from C.S.P. road at Bodlapadu Junction to Bodlapadu nagavali canal. 2.00 140.00

5 Srikakulam Providing B.T. surface to the road from Geddakola road to Gujji Via Peddapallankivalasa and Pedapallanki. 4.00 280.00

6 Srikakulam Providing B.T. surface to the road from Avalangi to Burna. 2.00 140.00 7 Srikakulam Providing B.T. surface to the road from Dolamada center to Burna Seethampeata. 2.00 140.00

8 Srikakulam Providing B.T. surface to the road from Pubbada to Jonaga Via Samarelli - Seedhi, Seedhiguda and Sarihadduguda. 8.00 560.00

9 Srikakulam Providing B.T. surface to the road from Polla R & B road to Vizinagaram border Via Kosamanuguda, Gadikarem. 6.00 420.00

10 Srikakulam Providing B.T. surface to the road from Kodagandi to Kottaguda Via Golukuppa 3.00 210.00 11 Srikakulam Providing B.T. road from Poothikavalasa to Nelligandi via Eathamanuguda 7/5 to 10/300 km 2.80 196.00

12 Srikakulam Providing B.T. surface to the road from Seethampeta Pedduru road to Peddaguda Via Kira 2/550 to 4/700 km 2.20 155.00

13 Srikakulam Providing B.T. surface to the road from Seethampeta road to Nowgada 1.50 105.00

14 Srikakulam Providing B.T. road from Valagajji mill center to Velagavada Via Puligummi, Vijayarampuram. Including Bridge 6.00 600.00

15 Srikakulam Providing B.T. road from Antikonda to Jamparakota from 3/300 to 4/250 1.25 200.00 16 Srikakulam Providing B.T. road from Valagajji Centre to Voni 3.00 200.00 17 Srikakulam Providing B.T. road from PH Road to Eathamanugudavia Yeguvadaraba 3.00 240.00 18 Srikakulam Providing B.T. road from Poothikavalasa to Vobbangi Via Thumbali 4.50 315.00 19 Srikakulam Providing B.T. road from Nelligandi to Thumbali Via Sirikondavobbangi 2.50 175.00 20 Srikakulam Rayalanka to vanija of Vizianagaram district. 3.00 210.00

Page 26: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

21 Srikakulam Danjupai Junction to thumbali 4.50 315.00 22 Srikakulam Providing BT road from AB road to Juvvumanuguda Via Bommika (0/0 to 5/0 Kms). 5.00 350.00 23 Srikakulam Providing BT road from Kattulakaviti BT Road to Hussainpuram Via Sandhumanuguda. 4.50 315.00 24 Srikakulam Providing BT road from Tekkali Meliaputti road to Deenabandupuram. 2.00 140.00 25 Srikakulam Providing BT road from Tekkali - Jadupalli road to Bagada. 4.00 280.00 26 Srikakulam Providing BT road from All Andhra road to Pogadavalli via Sanipalem 5.00 350.00 27 Srikakulam Providing BT road from M.N.road to Kotturu 1.85 100.00 28 Srikakulam Providing BT road from M.N.road to Dabaru via Mukundapuram 2.00 110.00 29 Srikakulam Providing BT road from Nelabonthu road to Penguvada Via Ampuram. 5.00 350.00

30 Srikakulam Providing BT road from Tekkali Pathapatnam road to Temburu - Ampuram via Peduru, kannayyapeta and Gopalapuram 6.00 420.00

31 Srikakulam Providing BT road from Mahindra tanaya river to bydalapuram Via Romadala 7.00 210.00 32 Srikakulam Providing BT road from K.P. road to Stuvarpuram 1.50 105.00 33 Srikakulam Providing BT road Surface banki to Rayala via Yerratiguda 3.00 210.00 34 Srikakulam Providing BT road from Gottipalli to Pedarajapuram 3.00 210.00 35 Srikakulam Providing BT road from P.H. road to Kantamanuguda via Masangiguda. 4.00 280.00 36 Srikakulam Providing BT road from Addangi road to Marriguda via Peddoduguda. 6.00 420.00 37 Srikakulam Providing BT road from Gottipalli to Addangi via Cheepurupalli - Deppiguda. 6.00 420.00 38 Srikakulam Providing BT road from Parlakhimundi, Kasinagar road to Bydalapuram via Thamaraguda. 9.00 630.00 39 Srikakulam Providing BT road from Gottipalli to Polamuguda via Bhuthalaguda. 7.00 490.00 40 Srikakulam Providing BT road from Gotta to Lokonda 3.00 210.00 41 Srikakulam Providing BT road from Marriguda to Bondiguda 2.00 140.00 42 Srikakulam Providing BT road from Chaviti Seedhi to Kittalapadu 2.00 140.00

43 Srikakulam Providing BT Surface to the road from Tangaraputti Junction to narasingapuram via Raikola, Bathupuram 3.00 210.00

44 Srikakulam Providing BT Surface to the road from Killoyi to Kudumasai (5/2 to 6/500 KMs) 1.30 100.00 45 Srikakulam Providing BT Surface to the road from Kondalogam BT road to Adavikotturu via Ramarai 4.00 280.00 46 Srikakulam Providing BT Surface to the road from Savaramadhya junction to Pattulogam via kariyapalli. 4.00 280.00 47 Srikakulam Providing BT road from Budarisingi junction to Godiyali via Garidelu, Pathakota. 3.00 210.00

48 Srikakulam Providing BT road from Pattulogam - Kondalogam BT road to advikotturu via Ramarai - Geddaveedhi. 4.00 280.00

49 Srikakulam Providing BT road from Mandasa to Savaramadhya BT Road via Jillunda 4.00 280.00

50 Srikakulam Providing BT road from Narasingapuram to Mandasa via Dimiri. 3.50 245.00

Page 27: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

51 Srikakulam Providing BT road from Kasibugga - Akkupalli road at Rajam colony to bathupuram (2.80/4.20) balance length 1.40 98.00

52 Srikakulam Providing BT road from Palasa - Goppili to road from Loddabadra junction to Kotarisingi - Tallabadra. 4.50 315.00 53 Srikakulam Providing BT road from Peddapalia to Thusarada 4/00 to 5/200 1.20 130.00 54 Srikakulam Providing BT road from Rathi road to Limbugam 2.50 170.00 55 Srikakulam Providing BT road from R & B road to Nagarampalli. 1.50 105.00 56 Srikakulam Providing BT road from Mandasa NH5 rathi road to Lingupuram via Ambugam 3.00 210.00 57 Srikakulam Providing BT road from Mandasa Gollapalem to Erramukkam via Rathi 1.50 105.00 58 Srikakulam BT road from NH5 to Kobbarichetturu 2.20 154.00 59 Srikakulam BT road from Ragoyi to Yungurudu - Mamidichettu via Gramadevathalayam 1.00 70.00 60 Srikakulam Providing BT road from MM road to Budambo 3.50 140.00 61 Srikakulam Providing BT surface to the road from Jalantharakota to Tuttasai via Nowgada (4/200 to 6/0 KM) 1.80 126.00 62 Srikakulam Providing BT surface to the road from Berhupuram - Naidupoluru roa 1.30 100.00

63 Srikakulam BT surface to the road from Nowpada - Meliaputti road at Damara Junction to NH-16 Adi Andhra Veedhi- Tekkali via. 6.50 455.00

64 Srikakulam BT surface to the road from Tekkali Meliaputti road to Narasingapalli - Ramapuram. 1.80 180.00

65 Srikakulam BT surface to the road from Nowpada - Meliaputti road at Narasingapalli junction to Mukhalingapuram 4.00 280.00

66 Srikakulam Providing BT road from Bheempuram to Marripadu 2.00 200.00 67 Srikakulam Providing BT surface to the road from Gopalapuram to Mukhalingapuram 3.50 145.00

68 Srikakulam Providing BT surface to the road from Nowgam road 2.40 168.00

69 Srikakulam Construction of C.D. works (3 nos) on the road Heerapuram to harshabada. 0.00 100.00

70 Srikakulam Providing BT Surface to the road from Heerepuram - Harshabada at Peddaguruvuru junction to Dimmaidijola 4.00 280.00

71 Srikakulam Providing BT Surface to the road from S.R.K. Puram to Venkatapuram 2.00 140.00

72 Srikakulam Providing BT Surface to the road from Nowpada - Meliapuuti junction to G. jagannadhapuram to Naraharipuram 1.50 105.00

73 Srikakulam Providing BT Surface to the road from kallada to naidupuram 1.80 120.00 74 Srikakulam Providing BT surface to the road from Nowpada road to lakshmipuram 1.00 130.00

75 Srikakulam BT surface road from Nowgam road to Mukundapuram via Venkapeta - Singupuram, Gopalem in Nandigam (M) 4.50 315.00

76 Srikakulam BT sueface road from Bajeerupeta colony to Savarasoligam 2.00 315.00 77 Srikakulam Providing BT road from palakonda Sarubujjili road to via Masanaputi 5.00 350.00 78 Srikakulam BT road from Masanaputti junction Vennelavalasa Junction via jangalapadu 7.00 490.00

Page 28: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

79 Srikakulam BT road from Thuddali junction to N.K.Rajapuram Junction via haripuram 4.00 280.00 80 Srikakulam Providing BT road from Madanapuram to Jharali 2.50 175.00 81 Srikakulam Providing BT road from K.C. road to Raivada 2.00 140.00 82 Srikakulam Providing BT road from C.P road to Savarakuridingi 2.00 140.00 83 Srikakulam Providing BT road from KC road to Pathuru 2.00 140.00 84 Srikakulam Providing BT road from R & b road to Savaramaluva 2.60 182.00

