Minute of Meeting Scrap Rubber Tyre
-
Upload
siti-nurfatin -
Category
Documents
-
view
220 -
download
0
Transcript of Minute of Meeting Scrap Rubber Tyre
-
8/18/2019 Minute of Meeting Scrap Rubber Tyre
1/4
APPENDIX
MINUTE OF MEETING
SLOPE PROTECTION USING SCRAP RUBBER TYRE
DATE: 5 April 2016
TIME : 5 p.m.
PLACE : Library Tun Aminah, ni!"r#i$i Tun %u##"in &nn
Malay#ia.
Members Present:
1. %a'imullah Dima#y(i bin Ab)ullah *a+a+iChairp"r#-n2. /i$i Nura$in bin$i *ainu))in/"r"$ary. I''a A$ira bin$i Ab)ul %alim3. N-r Imran bin N-r A'lan5. Ahm") Mir)'a bin E#a6. Nurul 4a)ilah bin$i /aupi
N&. /ECT ACTI&N 7 4EEDAC8 1.0 C%AI9PE9/&N ADD9E//
The chairperson called the meeting to
order at 5.00 p.m. and thanked the
committee members for being present.
He mentioned that the purpose of this
meeting was to describe the
geotechnology of problematic soil
Chairp"r#-n All m"mb"r# ar"")
2.0 INT9&DCIN; /L&PE P9&TECTI&N /IN; /C9AP 9E9 T79E
Waste tyres have become a common
method of erosion control to
preventing soil erosion. It is a process
of a slope protection system to reduce
/"r"$ary All m"mb"r# ar"")
-
8/18/2019 Minute of Meeting Scrap Rubber Tyre
2/4
APPENDIX
severe erosion that occurs in non-
vegetated slopes
.0 CL&/IN;
The hairperson summari!ed the
decisions made at the meeting andthanked the committee members for
having worked hard for this
assessment. The meeting was
ad"ourned at #.$0 p.m. with a vote of
thanks to the hairperson.
/"r"$ary All m"mb"r# ar"")
Pr"par") by:
Appr-!") by:
-
8/18/2019 Minute of Meeting Scrap Rubber Tyre
3/4
APPENDIX
MINUTE OF MEETING
SLOPE PROTECTION USING SCRAP RUBBER TYRE
DATE: 1= April 2016
TIME : 3 p.m.
PLACE : Library Tun Aminah, ni!"r#i$i Tun %u##"in &nn
Malay#ia.
Members Present:
1. %a'imullah Dima#y(i bin Ab)ullah *a+a+iChairp"r#-n2. I''a A$ira bin$i Ab)ul %alim /"r"$ary. /i$i Nura$in bin$i *ainu))in3. N-r Imran bin N-r A'lan5. Ahm") Mir)'a bin E#a6. Nurul 4a)ilah bin$i /aupi
N&. /ECT ACTI&N 7 4EEDAC8 1.0 C%AI9PE9/&N ADD9E//
The chairperson called the meeting to
order at %.00 p.m. and thanked the
committee members for being present.
He mentioned that the purpose of this
meeting was to analy!e the progress
of the report and to discuss works that
need to be done.
Chairp"r#-n All m"mb"r# ar"")
2.0 DI/C//I&N/ AND ANAL7*IN; &4 9EP&9T
&ach contents of the report were
analy!ed and compiled together.
'roposal for materials needed to build /"r"$ary All m"mb"r# ar"")
-
8/18/2019 Minute of Meeting Scrap Rubber Tyre
4/4
APPENDIX
a model of the pro"ect including the
cost to build the model. (roup
members discussed on creating the
model and appro)imate total cost
were concluded.
.0 CL&/IN;The hairperson summari!ed the
decisions made at the meeting and
thanked the committee members for
having worked hard for this
assessment. The meeting was
ad"ourned at 5.$0 p.m. with a vote of
thanks to the hairperson.
/"r"$aryAll m"mb"r# ar"")
Pr"par") by:
Appr-!") by: