Minutes from the May 12, 2015 DDOT Meeting
Transcript of Minutes from the May 12, 2015 DDOT Meeting
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
1/30
Maryland
Avenue
Update Meeting
District Department of
Transportation
May 12, 2015
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
2/30
Tonight’s Agenda:
1. Recommended Concept Plan2. Process and Approach
3. Continued IncrementalImprovements
4. Timeline and Next Steps
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
3/30
Maryland Avenue Project Overview:
•Key issues from planning study: – High speeds & relatively low traffic volumes
– Pedestrian crash history
–
Lack of bike facility connectivity• Recommended Alternative- Road
Reconfiguration (Road Diet), with curb
extensions, landscaped median, left turnpockets, and bike lanes
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
4/30
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
5/30
31
-
45 MPH
95th percentile 26 - 40 MPH
85th percentile
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
6/30
Crash Trend on Maryland
Avenue, 2005-2012
3533
38
56
48
54
47
72
0
10
20
30
40
50
60
70
80
2005 2006 2007 2008 2009 2010 2011 2012
C r a s h e s p e r Y e a r
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
7/30
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
8/30
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
9/30
A Brief History of Maryland Ave. NE
• 12th Street & Maryland Ave. NE, 1909-1932 photo
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
10/30
Maryland Avenue in 1951: Two
travel lanes and wide median
Maryland Avenue at
7th
and D Streets, NE
M l d A b
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
11/30
Maryland Ave. between
14th and 15th Streets NE
Original wide
planted
median
4 ft. wide
concrete
median
1947
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
12/30
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
13/30
Concept — Typical Section• Existing:
• Recommended Alternative:
5-6’ 5-6’ Sidewalk/
tree zone
Sidewalk/
tree zone
Sidewalk/
tree zone
Sidewalk/
tree zone
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
14/30
Concept — Stanton Park
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
15/30
Concept — 7th/D St./MD:
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
16/30
Concept— 7th/D/MD Rendering:Rendering prepared for Historic Preservation
discussion (SHPO, CHRS).
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
17/30
Concept — E St./9th/10th/MD:
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
18/30
Park/Plaza concepts at 9th/10th/E /MD
Rendering prepared for Historic Preservationdiscussion (SHPO, CHRS).Design illustrates the uninterrupted “view-shed” of historic L'Enfant plan.
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
19/30
Concept – 12th/F St./MD
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
20/30
Concept — 14th/G St./Elliott
St./MD
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
21/30
Refinements in Design
• Curb Extensions
– Safety needs (turning vehicle speeds)
– Stormwater management opportunities
– Historic Preservation Stakeholders
• Design of parks/plazas
• Utility locations/needs
• Final lane widths/median dimensions
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
22/30
Process and Approach
• Implement corridor-wide streetscape as
typical capital project using FHWA funds
• Address site-specific locations with interim
treatments
• Design – Bid – Build to resolve detailed design
issues
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
23/30
Process and Approach
Design Stage Focus
Community
Engagement Cost Estimates
Concept - Basic layout, design goals,
key issues and potential
environmental/historic
impacts
- Extensive, iterative - Order of
magnitude unit
costs
Preliminary
Engineering
- Refined layout, utility
locations, landscape
treatments
- Focused on key
issues
- Detailed
estimates of unit
quantities/costs
Final Design - Construction Bid
documents, construction
staging and Traffic ControlPlans
- Limited - Construction cost
estimate for bid
evaluations
Construction - Safe, efficient project
completion
- Construction
process
- N.A.
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
24/30
Continued Incremental Improvements
• 7th / D / Maryland (last summer)
• Stanton Park (this summer)
•
9
th
/10
th
/E/Maryland (this summer)
7th S /D S /M l d A P bl
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
25/30
7th St./D St./Maryland Avenue- Problems
with former existing conditions:
Where librarian was
struck and injured,
June, 2014
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
26/30
7th St./D St./Maryland Avenue Temporary
Treatment. Installed, July, 2014
h
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
27/30
Near Term Bike lane gap filling on 4th and 6th Streets, May/June, 2015
d th/ th/ d l d
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
28/30
Medium Term 9th/10th/E and Maryland
Summer, 2015
NewTraffic
Signal
Areas closed to motor
vehicle traffic
New traffic patternfor 800 block of E St.
-
8/9/2019 Minutes from the May 12, 2015 DDOT Meeting
29/30
Timeline and Next Steps
• Preliminary review by FHWA of “CategoricalExclusion Document” with no major issues
Next Steps:
•
Finalize Documented Categorical Exclusion andobligate FHWA funds for Preliminary Engineering(June)
• Preliminary Engineering & Detailed Cost Estimatefor programing, Summer 2015-Spring 2016
• Final Design Spring 2016-Spring 2017
• Construction 2017
-