Total: 277.70 19759.00 1 Visakhapatnam R & B Works(Anathageri(M)) 37.1 2739.00 2 Visakhapatnam R & B Works(Arakuvally(M)) 4 288.00 3 Visakhapatnam R & B Works(Dumbriguda(M)) 4.7 446.00 4 Visakhapatnam R & B Works(Hukumpeta(M)) 53.3 2952.50 5 Visakhapatnam R & B Works(Munchingiput(M)) 15.2 1155.00 6 Visakhapatnam R & B Works(Pedabayalu(M)) 16.8 1128.00 7 Visakhapatnam R & B Works(Chinthapalli(M)) 34.1 2014.00 8 Visakhapatnam R & B Works(G.K.Veedhi(M)) 19.8 1400.00 9 Visakhapatnam R & B Works(G.Madugula(M)) 22.8 1634.00

10 Visakhapatnam R & B Works(Koyyuru(M)) 15.8 1446.00 11 Visakhapatnam Paderu 22 1668.00

Total: 16870.50 1 Visakhapatnam Rc.No.TSP/ATO/2016, dt.18.02.2016 of the EE, R&B, Paderu 3765.00 1 East Godavari BT Surface to the raod from Molleru to Ramuladevapuram in Gangavaram(M) 0/0 to 4/2 120.00

1 SPSR Nellore Providing CC Road and underground drainage in Thirumalapuram ST Colony (V), Udayagiri (M), Nellore Dist. 0.981 Km 115.30

1 Krishna Provide CC road from Zilla Parishad road to M. Swamy house in Origirala Thanda at Venkatayapalem(V), of Nuzvid (M) 100.00 5.00

2 Krishna Provide CC road from Zilla Parishad road to B. Shaku house in Origirala Thanda at Venkatayapalem(V), of Nuzvid (M). 75.00 4.00

3 Krishna Provide CC road from Anjaneya Swamy Temple to School in Origirala Thanda at Venkatayapalem(V), of Nuzvid (M). 105.00 5.00

4 Krishna Provide CC road from B. Rama Das house to to B. Sakru house in Lion Thanda at Venkatayapalem(V), of Nuzvid (M). 50.00 5.00

5 Krishna Construction of CC Pavement to the road from NG road to V.Somulu house in Venkatayapalem(V), of Nuzvid (M). 64.00 3.80

6 Krishna Construction of CC Pavement to the road from NG road to V.Raju house in Venkatayapalem(V), of Nuzvid (M). 105.00 5.00

Page 29: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

7 Krishna Provide CC road from N G road to A Balaji house Lion Thanda at Venkatayapalem(V), of Nuzvid (M). 40.00 2.60

8 Krishna Provide CC road from L.Chittodu house to L.Buddu house at Hatiya Thanda at Venkatayapalem(V), of Nuzvid (M). 40.00 2.60

9 Krishna Construction of CC Pavement to the road from B. Manza house to L. Latchu house in Venkatayapalem(V), of Nuzvid (M). 66.00 3.80

10 Krishna Construction of CC Pavement to the road from L.Sreenuhouse to L.Koteswara house in Venkatayapalem(V), of Nuzvid (M). 65.00 3.50

11 Krishna Construction of CC Pavement to the road from B. Lakhsmana house to B. Srihari house in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid(M) 61.00 3.50

12 Krishna Construction of CC Pavement to the road from M.Sacru house to M. Sreenu house in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid(M). 58.00 3.40

13 Krishna Construction of CC Pavement to the road from A.Rasilli house to B.Bheemudu house in Venkatayapalem(V),(Kothuru Thanda) of Nuzvid 62.00 3.70

14 Krishna Construction of CC Pavement to the road from M Somulu house to B Krishore house in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid (M). 60.00 3.60

15 Krishna Construction of CC Pavement to the road from B.Rambabu house to B Sureshhouse in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid (M). 61.00 3.60

16 Krishna Construction of CC Pavement to the road from V.Ramudu house to V Sreenu house in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid (M). 64.00 3.70

17 Krishna Construction of CC Pavement to the road from V Vasa Rajulu house to M. Devili house in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid (M). 62.00 3.60

18 Krishna Construction of CC Pavement to the road from L.Ranga house to L.Naidh house in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid 61.00 3.70

19 Krishna Construction of CC Pavement to the road from L.Venkatesu house to B Setaramaiah house in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid 66.00 3.80

20 Krishna Construction of CC Pavement to the road from L.Vali house to L.Balu house in Venkatayapalem(V), (Kothuru Thanda) of Nuzvid (M). 65.00 3.70

21 Krishna Providing CC road from V.Sripathi Rao house to L.Balu house in Kothuru Thanda at Venkatayapalem(V), of Nuzvid (M). 62.00 3.50

22 Krishna Providing CC road from B.Dishtla house to M.Seshu house in Kothuru Thanda at Venkatayapalem(V), of Nuzvid (M). 57.00 3.30

23 Krishna Providing CC road from V.Pangidamma house to M.Ranga house in Kothuru Thanda at Venkatayapalem(V), of Nuzvid (M). 63.00 3.55

24 Krishna Providing CC road from M.Maresu house to Y.Koteswara Rao house in Kothuru Thanda at Venkatayapalem(V), of Nuzvid (M). 57.00 3.30

Page 30: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

25 Krishna Providing CC road from Ramulavari temple to A.Koteswara Rao house in Kothuru Thanda at Venkatayapalem(V), of Nuzvid (M). 70.00 3.85

26 Krishna Providing CC road from A.Chanti house to A.Subba Rao house in Kothuru Thanda at Venkatayapalem(V), of Nuzvid (M). 40.00 2.60

27 Krishna Providing CC road from Sri J.Konda House to Hatiya Thanda in at Venkatayapalem(V), of Nuzvid (M). 100.00 5.00

28 Krishna Providing BT road from Hatiya Thanda to Lion Thanda (VIA) Harichandrudi Thanda at Venkatayapalem (V), of Nuzvid (M) 500.00 48.00

TOTAL: 2279.00 149.60

1 Krishna Providing CC Road form R &B road to JayanthapurajuHouse in ST area at Hanumanthulagudem (V), in Nuzvid (M). 6.70 25.00

2 Krishna Providing CC Road from Main Bazar Hand Pump to Banavathu Venkatesu House (via) U.P.School in ST area of Hanumanthulagudem (V), in Nuzvid (M). 1.35 5.00

3 Krishna Construction of Culvert at & CC road from R&B road to Sri Hari House in ST area of Hanumanthulagudem (V), in Nuzvid (M). 1.35 5.00

4 Krishna Providing CC road from R&B road to Bokya Kalyanam House in ST area of Hanumanthulagudem (V), in Nuzvid (M). 1.22 4.50

5 Krishna Providing CC Road from Bokya Tirupathamma House to R&B road in ST area of Hanumanthulagudem (V), in Nuzvid (M). 1.35 5.00

6 Krishna Providing CC road from R&B road to Vandrothu Lakshmi House in ST area of Hanumanthulagudem (V), in Nuzvid (M). 1.35 5.00

TOTAL: 13.32 49.50

1 Chittoor Providing Drinking Water Facilities(SVS) in Dadinayani(V), Madanapalle(M) in Dadinayani(V), Madanapalle(M) 6.50

2 Chittoor Providing Drinking Water Facilities(SVS) in Naramakula Thanda (V), Madanapalle(M) in Naramakula Thanda (V), Madanapalle(M) 12.50

3 Chittoor Providing Drinking Water Facilities(SVS) in Udumvaripalle Thanda(V), Madanapalle(M) in Udumvaripalle Thanda(V), Madanapalle(M) 6.50

4 Chittoor Providing Drinking Water Facilities(SVS) in Begavaripalle Thanda(V), Madanapalle(M) in Begavaripalle Thanda(V), Madanapalle(M) 7.50

5 Chittoor Providing Drinking Water Facilities(SVS) in Nadimithanda(V), Madanapalle(M) in Nadimithanda(V), Madanapalle(M) 6.00

6 Chittoor Providing Drinking Water Facilities(SVS) in Kondameeda Thanda (V), Madanapalle(M) in Kondameeda Thanda (V), Madanapalle(M) 7.50

7 Chittoor Providing Drinking Water Facilities(SVS) in Kondameeda Thanda (V), Madanapalle(M) in K.B.Thanda(V), Thamballa Palle(M) 10.00

Page 31: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

8 Chittoor Providing Drinking Water Facilities(SVS) in Guthavanipalle Thanda(V), Molakala Cheruvu(M) in Guthavanipalle Thanda(V), Molakala Cheruvu(M) 13.00

9 Chittoor Providing Drinking Water Facilities(SVS) in Kanikalathanda(V), Molakala Cheruvu(M) in Kanikalathanda(V), Molakala Cheruvu(M) 13.00

10 Chittoor Providing Drinking Water Facilities(SVS) in Veeranjaneyapuram(V), Molakala Cheruvu(M) in Veeranjaneyapuram(V), Molakala Cheruvu(M) 13.00

11 Chittoor Providing Drinking Water Facilities(SVS) in Erukulavaripalle(V), Kurabalakota(M) in Erukulavaripalle(V), Kurabalakota(M) 13.00

12 Chittoor Providing Drinking Water Facilities(SVS) in Bandakinda Thanda(V), Peddamandyam(M) in Bandakinda Thanda(V), Peddamandyam(M) 13.00

13 Chittoor Providing Drinking Water Facilities(SVS) in Gonupothula thanda(V), Peddamandyam(M) in Gonupothula thanda(V), Peddamandyam(M) 13.00

14 Chittoor Providing Drinking Water Facilities(SVS) in Guttakinda Thanda(V), Peddamandyam(M) in Guttakinda Thanda(V), Peddamandyam(M) 13.00

15 Chittoor Providing Drinking Water Facilities(SVS) in Diguvathanda(V), Kalakada(M) in Diguvathanda(V), Kalakada(M) 7.00

16 Chittoor Providing Drinking Water Facilities(SVS) in Eguvathanda(V), Kalakada(M) in Eguvathanda(V), Kalakada(M) 7.00

17 Chittoor Providing Drinking Water Facilities(SVS) in Kalakada Yanadi Indlu(V), Kalakada(M) in Kalakada Yanadi Indlu(V), Kalakada(M) 7.00

