    Tonight’s Agenda: 

    1. Recommended Concept Plan2. Process and Approach

    3. Continued IncrementalImprovements

    4. Timeline and Next Steps

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    3/30

    Maryland Avenue Project Overview:

    •Key issues from planning study: – High speeds & relatively low traffic volumes

     – Pedestrian crash history

     –

    Lack of bike facility connectivity• Recommended Alternative- Road

    Reconfiguration (Road Diet), with curb

    extensions, landscaped median, left turnpockets, and bike lanes

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    4/30

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    5/30

     

    31 

    45 MPH 

    95th percentile 26 - 40 MPH 

    85th percentile 

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    6/30

    Crash Trend on Maryland

    Avenue, 2005-2012

    3533

    38

    56

    48

    54

    47

    72

    0

    10

    20

    30

    40

    50

    60

    70

    80

    2005 2006 2007 2008 2009 2010 2011 2012

       C   r   a   s    h   e   s   p   e   r   Y   e   a   r

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    7/30

     

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    8/30

     

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    9/30

    A Brief History of Maryland Ave. NE

    • 12th Street & Maryland Ave. NE, 1909-1932 photo

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    10/30

     

    Maryland Avenue in 1951: Two

    travel lanes and wide median

    Maryland Avenue at

    7th

     and D Streets, NE

    M l d A b

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    11/30

     

    Maryland Ave. between

    14th and 15th Streets NE

    Original wide

    planted

    median

    4 ft. wide

    concrete

    median

    1947

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    12/30

     

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    13/30

    Concept — Typical Section• Existing:

    • Recommended Alternative:

    5-6’  5-6’  Sidewalk/

    tree zone

    Sidewalk/

    tree zone

    Sidewalk/

    tree zone

    Sidewalk/

    tree zone

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    14/30

    Concept — Stanton Park

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    15/30

    Concept — 7th/D St./MD:

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    16/30

    Concept— 7th/D/MD Rendering:Rendering prepared for Historic Preservation

    discussion (SHPO, CHRS).

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    17/30

    Concept — E St./9th/10th/MD:

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    18/30

    Park/Plaza concepts at 9th/10th/E /MD

    Rendering prepared for Historic Preservationdiscussion (SHPO, CHRS).Design illustrates the uninterrupted “view-shed” of historic L'Enfant plan. 

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    19/30

    Concept – 12th/F St./MD

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    20/30

    Concept — 14th/G St./Elliott

    St./MD

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    21/30

    Refinements in Design

    • Curb Extensions

     – Safety needs (turning vehicle speeds)

     – Stormwater management opportunities

     – Historic Preservation Stakeholders

    • Design of parks/plazas

    • Utility locations/needs

    • Final lane widths/median dimensions

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    22/30

    Process and Approach

    • Implement corridor-wide streetscape as

    typical capital project using FHWA funds

    • Address site-specific locations with interim

    treatments

    • Design – Bid – Build to resolve detailed design

    issues

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    23/30

    Process and Approach

    Design Stage Focus

    Community

    Engagement Cost Estimates

    Concept - Basic layout, design goals,

    key issues and potential

    environmental/historic

    impacts

    - Extensive, iterative - Order of

    magnitude unit

    costs

    Preliminary

    Engineering

    - Refined layout, utility

    locations, landscape

    treatments

    - Focused on key

    issues

    - Detailed

    estimates of unit

    quantities/costs

    Final Design - Construction Bid

    documents, construction

    staging and Traffic ControlPlans

    - Limited - Construction cost

    estimate for bid

    evaluations

    Construction - Safe, efficient project

    completion

    - Construction

    process

    - N.A.

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    24/30

    Continued Incremental Improvements

    • 7th / D / Maryland (last summer)

    • Stanton Park (this summer)

    9

    th

    /10

    th

    /E/Maryland (this summer)

    7th S /D S /M l d A P bl

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    25/30

    7th St./D St./Maryland Avenue- Problems

    with former existing conditions:

    Where librarian was

    struck and injured,

    June, 2014

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    26/30

    7th St./D St./Maryland Avenue Temporary

    Treatment. Installed, July, 2014

    h

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    27/30

    Near Term Bike lane gap filling on 4th and 6th Streets, May/June, 2015

    d th/ th/ d l d

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    28/30

    Medium Term 9th/10th/E and Maryland

    Summer, 2015

    NewTraffic

    Signal

    Areas closed to motor

    vehicle traffic

    New traffic patternfor 800 block of E St.

  • 8/9/2019 Minutes from the May 12, 2015 DDOT Meeting

    29/30

    Timeline and Next Steps

    • Preliminary review by FHWA of “CategoricalExclusion Document” with no major issues 

    Next Steps:

    Finalize Documented Categorical Exclusion andobligate FHWA funds for Preliminary Engineering(June)

    • Preliminary Engineering & Detailed Cost Estimatefor programing, Summer 2015-Spring 2016

    • Final Design Spring 2016-Spring 2017

    • Construction 2017