18 Chittoor Providing Drinking Water Facilities(SVS) in Thettu(V), Kalakada(M) in Thettu(V), Kalakada(M) 7.00

19 Chittoor Providing Drinking Water Facilities(SVS) in Marri Makulapalle Thanda(V), Piler(M) in Marri Makulapalle Thanda(V), Piler(M) 7.00

20 Chittoor Providing Drinking Water Facilities(SVS) in Ramanaik Thanda(V), Piler(M) in Ramanaik Thanda(V), Piler(M) 7.00

21 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Chukkla Nadigallu(V), Srikalahasti(M) in Chukkla Nadigallu(V), Srikalahasti(M) 15.42

22 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Obulayapalle YC(V), Srikalahasti(M) 15.42

23 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Gundlapalle(V), Srikalahasti(M) 15.42 24 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Kalampalle(V), Srikalahasti(M) 15.42

25 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Ramachandra Puram(V), Thottembedu(M) 14.49

26 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Sheshanaidu YC(V), Thottembedu(M) 13.01

Page 32: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

27 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply 16.42

28 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Annaswamy Palle(V), Renigunta(M) 16.42

29 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply inGuruvarajupale(V), Renigunta(M) 16.42

30 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Govindapuram(V), Yerpedu(M) 11.17

31 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Peddathanda(V), K.V.Palle(M) 7.00

32 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply inChikkapalle Thanda(V), Ramakuppam(M) 14.00

33 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Takumanda Thanda(V), Ramakuppam(M) 14.00

34 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply inBandakothuru Thanda(V), Ramakuppam(M) 14.00

35 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Addagattu Thanda(V), Ramakuppam(M) 14.00

36 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Thulasinaik Thanda(V), Ramakuppam(M) 14.00

37 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Gattur Thanda(V), Ramakuppam(M) 14.00

38 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in PMK Thanda(V), Ramakuppam(M) 14.00

39 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Narayanapuram thanda(V), Ramakuppam(M) 14.00

40 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Ramagiri YC(V), Pichatur(M) 16.11

41 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Rajanagaram(V), Pichatur(M) 15.18

42 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Ramapuram(V), Pichatur(M) 15.08

43 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Siddaraju Kandriga(V), Pichatura(M) 15.60

44 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Keelapudi YC(V), Pichatur(M) 15.85

Page 33: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

45 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Mallagunta H/o Chilamathur(V, Pichatur(M) 15.02

46 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Kovanur(V), KVB Puram(M) 15.58

47 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Thimma Samudram(V), KVB Puram(M) 15.45

48 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Rayalukandriga(V), KVB Puram(M) 15.02

49 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Katarapalle(V), KVB Puram(M) 16.25

50 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in kotalamitta(V), KVB Puram(M) 16.47

51 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Vagathuru(V), KVB Puram(M) 5.87

52 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Eswara YC(V), Narayanavanam(M) 5.26

53 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Srinivasa YC(V), Narayanavanam(M) 15.39

54 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Kannikapuram(V), Narayanavanam(M) 17.77

55 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Buttireddikandriga(V), Vadamalapeta(M) 11.19

56 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Venganakandriga Yanadi Colony(V), Nagari(M) 13.54

57 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in M.N.Kandriga Yanadi Colony(V), Nagari(M) 13.49

58 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Sadasivapuram(V), Puttur(M) 13.49

59 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Thirumalakuppam(V), puttur(M) 13.49

60 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Aruru Yc(V), Nindra(M) 8.63

61 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Iruguvai(V), Nindra(M) 11.49

62 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in P.R.Puram Yanadi Colony(V), Nindra(M) 13.49

Page 34: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

63 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Kanikapuram(V), Nindra(M) 2.28

64 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Gandhi Colony H/o Kallivettu(V), B.N.Kandriga(M) 15.04

65 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Kampalem(V), B.N.Kandriga 13.38

66 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Kanamanambedu Yanadi Colony(V), B.N.Kandriga(M) 14.13

67 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Suddamitta YC H/o Pallamala(V), B.N.Kandriga(M) 15.54

68 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Peddapalavedu YC(V), B.N.Kandriga(M) 15.15

69 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Putteri(V), B.N.Kandriga(M) 15.23

70 Chittoor Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Kaatur YC H/o Kaatur(V), B.N.Kandriga(M) 13.60

71 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in AruduruYC (V), Varadaiah Palyam(M) 14.88

72 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Kalathur YC(V), Varadaiah Palyam(M) 15.03

73 Chittoor Bore Well, Pump Set, Pumping Main, Gravity Main, OHSR and Power Supply in Karipakam YC(V), Varadaiah Palyam(M) 15.25

1 Visakhapatnam Drinking Water Schemes(15 Works) to ST Localities 175.00 1 YSR District Construction of Check Dam Across Somala Vanka near at Chintalamadugupall (V), Kadapa District. 16 7.31 2 YSR District Improvements to Check dam 1 across Bakkambavi Vanka near 15 3.53 3 YSR District Improvements to Check dam 3 across Bakkambavi Vanka near 10 3.48 4 YSR District Improvements to Check dam 4 across Bakkambavi Vanka near 13 3.62 5 YSR District Improvements to Check dam 5 across Bakkambavi Vanka near 11 3.89 6 YSR District Improvements to Check dam across Bakkambavi Vanka near 10 3.97 7 YSR District Improvements to Check dam across Boggulagadda Vanka near at Agricultural land 8 3.41 8 YSR District Improvements to Check dam across Boggulagadda Vanka near at Agricultural land 12 3.61 9 YSR District Improvements to Check dam across Atchalamma Kunta near 9 6.57

10 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of Krishna Naik near 10 3.66 11 YSR District Improvements to Check dam across Nalla Cheruvu Vanka near 11 3.73 12 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of J. Anjaneyulu Naik near 12 4.33

Page 35: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road in K.Ms.

Est. Cost (Rs.in Lakhs)

13 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of Srinu Naik near 10 3.61 14 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of Anand Naik near 12 4.96 15 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of Gangolamma Naik near 10 3.71 16 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of L. Raju Naik near 10 4.45 17 YSR District Improvements to Check dam across Peethara Kunta near 8 7 18 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of Munnemma near 13 3.62 19 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of B. Tulasi near 12 3.43 20 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of J. Devi near 12 3.76 21 YSR District Improvements to Check dam across Local Vanka near at Agricultural land of J. Ravi Naik near 10 3.52 1 East Godavari Gogubaka 300.94 1118.00 2 East Godavari Gogubaka 236.1 3 East Godavari Gogubaka 126.07 4 East Godavari Gogubaka 335.65 5 East Godavari Gogubaka 357.51 6 East Godavari Gogubaka 541.87 7 East Godavari Gogubaka 195.03 8 East Godavari Gogubaka 30.08 9 East Godavari Chopalli 86.00 32.20

10 East Godavari Chintalagudem-II 99.00 43.30 11 East Godavari Bhagavanpuram-II 60.00 23.80

Page 36: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Annexure-5.3

List of works proposed for nodal agency approval (Received from CM Office and other Public Representatives) (Rs. In Lakhs)

S. No District Name of the Work Length road

in KM Est. Cost

(Rs.in Lakhs) 1 Visakhapatnam Internal CC roads and Drain roads in SC/ST Areas 266.54 621.20 2 Visakhapatnam Internal CC roads and Drain roads in SC/ST Areas 239.24 435.75 3 Visakhapatnam Internal CC roads and Drain roads in SC/ST Areas 292.49 872.80 4 Visakhapatnam Internal CC roads and Drain roads in SC/ST Areas 92.2 145.00

TOTAL: 890.47 2074.75 1 West Godavari B.T.Road from Buchimpeta to Karamvarigudem in Sanjeevapuram(V) ___ 38.00 2 West Godavari B.T.Road from Buchimpeta to Sayamvari Pakalu in Sanjeevapuram(V) ___ 48.00 3 West Godavari B.T.Road from Buchimpeta to Sanjeevapuram(V) ___ 30.50 4 West Godavari B.T.Road from Sanjeevapuram to Karicherlagudem Bit-I in Sanjeevapuram(V) ___ 45.00 5 West Godavari B.T.Road from Sanjeevapuram to Karicherlagudem Bit-II in Sanjeevapuram(V) ___ 37.50 6 West Godavari B.T.Road from Buchimpeta Karamvarigudem to Muddappagudem in Sanjeevapuram(V) ___ 38.00 7 West Godavari B.T.Road from Buchimpeta Karamvarigudem to Regulakunta in Sanjeevapuram(V) ___ 20.50 8 West Godavari B.T.Road from Sanjeevapuram to Matangimetta Bit-I Sanjeevapuram(V) ___ 48.00 9 West Godavari B.T.Road from Sanjeevapuram to Matangimetta Bit-Ii Sanjeevapuram(V) ___ 48.00

10 West Godavari B.T.Road from Sanjeevapuram to Matangimetta Bit-III Sanjeevapuram(V) ___ 49.00 11 West Godavari B.T.Roadrenewals to the road from Nandigudem to JagannadapuraSanjeevapuram(V) ___ 112.80

TOTAL: 515.30

1 Ananthapur Rural roads 830.00 1 Kurnool Internal CC Road in ST Colony of Rallakothur Thanda(M) 5.00 2 Kurnool CC Road at Main entrance in ST Colony of Rallakothur Thanda(M) 4.90 3 Kurnool BT Approach Road to Pasupula Thanda(M) 50.00 4 Kurnool BT Approach Road to Gulamaliabad Thanda(M) 60.00 5 Kurnool Internal CC Road in ST Colony of Ramatheertham 5.00 6 Kurnool Internal CC Road in ST Colony of Isranaik Thanda(M) 5.00 7 Kurnool BT Road from Kunikuntla to Isranaik Thanda Via.Mannenaik Thanda(M) 200.00 8 Kurnool Internal CC Road in ST Colony of Pikkirlapalli Thanda(M) 4.90 9 Kurnool Internal CC Road in ST Colony of Kondamanayunipalli(M) 5.00

10 Kurnool Internal CC Road in ST Colony of Koilakuntla(M) 4.80

TOTAL: 344.60

Page 37: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road

in KM Est. Cost

(Rs.in Lakhs)

1 Chittoor BT Surface to the road from MBT road (NH4) to Jagamarla ST Colony via Ganghi Nagar, Jagamarla in Palamaner Constituency 9.5 400.00

1 Guntur CPWS Scheme to left over ST Habitations from Jerrivagu (Phase-II) in Veldurthy Mandal (20 -Villages) 1100.00

2 Guntur CPWS Scheme to Tallapalli & Other habitations (Anupu-Ph-II) in Macherla of Guntur District. (7-Villages) 632.00

3 Guntur Provide quality drinking water facilities in quality affected in (11) villages of Rentachinthala Mandal of Guntur 1900.00

1 Srikakulam Repairs to GCC Depot cum Godown at K.Gumada(V) 4 2 Srikakulam Repairs to GCC Depot cum Godown at Pedarama(V) 4.3 3 Srikakulam Repairs to GCC Depot cum Godown at Addakulaguda(V) 3 4 Srikakulam Repairs to GCC Depot cum Godown at Sambham(V) 3.3 5 Srikakulam Repairs to GCC Depot cum Godown at Kusimi(V) 2.7 6 Srikakulam Repairs to GCC Depot cum Godown at Chinkamba(V) 3.5 7 Srikakulam Repairs to GCC Depot cum Godown at Bhamini(V) 2 8 Srikakulam Repairs to GCC Depot cum Godown at Loharijola(V) 2 9 Srikakulam Repairs to GCC Depot cum Godown at Labara(V) 3.5

10 Srikakulam Repairs to GCC Depot cum Godown at Gottipalli(V) 3.6 11 Srikakulam Repairs to GCC Depot cum Godown at Archanapuram(V) 3.6 12 Srikakulam Repairs to GCC Depot cum Godown at Chintalapoluru(V) 3.6 13 Srikakulam Repairs to GCC Depot cum Godown at Bandapalli(V) 3.6 14 Srikakulam Repairs to GCC Depot cum Godown at Basavasai(V) 6.6 15 Srikakulam Repairs to GCC Depot cum Godown at Killoyi Colony(V) 6.7 16 Srikakulam Repairs to GCC Depot cum Godown at Budambo(V) 1 17 Srikakulam Repairs to GCC Depot cum Godown at Himagiri(V) 6.8 18 Srikakulam Repairs to GCC Depot cum Godown at Lotturu(V) 6.6 1 Nellore Providing internal CC roads at G/C Bit-I 0.15 5.00 2 Nellore Providing internal CC roads at G/C Bit-II 0.15 5.00 3 Nellore Providing internal CC roads at G/C Bit-III 0.15 5.00 4 Nellore Providing internal CC roads at G/C Bit-IV 0.15 5.00 5 Nellore Providing internal CC roads at G/C Bit-I 0.15 5.00 6 Nellore Providing internal CC roads at G/C Bit-II 0.15 5.00 7 Nellore Providing internal CC roads at G/C Bit-III 0.15 5.00 8 Nellore Providing internal CC roads at G/C Bit-IV 0.15 5.00

Page 38: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road

in KM Est. Cost

(Rs.in Lakhs) 9 Nellore Providing internal CC roads at G/C Bit-I 0.12 4.00

10 Nellore Providing internal CC roads at G/C Bit-II 0.12 4.00 11 Nellore Providing internal CC roads at G/C Bit-I 0.15 4.00 12 Nellore Providing internal CC roads at G/C Bit-II 0.15 4.00 13 Nellore Providing internal CC roads at G/C Bit-III 0.15 4.00 14 Nellore Providing internal CC roads at G/C Bit-I 0.15 4.00 15 Nellore Providing internal CC roads at G/C Bit-II 0.15 4.00 16 Nellore Providing internal CC roads at G/C Bit-III 0.15 4.00 17 Nellore Providing internal CC roads at G/C Bit-IV 0.15 4.00 18 Nellore Providing internal CC roads at G/C Bit-I 0.15 5.00 19 Nellore Providing internal CC roads at G/C Bit-II 0.15 5.00 20 Nellore Providing internal CC roads at G/C Bit-III 0.15 5.00 21 Nellore Providing internal CC roads at G/C Bit-IV 0.15 5.00 22 Nellore Providing internal CC roads at G/C Bit-V 0.15 5.00 23 Nellore Providing internal CC roads at G/C Bit-I 0.15 5.00 24 Nellore Providing internal CC roads at G/C Bit-II 0.15 5.00 25 Nellore Providing internal CC roads at G/C Bit-III 0.15 5.00 26 Nellore Providing internal CC roads at G/C Bit-IV 0.15 5.00

Total 3.84 121.00 1 Nellore Providing internal CC roads in Kapparallathippa-I 0.15 5.00 2 Nellore Providing internal CC roads in Kapparallathippa-II 0.15 5.00 3 Nellore Providing internal CC roads in Kapparallathippa-III 0.15 5.00 4 Nellore Providing internal CC roads in Kapparallathippa-IV 0.15 5.00 5 Nellore Providing internal CC roads in Kapparallathippa-V 0.15 5.00 6 Nellore Providing internal CC roads in Kovurupalli (PT)-I 0.15 5.00 7 Nellore Providing internal CC roads in Kovurupalli (PT)-II 0.15 5.00 8 Nellore Providing internal CC roads in Kovurupalli (PT)-III 0.15 5.00 9 Nellore Providing internal CC roads in Kovurupalli (PT)-IV 0.15 3.00

10 Nellore Providing internal CC roads in Allimadugu Sangam-I 0.15 5.00 11 Nellore Providing internal CC roads in Allimadugu Sangam-II 0.15 5.00 12 Nellore Providing internal CC roads in Allimadugu Sangam-III 0.15 5.00 13 Nellore Providing internal CC roads in Allimadugu Sangam-IV 0.15 5.00 14 Nellore Providing internal CC roads in Allimadugu Sangam-V 0.15 5.00 15 Nellore Providing internal CC roads in ST Colony of Konda Bitragunta Bit-1 0.15 5.00

Page 39: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. No District Name of the Work Length road

in KM Est. Cost

(Rs.in Lakhs) 16 Nellore Providing internal CC roads in ST Colony of Konda Bitragunta Bit-2 0.15 5.00

Total 2.40 78.00 1 Nellore Providing Internal CC Road in Bit-1 of Kttubadipalem Girijana colony 0.15 5.00 2 Nellore Providing Internal CC Road in Bit-2 of Kttubadipalem Girijana colony 0.15 5.00

Total 0.30 10.00 1 Vizianagaram BT to the road from Gavarapalem BT Road to the Ramannapalem 2.00 80.00 2 Vizianagaram BT to the road from 27/6 Km C B road to Cheedipalem 1.50 60.00 3 Vizianagaram BT to the road from Mettapakem to Gadilalova 2.50 200.00 4 Vizianagaram BT to the road from Dabbagunta to Pallapudungada 8.00 800.00 5 Vizianagaram BT to the road from boddam - Kg Pudi road to gadabavala 2.70 120.00 6 Vizianagaram BT to the road from Kg Pudi to Sangamvalasa (Balance Part) 1.10 150.00 7 Vizianagaram BT to the road from Ksanjeevimetta to Kadhakonda 4.00 200.00 8 Vizianagaram BT to the road from VK Road to Chinnamannipalem 1.60 50.00 9 Vizianagaram BT to the road from Kothavalasa - gidijala Road to tammanna Merakulu 0.60 30.00

10 Vizianagaram BT to the road from Rangayarayapuram to Venkannapalem 0.80 50.00 Total 1740.00

Page 40: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

ANNEXURE 5.4 Alternate proposals in Upgradation of NREGS (TSP) in sanctioned GOs

District Sl

. No

in th

e G.

O

No

of w

orks

in

Orig

inal

GO

Original Sanction work

G.O. Rt.No

Est.Cost Rs in Lakhs

Reasons for proposing Alternate

works

No

of

Alte

rnat

e w

orks

Alternate work Proposed

Est.Cost Rs in Lakhs

Remarks

Ananthapuram 1 1 Upgradation of road from KP Doddi to 75 Veerapuram

323 dt. 31.03.16 143.00 Population is

less than 40% 1

Upgradation of road from D.Hirehal -Malpanagudi road to H.S thanda in Km 2/2 to 6/5

153.00 Govt have

issued GO No. 588 dt.

30.08.2017 duly

sanctioning 2 works as against 3 works.GO

copy enclosed.

Ananthapuram 2 2 Upgradation of road from KP Doddi to Adiguppa

323 dt. 31.03.16 75.00 Population is

less than 40% 2 Upgradation of road from Mechiri to Mallapuram thanda

130.00

Ananthapuram 3 3

Upgradation of road from Rayadurg-Bhupasamudram road to Yerrampalli

323 dt. 31.03.16 65.00 Population is

less than 40% 4

Upgradation of road from Gandhodivaripalli - Yerraguntlapalli road to Thulasinaik thanda

112.00

Ananthapuram 6 5

Upgradation of road from Nayanakota thanda to Nayanakota (v)

323 dt. 31.03.16 74.00 Change of

nomenclature 5 Upgradation of road from Bonthalapalli to Nayanakota thanda

74.00

Vizianagaram 169 6

Road from Veduruwada R&B Road to K.Karrivanupalem

323 dt. 31.03.16 338.00 Upgradation

of NREGS 6 Road from Veduruwada R&B Road to Mulapadu

338.00

Vizianagaram 171 7 Road from Chamalapalli to Venkayyapalem

323 dt. 31.03.16 150.00 Upgradation

of NREGS 7 Road from Sanjeevimetta to Kadakonda

163.00

Srikakulam 134 8 Maredukota road 3/4 Km to SavaraCheedipalem

323 dt. 31.03.16 51.00

8

Meliaputti Nowpada road to Deenabandhupuram

51.00

Page 41: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

District

Sl. N

o in

the

G.O

No

of w

orks

in

Orig

inal

GO

Original Sanction work

G.O. Rt.No

Est.Cost Rs in Lakhs

Reasons for proposing Alternate

works

No

of

Alte

rnat

e w

orks

Alternate work Proposed

Est.Cost Rs in Lakhs

Remarks

Srikakulam 139 9 Approach road from Karakalavalasa to ST Makivalasa

323 dt. 31.03.16 154.00

9 Road from Marrivalasa

to S.T.Makivalasa 154.00

Krishna 85 10

Providing BT to road from Burugagudem to Thammileru Project via Pothanaplli

323 dt. 31.03.16 15.00 Alternate

proposed 10

Providing BT to the road from NG road to Hatiaya Thanda of Venkatayapalem in Nuavid (M)

15.00

Govt have issued GO No.

588 dt. 30.08.2017

duly sanctioning

the alternate work. GO copy

enclosed.

Guntur 67 11

Providing Road from ZP Road to Vazalapadu via papireddy kunta in Veldurthy Mandal

323 dt. 31.03.16 150.00

Sanctioned under CRR TSP and completed

11

Providing BT to the Road from Gangalakunta to Ramachandrapuram Thanda H/o Gangalakunta GP in Veldurthy(M)

150.00

Kadapa 215 12

CK Road to Elagapally (via) Cheruvumundrapalli of Ramapuram(M)

323 dt. 31.03.16 88.00 Population

less than 40% 12

CK road - Moolapalli road (R&B) to Yanadi Colony of Ramapuram (M)

75.00

SPSR Nellore 120 13

Approach road from Velupodu-Mabbuguntapalem to Narayana puram STColony

323 dt. 31.03.16 67.50

Not satisfying the ST population of more than 40%

13

Approach road to Kattubadipalem GC of Kattubadipalem GP in Dagadarthi (M)

67.50 Govt have issued GO No.

588 dt. 30.08.2017

duly

Page 42: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

District

Sl. N

o in

the

G.O

No

of w

orks

in

Orig

inal

GO

Original Sanction work

G.O. Rt.No

Est.Cost Rs in Lakhs

Reasons for proposing Alternate

works

No

of

Alte

rnat

e w

orks

Alternate work Proposed

Est.Cost Rs in Lakhs

Remarks

SPSR Nellore 121 14

Approach road from Madras-Calcatta road to Ananthavaram ST Colony

323 dt. 31.03.16 60.00

Transefered to R& B departement

14

Approach road from Chennayapalem road to Akuthota ST colony of Kavali (M)

60.00 sanctioning the alternate

works.GO copy enclosed.

Kurnool 90 15

Providing BT road from KG road to Shantinilayam of Pamulapadu(M)

323 dt. 31.03.16 90.00

No ST population in the Village Shantinilayam.

15 Providing Approach road to Jangampadu of Nandikotkur (M).

90.00

Proposed by Sri. Mandra Sivananda Reddy, TDP Incharge,

Nandikotkur Constituency.

Visakhapatnam 140 16

Upgradation up to BT surface rom Approach road to Velagapudi H/o Amalapuram

323 dt. 31.03.16 64.00

Sanctioned under APDRP Batch 1

16 Thallapalem to Vadaparthy road in Golugonda (M)

90.00

Visakhapatnam 141 17

Upgradation up to BT surface Madhavanagaram to Thallapalem

323 dt. 31.03.16 80.00

Sanctioned under APDRP Batch 1

17

Upgradation of Road from Waddadi Paderu R & B Road at 16/2 Km to BillalaPalem of Madugula mandal

75.00

Visakhapatnam 148 18

Upgradation up to BT surface Chammachinta – Sarugudu R&B road to K.V. Sarabhapalem

323 dt. 31.03.16 60.00 Sanctioned

under CRR TSP 18 PMD Palem to Parasada in Golugonda (M)

44.00

Page 43: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

District

Sl. N

o in

the

G.O

No

of w

orks

in

Orig

inal

GO

Original Sanction work

G.O. Rt.No

Est.Cost Rs in Lakhs

Reasons for proposing Alternate

works

No

of

Alte

rnat

e w

orks

Alternate work Proposed

Est.Cost Rs in Lakhs

Remarks

Visakhapatnam 152 19

Upgradation of Road to BT Standerds from GPY road to Thammayyapeta

323 dt. 31.03.16 100.00

not eligible (No &ST population)

19

Upgradation upto BT surface from Suddalapalem to Addalova of Golugonda (M)

30.00

Visakhapatnam 153 20

Upgradation of Road to BT Standerds from MJPuram R&B road to Narendrapuram

323 dt. 31.03.16 70.00

Sanctioned under NABARD XXI

20

Upgradation upto BT standards from Kodavatipudi to Kondandarampuram of Kotavurtla (M)

135.00

20 works

2116.50 Lakhs 20 works 2116.50 Lakhs

Page 44: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Annexure-5.5

REGION WISE DETAILS OF PROPOSED ROUTES FOR OPERATION ON TRIBAL AREAS FOR THE YEAR 2017-18

PROPOSALS OF NEC REGION

SL NO DEPOT FROM TO ROUTE COURCE BUSES 1 SKT S.KOTA VAVILAPADU VEPADA, VEELUPARTI 1 2 SKT S.KOTA VALASI DAMUKU, NIMMALAPADU 1 3 SKT S.KOTA DEVARAPALLI K.G.PUDI, SAMARABBA 1 4 PPM G.L.PURAM POLSMGUDA PANASABADRA,PODISSA,SOBA 1 5 PPM PARVATHIPURAM VELAGAVALASA GANGAPURAM,TELUNAIDUPETA,MULAGA 1 6 PPM PARVATHIPURAM SARVAPADU PEDAKERJALA,CHINAKERJALA 1 7 SLR SALUR ALURU PACHIPENTA,KOTIKAPENTA,KESALI,MODAVALASA 1 8 SLR SALUR SAMBARA PULLERUVALASA,BANTUMAKKUVA,CHEMUDU 1 9 PLS PLS BATHUPURAM HARIPURAM,PORLA,DESIRAMACHANDRAPURM 1

10 PLKD PALAKONDA ANTIKONDA SEETAMPETA,MOGADARA,GHATI,GUMADA,TAMARALLI 1 11 PLKD PALAKONDA KEDARIPURAM SEETAMPETA,DONUBAI,POLLA,NEELAKANTAPURAM,G.L.PURAM 1 12 PLKD PALAKONDA POLLA NAVAGAM,VEERAGATTAM,CHINAGORA 1 13 PLKD PALAKONDA SAMBAM KUSUMI JN., KODISA 1

TOTAL 13 PROPOSALS OF EAST GODAVARI REGION

1 GKVM KUNAVARAM CHINTUR REKHAPALLI 2 2 GKVM KUNAVARAM CHINTUR SELERU 1 3 GKVM GOKAVARAM PIDATHAMAMIDI NELLIPUDI 1 4 GKVM GOKAVARAM RAMPACHODAVARAM

2

5 GKVM GOKAVARAM KOTA RAMPACHODAVARAM 1 6 GKVM GOKAVARAM PATAH KOTA RAMPACHODAVARAM 1 7 GKVM GOKAVARAM RAMPACHODAVARAM ADDATEEGALA 1 8 GKVM GOKAVARAM VEMULAKONDA KORUKONDA 1 9 GKVM GOKAVARAM DEVIPATNAM RAMPACHODAVARAM 1

10 GKVM GOKAVARAM ADDATEEGALA

2 11 GKVM ELESAWARAM RAJAHMUNDRY T. LAKSHMIPURAM 1

Page 45: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

SL NO DEPOT FROM TO ROUTE COURCE BUSES 12 GKVM ELESAWARAM Y.RAMAVARAM

1

13 GKVM ELESAWARAM RAJAVOMANGI VANTANGI, G.V.PALEM 1 TOTAL

16

PROPOSALS OF KURNOOL REGION 1 ATKR ATHMAKURU SRISAILAM BIRLUTI, CHINTALA 2 2 ATKR ATHMAKURU KOLANUBHARATI CHENCHUGUDEAM, J.GUDEM 2 3 ATKR ATHMAKURU S KOTTALA VEMPENTA 1 4 ATKR ATHMAKURU GUVVALAKUNTA PALEM INDRESWARAM 1

TOTAL 6 PROPOSALS OF WEST GODAVARI REGION

1 KOVVUR BHADRACAHLAM POLAVARAM KOKKUNUR, JRG, K. GUDEM 1 2 KOVVUR KOIDA RAJAHMUNDRY VELERPADU, KKNR, RJY 1 3 KOVVUR SIVAGIR RAJAHMUNDRY POLAVARAM, KOVVUR 1 4 JRG RUDRAMKOTA RAJAHMUNDRY VELERPADU, KKNR, A.R PET 1 5 NDD NIDADAVOLU TEKUR TALLAPURI, POLAVARAM 1

TOTAL

5 CORPORATION TOTAL

40

Page 46: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Annexure-6.8 (A) Works pertaining to PR Engineering Department

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

1 Polavaram

Polavaram Saripallikunta L.N.D Peta to Saripallikunta 100.00

100.00

2 Polavaram

Buttayagudem lankapalli Road from Kammayakunta

to lankapalli 50.00

50.00

3 Polavaram

Jeeligumilli

P.Cheemalavarigudem(Via) K.Cheemalavarigudem

Dhrbhagudem-Vankavarigudem road to P.Cheemalavarigudem(Via)K.Cheemalavarigudem

75.00

75.00

4 Tekkali Nandigam Battupuram

Providing B.T road from Gatepeta to Damara Jn Via Pedakaderi of Tekkali Mandal

90.00

90.00

5 Tekkali Tekkali Pedakedari

Providing B.T road from Naidupolu road to Battupuram(balance length of 1.30 KM)

100.00

100.00

6 Vemuru Amarthuluru Panchalavaram Providing CC to Internal

roads in ST Location 15.00

15.00

7 Vemuru Amarthuluru Moparru Providing CC to Internal

roads in ST Location 6.00

6.00

8 Vemuru Amarthuluru Pedapudi Providing CC to Internal

roads in ST Location 15.00

15.00

9 Vemuru Amarthuluru Mulpuru Providing CC to Internal

roads in ST Location 10.00

10.00

10 Vemuru Amarthuluru Inturu Providing CC to Internal

roads in ST Location 35.00

35.00

11 Vemuru Amarthuluru Amarthaluru Providing CC to Internal

roads in ST Location 5.00

5.00

12 Vemuru Amarthuluru Govada Providing CC to Internal

roads in ST Location 25.00

25.00

13 Vemuru Vellaturu Vellaturu Providing CC to Internal roads in Vellaturu ST Colony North

50.00

50.00

14 Vemuru Vellaturu Vellaturu Providing CC to Internal roads in Vellaturu ST Colony South

50.00

50.00

15 Vemuru Pallekona Pallekona Providing CC to Internal roads in ST Colony 5.00

5.00

16 Vemuru Allamudi Allamudi Providing CC to Internal roads in ST Colony 5.00

5.00

Page 47: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

17 Vemuru Bhattiprolu Bhattiprolu Providing Internal CC roads

in Bhattiprolu ST Colony 5.00

5.00

18 Vemuru Ilavaram Ilavaram Providing Internal CC roads in Ilavaram ST Colony 6.50

6.50

19 Vemuru Surepalli Surepalli Providing Internal CC roads in Surepalli ST Colony 20.00

20.00

20 Vemuru Kolluru Kolluru Providing CC to Internal roads in ST Colonies 30.00

30.00

21 Vemuru Kolluru Kolluru Providing CC to Internal roads in ST Colonies -2,3,4&5

40.00

40.00

22 Vemuru Anathavaram Anathavaram Providing CC to Internal

roads in ST Colony 35.00

35.00

23 Vemuru Epuru Epuru Providing CC to Internal roads in ST Colony 10.00

10.00

24 Vemuru Ravikampadu Ravikampadu Providing CC to Internal

roads in ST Colony 7.00

7.00

25 Vemuru AB Nagar AB Nagar Providing CC to Internal roads in ST Colonies 20.00

20.00

26 Vemuru Nadigaddapalem

Nadigaddapalem

Providing CC to Internal roads in ST Colonies 20.00

20.00

27 Vemuru Chinaparimi Chinaparimi Providing CC to Internal

roads in ST Colony 25.00

25.00

28 Vemuru Modukuru Modukuru Providing CC to Internal

roads in ST Colony - 1 20.00

20.00

29 Vemuru Modukuru Modukuru Providing CC to Internal

roads in ST Colony - 2 20.00

20.00

30 Vemuru Pothumarru Pothumarru Providing CC to Internal

roads in ST Colonies 50.00

50.00

31 Vemuru Balijepalli Balijepalli Providing CC to Internal roads in ST Colony 30.00

30.00

32 Vemuru Chavali Chavali Providing CC to Internal roads in ST Colony 20.00

20.00

33 Bapatla Bapatla Mahatmajipuram

Providing CC road from Talapala vani shop to Yatagiri Venkateswarlu(H) inMahatmajipuram H/o of west Bapatla village in Bapatla Mandal

0.69 1.91 2.60

34 Bapatla Bapatla Mahatmajipuram

Providing CC road from Talapala vani shop to Railway track Road inMahatmajipuram H/o of west Bapatla village in Bapatla Mandal

0.45 1.05 1.50

Page 48: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

35 Bapatla Bapatla Mahatmajipuram

Providing CC road from Yatagiri Venkateswarlu(H) to Railway track cross road inMahatmajipuram H/o of west Bapatla village in Bapatla Mandal

0.48 1.12 1.60

36 Bapatla Bapatla Mahatmajipuram

Providing CC road from Jampani.Seshadri(H) to Vantineni.Guruswamy(H) inMahatmajipuram H/o of west Bapatla village in Bapatla Mandal

1.05 2.45 3.50

37 Bapatla Bapatla Mahatmajipuram

Providing CC road from Jampani.Seshadri(H) to Railway track cross road in Mahatmajipuram H/o of west Bapatla village in Bapatla Mandal

0.30 0.70 1.00

38 Bapatla Bapatla Mahatmajipuram

Providing CC road from Tupakula srinivasarao(H) Railway track cross road in Mahatmajipuram H/o of west Bapatla village in Bapatla Mandal

0.60 1.40 2.00

39 Bapatla Bapatla Mahatmajipuram

Providing CC road from PHC center toRailway track road in Mahatmajipuram H/o of west Bapatla village in Bapatla Mandal

0.60 1.40 2.00

40 Bapatla Bapatla Mahatmajipuram

Providing CC road from PHC center to Rapuri.Subba rao (H) inMahatmajipuram H/o of west Bapatla village in Bapatla Mandal

3.20 4.80 8.00

41 Bapatla Bapatla Mahatmajipuram

Providing CC road from Yatagiri.Srinivasarao (H) to anand boys hostal in Mahatmajipuram H/o of west Bapatla village in Bapatla Mandal

3.20 4.80 8.00

42 Bapatla Bapatla Mahatmajipuram

Providing CC road from R&B road to Potluri Srinu(H) in Mahatmajipuram H/o of

1.35 3.15 4.50

Page 49: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

west Bapatla village in Bapatla Mandal

43 Bapatla Bapatla Mahatmajipuram

Providing CC road from R&B road to Indla.Srinivasarao(H) in Mahatmajipuram H/o of west Bapatla village in Bapatla Mandal

1.35 3.15 4.50

44 Bapatla Bapatla Mahatmajipuram

Providing CC road from R&B road to Parukuri.Venkateswarlu(H) in Mahatmajipuram H/o of west Bapatla village in Bapatla Mandal

1.35 3.15 4.50

45 Bapatla Bapatla Mahatmajipuram

Providing CC road from R&B road to Chevuri.sarojini(H) in Mahatmajipuram H/o of west Bapatla village in Bapatla Mandal

1.35 3.15 4.50

46 Bapatla Bapatla Mahatmajipuram

Providing CC road from R&B road to A.Bramaiah(H) in Mahatmajipuram H/o of west Bapatla village in Bapatla Mandal

1.35 3.15 4.50

47 Bapatla Bapatla Kukkalavaripalem

Providing CC road from Narendra swamy Ankamma Talli temple toThupakula.Kondalu (H) in Kukkalavaripalem H/o of west Bapatla village in Bapatla Mandal

2.10 2.90 5.00

48 Bapatla Bapatla Kukkalavaripalem

Providing CC road from Namburi.Venkateswarlu(H) to Yatagiri.Naga raju (H) in Kukkalavaripalem H/o of west Bapatla village in Bapatla Mandal

2.70 6.30 9.00

49 Bapatla Bapatla Kukkalavaripalem

Providing CC road fromThupakula.Koteswarao(H) to Namburi.Srinivasarao(H) in Kukkalavaripalem H/o of west Bapatla village in Bapatla Mandal

1.80 4.20 6.00

Page 50: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

50 Bapatla P.V.PALEM

Satyanarayanapuram ST Colony)

Providing CC Road from Sai Satya raju (H) to Yatha Giri venkayya (H) in Satyanarayana PuramST Colony of Alakapuram (V) of P.V.Palem (M)

0.35 3.15 3.5

51 Bapatla P.V.PALEM

Satyanarayanapuram ( ST Colony)

Providing CC road from Maturi Annapurnamma(H) to Alluri Prasad (H) in Satyanarayana Puram ST colony of Alakapuram (V) o fP.V.Palem (M)

0.39 3.51 3.90

52 Bapatla P.V.PALEM

Satyanarayanapuram ( ST Colony)

Providing CC road from Rapuri Srinivasa Rao (H) to Thupakula Nagadram (H) in SatyaNarayana Puram ST Colony of Alakapuram (V) of P.V.Palem (M)

0.33 2.97 3.30

53 Bapatla P.V.PALEM

Alakapur (ST Colony )

Providing CC road from Rapuri Siddaiah (H) to Ella Subba Rao (H) in Satya narayana Puram ST Colony of Alakapuram (V) of P.V Palem

0.33 2.97 3.30

54 Bapatla P.V.PALEM

Alakapur (ST Colony )

Providing Cc road from rapuri Narasimha Swami (H) to Yatagiri Srinivasa rao (H) in Satyanarayana Puram ST Colony Of Alakapuram (V) of P.V.Palem (M)

0.33 2.97 3.30

55 Bapatla P.V.PALEM

Alakapur (ST Colony )

Providing CC Raod From Sykam Alluriah (H) to Yatsagiri Venkateswaara rao (H) in Satyanarayana Puram ST Colony of Alakapuram (V) of P.V.Palem (M)

0.17 1.53 1.70

56 Bapatla Bapatla Marripudi (ST Colony )

Providing CC raod fdrom R&B road to komara Giri Pothulu (H) in ST Colony of Marripudi (V) in Bapatla (M)

0.95 8.55 9.50

57 Bapatla Karlapalem

Perali (ST Colony)

Providing approch CC road from R&B road at Cyclone 3.00 7.00 10.00

Page 51: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

shelter to ST Colony (SS Tank) in perali (V) of Karlapalem (M)

58 Bapatla Karlapalem

Perali (ST Colony)

Providing CC road from ST Colony to ZPHS in Perali (V) of Karlapaelm

6.00 14.00 20.00

59 Bapatla Bapatla CJ Palem (ST Colony )

providing CC Raod from ST Colony of Cheruvujammulapalem (V) in Bapatla (M)

6.00 14.00 20.00

60 Bapatla Bapatla Kanakatapalem (ST Colony )

Providing internal CC Raod in St Colony of Kankatapalem (V) in Bapatla (M)

6.00 14.00 20.00

61 Bapatla PV Palem Chandole(ST Colony )

Providing internal CC road in ST colony of Chandole (V) lin Bapatla (M)

6.00 14.00 20.00

62 Bapatla Bapatla Mulapalem

Providing CC Drains in Vennekantinagar H/O Mulapalem (V) in Bapatla (M)

2.00 18.00 20.00

63 Bapatla Karlapalem Narravaripalem

Providing Internal CC Raods in ST Colony of Narravaripalem (V) of Karlapalem (M)

1.00 9.00 10.00

64 Bapatla Karlapalem Tummalapalli

Providing internal CC Roads in Jwalagramam ST Colony of Thummalapalli Village.

1.00 9.00 10.00

65 Bapatla Karlapalem Tummalapalli

Providing CC Road from Akkala Durgareddy (h) to Akkala Lakshmi (h) in Thummalapalli Village.

1.00 9.00 10.00

66 Bapatla Karlapalem Tummalapalli Nakkala Srinivasa Rao fields

in Thummalapalli(V). 1.00 9.00 10.00

67 Bapatla Karlapalem Tummalapalli

Providing internal CC Roads in Pothuraju ST Colony of Thummalapalli (V) .

1.00 9.00 10.00

68 Bapatla Karlapalem

Pathanandayapalem

Providing internal CC Roads in ST Colony of Pathandayapalem Village.

1.00 9.00 10.00

69 Bapatla Karlapalem

Nallamothuvaripalem

Providing internal CC Roads in ST Colony of Nallamothuvaripalem Village

1.00 9.00 10.00

Page 52: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

70 Bapatla Karlapalem

Nallamothuvaripalem

Providing CC Road from Peddintamma Temple to Tiruveedhula Manimma (h) in Nallamothuvaripalem Village.

0.60 5.40 6.00

71 Bapatla Karlapalem Chintayapalem

Providing internal CC Raods in ST colony of Chintayapalem Village.

3.00 7.00 10.00

72 Bapatla Karlapalem Chintayapalem

Providing CC Road Ganapavaram R&B road to Gunnam Venkayyamma(h) in Chintayapalem Village.

3.00 7.00 10.00

73 Bapatla Karlapalem Pedagollapalem

Providing internal CC Roads in ST colony of Gandhi Yanadhi Sangam habitation of Pedagollapalem GP.

3.00 7.00 10.00

74 Bapatla Karlapalem Pedagollapalem

Providing CC Road from R&B road to Chelam Charla Nagendram(h) in Gandhi Yanadhi Sangam habitation of Pedagollapalem GP.

2.40 5.60 8.00

75 Bapatla Karlapalem Pedagollapalem

Providing internal CC Road in ST colony of Pedagollapalem GP.

2.40 5.60 8.00

76 Bapatla Karlapalem Ganapavaram

Providing internal CC roads in Urlammasangam of Ganapavaram GP.

1.50 3.50 5.00

77 Bapatla Karlapalem Ganapavaram

Providing internal CC Roads in Kesavapuri colony Habitation of Ganapavaram GP.

3.00 7.00 10.00

78 Bapatla Karlapalem Ganapavaram

Providing internal CC roads in Devudu Manyam colony of Ganapavaram GP.

6.00 14.00 20.00

79 Bapatla Karlapalem Yazali

Providing CC road from SC colony Elementary School to ST colony Anganwadi School in Yazili Village.

0.70 6.30 7.00

80 Bapatla Karlapalem Karlapalem

Providing internal CC roads in Satyavathipeta H/o Karlapalem GP.

5.00 5.00 10.00

81 Bapatla Karlapalem Karlapalem

Providing internal CC Roads in Tarakarama ST Colony Habitation Of Karlapalem GP.

5.00 5.00 10.00

Page 53: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

82 Bapatla Bapatla Stuvartpuram

Providing CC Roads from Nagendramma putta to Talluri. Yedalaiah (H) in Vruksha of Stuvartpuram village of Bapatla (M)

1.98 4.62 6.60

83 Bapatla Bapatla Stuvartpuram

Providing CC Roads from Nagendramma Putta to Bojja.Anjamma (H) in Vruksha Nagar f Stukvartparam village of Bapatla (M)

0.90 2.10 3.00

84 Bapatla Bapatla Stuvartpuram

Providing CC road from Bojja. Anjamma (H) to Endeti. Chitamma (H) in Vruksha Nagar of Stuvartpuramvillage of Bapatla (M)

1.88 4.38 6.25

85 Bapatla Bapatla Stuvartpuram

Providing CC Road from Bojja. Anjamma (H) to Elukri. Chinnammai (H) in Vruksha Nagar of Stuvartpuram(V), Bapatla (M)

2.25 5.25 7.50

86 Bapatla Bapatla Stuvartpuram

Providing CC Road from Dammu. Mariya (H) to Kavala. Sukumari (H) Vruksha Nagar, Stuvatpuram(V), Bapatla (M)

0.90 2.10 3.00

87 Bapatla Bapatla Stuvartpuram

Providing CC road from Srugara Pradhana Mandiram to Cettupalli .Purna (H) in Vruksha Nagar of Stuvatpuram Village of Bapatla (M)

0.90 2.10 3.00

88 Bapatla Bapatla Stuvartpuram

Providing CC Road from Seeyonu Pradhana Mandiram to Srugara Pradhana Mandiram in Vruksha Nagar of Stuvartpuram Village of Bapatla (M)

2.40 5.60 8.00

89 Bapatla Bapatla Stuvartpuram Providing CC Road from Sriramula.Sundarao (H) to Anjeti. Murali (H) iln

1.425 3.325 4.75

Page 54: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

Stuvartpuram village of Bapatla (M)

90 Bapatla Bapatla Stuvartpuram

Provding CC Road from Chinapothula. Venkatarathanam (H) to Botchu. Bhaskara rao (H) in Stuvartpuram village of Bapatla (M)

1.56 3.64 5.20

91 Bapatla Bapatla Stuvartpuram

Providing CC Road from Uyyala.Anand (H) to Vallabha .Jhansi (H) in Stuvartpuram village of Bapatla (M)

1.425 3.325 4.75

92 Bapatla Bapatla Stuvartpuram

Providing CC Road from Uyyala.Ramachandraiah (H) to vallabha . Venkataiah (H) in Stuvartpuram village of Bapatla (M)

1.425 3.325 4.75

93 Bapatla Bapatla Stuvartpuram

Providing CC Road from Seeyonu Pradhana Mandiram to P.Ravi kumar (H) in Stuvartpuram village of Bapatla (M)

1.425 3.325 4.75

94 Bapatla Bapatla Stuvartpuram

Providing CC Raod from Gutti.Sujatha (H) to Bogini.Vanaja (H) in Stuvartpuram Village of Bapatla (M)

1.20 2.80 4.00

95 Bapatla Bapatla Stuvartpuram

Providing CC Road from R&B Road to Devarakonda. Vasanthkumar (H) in Stuvartpuram village of Bapatla (M)

1.425 3.325 4.75

96 Bapatla Bapatla Stuvartpuram

Providing CC Road from Ballani. Ribka (H) to Ch.Praveen (H) in Stuvartpuram village of Bapatla (M)

1.20 2.80 4.00

97 Bapatla Bapatla Stuvartpuram

Providing CC Road from Valla.Giri (H) to Tavati. Satyanarayana (H) in Stuvartpuram Village of Bapatla (M)

0.75 1.75 2.50

98 Bapatla Bapatla Stuvartpuram Providing CC Roads from Ballari.Ribka (H) to Church 1.425 3.325 4.75

Page 55: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

Gate in Stuvartpuram village of Bapala (M)

99 Bapatla Bapatla Stuvartpuram

Providing CC Roads from Devara.Srinu(H) to K.Paul (H) in Stuvartpuram village of Bapatla (M)

1.725 4.025 5.75

100 Bapatla Bapatla Stuvartpuram

Providing CC Road from Gajjala.Syamul(H) to Fellowship Church gate in Stuvartpuram village of Bapatla (M)

2.85 6.65 9.50

101 Bapatla Bapatla Stuvartpuram

Providing CC Road from Fellowship Church Gate to Uyyala.Aron (H) in stuvartpuram village of Bapatla (M)

2.25 5.25 7.50

102 Bapatla Bapatla Stuvartpuram

Providing CC Roads from Ragala.Santhi(H) to Naraboinsa . Aseervadam (H) in Stuvartpuram village of Bapatla (M)

2.25 5.25 7.50

103 Bapatla Bapatla Stuvartpuram

Providing CC Road to Madigani.Ajaya Babu (H) to Devara .Butalamma (H) to in Stuvartpuramvillage of Bapatla (M)

1.425 3.325 4.75

104 Bapatla Bapatla Stuvartpuram

Provioding CC Road from Bojja.Anjamm a(H) to Dova .Vijaya Chandra (H) in Stuvartpuram village of Bapatla (M)

1.425 3.325 4.75

105 Bapatla Bapatla Stuvartpuram

Providing CC Road from R&B Road to Pole .Ramulu (H) in stuvartpuram village of Bapatla (M)

1.425 3.325 4.75

106 Vinukonda

Savalyapuram Savalyapuram Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

107 Vinukonda

Savalyapuram Velpuru Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

108 Vinukonda Nuzendla Mukkellapadu Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

109 Vinukonda Nuzendla Uppalapadu Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

110 Vinukonda Bollapalli Papayapalem Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

Page 56: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

111 Vinukonda Bollapalli Mekaladinne Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

112 Vinukonda Bollapalli Chakrayapalem Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

113 Vinukonda Bollapalli Hanumapuram Providing Internal CC Roads

in ST colonies. 12.00 12.00 24.00

114 Vinukonda Bollapalli Rajanayak

Thanda Providing Internal CC Roads in ST colonies. 10.00 10.00 20.00

115 Vinukonda Bollapalli Reddypalem Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

116 Vinukonda Bollapalli Lalipuram Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

117 Vinukonda Bollapalli Remidicherla

Thanda Providing Internal CC Roads in ST colonies. 10.00 10.00 20.00

118 Vinukonda Bollapalli Gandiganumala Providing Internal CC Roads

in ST colonies. 12.00 12.00 24.00

119 Vinukonda Bollapalli Pai Thanda Providing Internal CC Roads

in ST colonies. 10.00 10.00 20.00

120 Vinukonda

Vinukonda Koppukonda Providing Internal CC Roads

in ST colonies. 15.00 15.00 30.00

121 Vinukonda

Vinukonda

Nagireddypalem

Providing Internal CC Roads in ST colonies. 10.00 10.00 20.00

122 Vinukonda Ipur Gundepalli Providing Internal CC Roads

in ST colonies. 12.00 12.00 24.00

123 Vinukonda Ipur Angaluru

Thanda Providing Internal CC Roads in ST colonies. 10.00 10.00 20.00

124 Vinukonda Ipur Rangapuram

Thanda Providing Internal CC Roads in ST colonies. 10.00 10.00 20.00

125 Araku Pedabayalu Seethagunta GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

126 Araku Pedabayalu Pedabayalu GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

127 Araku Pedabayalu Rayimamidi GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

128 Araku Pedabayalu Tamavaram GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

129 Araku Pedabayalu Gomangi GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

130 Araku Pedabayalu Lakshmipeta GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

131 Araku Pedabayalu Vaddikodaputtu GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

132 Araku Pedabayalu Lumatangi GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

133 Araku Pedabayal Bogatam GIRI SAMUDAYA BHAVAN 5.00

5.00

Page 57: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

u (Community halls)

134 Araku Pedabayalu Booruguveedhi GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

135 Araku Pedabayalu Maggam Veedhi GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

136 Araku Munchigputtu Munchingputtu GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

137 Araku Munchigputtu Lakshmipuram GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

138 Araku Munchigputtu Biraguda GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

139 Araku Munchigputtu Kumbirpada GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

140 Araku Munchigputtu Gorrelametta GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

141 Araku Munchigputtu Kudutula GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

142 Araku Munchigputtu Chekuchinta GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

143 Araku Munchigputtu Darela GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

144 Araku Munchigputtu Pedaguda GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

145 Araku Munchigputtu Vankaraguda GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

146 Araku Araku R.K. Nagar GIRI SAMUDAYA BHAVAN (Community halls) 5.00

5.00

147 Araku Araku Borraguda GIRI SAMUDAYA BHAVAN (Community halls) 5.00

5.00

148 Araku Araku Araku GIRI SAMUDAYA BHAVAN (Community halls) 5.00

5.00

149 Araku Dumbriguda Kitangi GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

150 Araku Dumbriguda Guntaseema GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

151 Araku Dumbriguda Kandram GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

152 Araku Dumbriguda Sagara GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

153 Araku Dumbriguda Gasaba GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

154 Araku Dumbriguda Korra GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

155 Araku Dumbriguda Sovva GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

Page 58: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

156 Araku Dumbriguda Sukuraputtu GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

157 Araku Dumbriguda Puttabanda GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

158 Araku Dumbriguda Jakaraguda GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

159 Araku Dumbriguda Lyganda GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

160 Araku Dumbriguda Laveru GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

161 Araku Hukumpeta Liviti GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

162 Araku Hukumpeta Kottari GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

163 Araku Hukumpeta Uppa GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

164 Araku Hukumpeta Olda GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

165 Araku Hukumpeta Y. Bakuru GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

166 Araku Hukumpeta Teekumaddela GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

167 Araku Hukumpeta Pedagaruvu GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

168 Araku Hukumpeta Panasaputtu GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

169 Araku Hukumpeta Egarandi GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

170 Araku Hukumpeta Teegalavalasa GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

171 Araku Hukumpeta Tadigiri GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

172 Araku Hukumpeta Mulusobha GIRI SAMUDAYA BHAVAN

(Community halls) 5.00

5.00

173 Repalle Cherukupalli Arumbaka Internal CC Road in ST

Colony of Arumbaka G.P. 3.00 7.00 10.00

174 Repalle Cherukupalli Gullapalli Internal CC Road in ST

Colony of Gullapalli G.P. 3.00 7.00 10.00

175 Repalle Cherukupalli Ponnapalli Internal CC Road in ST

Colony of Ponnapalli G.P. 3.00 7.00 10.00

176 Repalle Cherukupalli Gudavalli Internal CC Road in ST

Colony of Gudavalli G.P. 3.00 7.00 10.00

177 Repalle Nagaram Boramadigapalli Internal CC Road in ST colony of Boramadigapalli G.P

2.00 18.00 20.00

Page 59: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

S. NO

CONSTITUENCY MANDAL VILLAGE WORK DESCRIPTION

AMOUNT IN LAKHS

TSP MGNREGS TOTAL

178 Repalle Nagaram Siripudi Internal CC Road in ST colony of Siripudi G.P 3.00 7.00 10.00

179 Repalle Nagaram Pudivada Internal CC Road in ST Colony of Pudivada G.P 3.00 7.00 10.00

180 Repalle Nagaram Dhulipudi Internal CC Road in ST colony of Dhulipudi G.P 5.00 0.00 5.00

181 Repalle Nizampatnam Nizampatnam

Internal CC Road in ST colony of Pamarthi of Nizampatnam G.P

5.00 0.00 5.00

182 Repalle Nizampatnam Pallapatnam Internal CC Road in ST

colony of Pallapatnam G.P 1.50 3.50 5.00

183 Repalle Nizampatnam Adavuladeevi Internal CC Road in

Adavuladeevi G.P 3.00 7.00 10.00

184 Repalle Nizampatnam Amudalapalli

Internal CC Road in ST colony of Bapaiahnagar in Amudalapalli G.P.

3.00 7.00 10.00

185 Repalle Repalle Tummala Internal CC Road in ST colony of Tummala G.P 6.00 14.00 20.00

186 Repalle Repalle Potumeraka Internal CC Road in ST colony of Potumeraka G.P 1.50 3.50 5.00

187 Repalle Repalle Piratlanka Internal CC Road in ST colony of Piratlanka G.P 3.00 7.00 10.00

188 Repalle Repalle Peteru Internal CC Road in ST colony of Peteru G.P 3.00 7.00 10.00

Total Amount (In Lakhs ) 1622.69 695.065 2317.75

Page 60: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Annexure-6.8 (B)

Works pertaining to R & B (Rural Roads) Department

S. No Constituency Mandal Village Name work Amount in

Lakhs

1 Vemuru Vemuru Beligepalli

Providing CC pavement in ST colonies in beligepalli village of vemuru – chavali Road under TSP scheme

50.00

2 Vemuru Amarthaluru Govada

Providing CC pavement in ST colonies in Govada village of Kuchipudi -Govada Road under TSP scheme

50.00

3 Vemuru Vemuru chavali Improvements to vemuru – chavali (R&B) Road to chavali ST colonies Road under TSP scheme

50.00

4 Vemuru Amarthaluru kuchipudi

Providing CC pavement in ST colonies in Kuchipudi village of Kuchipudi -Govada Road under TSP scheme

30.00

5 Vemuru Vemuru champadu Improvements to Tenali- vellaturu (R&B) road to champadu ST colonies Road under TSP scheme

95.00

6 Vemuru Amarthaluru Kuchipudi, Mulpur

Improvements to Kuchipudi- Mulpuru Road (R&B) to Mulpur ST colonies Road under TSP scheme

95.00

7 Vemuru Chunduru nadigaddivaripalem

Improvements to Angalakuduru–Dandamudi (R&B) Road to nadigaddivaripalem ST colonies Road under TSP scheme

100.00

8 Vemuru kolluru K.T colony Improvements to Krapa–Ananthavaram (R&B) Road to KT ST colonies Road under TSP scheme

50.00

9 Vemuru Bhattiprolu Chennakesava

Improvements to vellaturu –juvvalapalem (R&B) Road to Chennakesava ST colony under TSP scheme

80.00

10 Tenali Tenali kolakaluru

Providing CC pavement in ST colonies in kolakaluru village of Guntur-Hunumanupalem Road under TSP scheme

50.00

11 Tenali Tenali Angalakuduru

Providing CC pavement in ST colonies in kolakaluru village of Guntur-Hunumanupalem Road under TSP scheme

50.00

Total Amount in Lakhs 700.00

Page 61: Minutes of the 16th Nodal Agency Meeting for Schedule ...tsp.apcfss.in › files › 1613.pdf · Hon’ble Minister Sri Nakka Ananda Babu, Chairman, Nodal Agency & Hon’ble Minister

Annexure-6.8 (C)

Works pertaining to RWS&S Department

S. No Constituency Mandal Village Gram Panchayat Habitation Total

1 Vemuru Vemuru Vemuru Vemuru Augmentation of PWS Scheme 10.00

2 Vemuru Vemuru Chavali Chavali Augmentation of PWS Scheme 6.00

3 Vemuru Vemuru Peravali Peravali Extension of Pipe lines 6.00 4 Vemuru Vemuru Balijepalli Balijepalli New SVS 50.00 5 Vemuru Vemuru Champadu Champadu Extension of Pipe lines 3.00

6 Vemuru Vemuru Chadalawada Chadalawada Augmentation of PWS Scheme 6.00

7 Vemuru Tsunduru Nadigaddapalem Nadigaddapalem New SVS 50.00

8 Vemuru Tsunduru Ambedkar Nagar Ambedkar Nagar Augmentation of PWS Scheme 7.00

9 Vemuru Tsunduru Pedagadelavarru Pedagadelavarru Augmentation of PWS Scheme 6.00

10 Vemuru Tsunduru Tsunduru Tsunduru Extension of Pipe lines 3.00 11 Vemuru Tsunduru Manduru Manduru Extension of Pipe lines 6.00 12 Vemuru Tsunduru Modukuru Modukuru Extension of Pipe lines 6.00

13 Vemuru Tsunduru Valiveru Valiveru Augmentation of PWS Scheme 6.00

14 Vemuru Kolluru Ravikampadu Ravikampadu Extension of Pipe lines 10.00

15 Vemuru Amarthaluru Amarthaluru Amarthaluru Augmentation of PWS Scheme 20.00

16 Vemuru Bhattiprolu Vellaturu Vellaturu SVS to Vellatur ST colony 35.00

17 Vemuru Bhattiprolu Bhattiprolu Bhattiprolu Augmentation of PWS Scheme 3.00

Total

233.00