MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port...

23
MINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT AUTHORITY INVITATION FOR EXPRESSION OF INTEREST FOR Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems CONTRACT WW228C February 2013

Transcript of MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port...

Page 1: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

 

    

  

MINISTRY OF ENERGY AND PUBLIC UTILITIES  

REPUBLIC OF MAURITIUS     

 

  

WASTEWATER MANAGEMENT AUTHORITY   

  

INVITATION FOR EXPRESSION OF INTEREST  

FOR  

  

 

Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems 

    

CONTRACT WW228C          

February 2013   

Page 2: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

  

Invitation for Expression of Interest For  

CONTRACT  WW  228C  –  Consultancy  Services  for  the  Assessment  of  the  Port  Louis Sewerage and Water Supply Systems   1.0  INTRODUCTION  The  Wastewater  Management  Authority  (WMA)  is  the  Agency  designated  by  the Government of Mauritius for the  implementation of sewerage projects under the National Sewerage Program.   Following  continuing  problems  of  surcharging,  blockages  and  the  occasional  collapse occurring  in  the  ageing  Port  Louis  Sewerage  System, WMA  has  decided  that  an updated Condition Survey needs to be carried out to the total existing sewerage system of Port Louis and  from  this survey work establish a priority  list of systems which need  to be replaced / upgraded. Moreover, the survey works shall cover the CWA water supply network system.  Due to the extent of the work and  limitation of budget,  it  is planned to carry this out  in 3 Phases.    2.0  PROJECT AREA  The  existing  Port  Louis  sewerage  system  has  been  divided  into  3  sections  allowing  the proposed  work  to  be  carried  out  in  3  Phases.  Each  planned  phase  of  work  covers  the following districts of Port Louis:  

Phase I  Phase II Phase III

Le Hochet  Vallée Pitot  Tranquebar La Cure  Plaine Verte  Champ de Mars Race course Area Le Cornu  Cite Martial  Line Barracks Saint Croix  Fanfaron La ButteCarreau Lalo    Bell Village Briquetterie    Les Salines Abercombie    Bain des DamesRoche Bois    Vallijee     Plaine Lauzun Industrial Estate     Part of Camp Chapelon 

 

    

 

WASTEWATER MANAGEMENT AUTHORITY CELICOURT BUILDING 

SIR CELICOURT ANTELME STREET PORT LOUIS 

Tel: (230) 206 3000   Fax: 211 7007 Email: [email protected] 

Page 3: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

3.0  PROJECT FUNDING   The Consultancy Contract will be funded by the Wastewater Management Authority.  4.0  SCOPE OF PROPOSED CONSULTANCY SERVICES BEING REQUIRED  The WMA  intends  to  appoint  a  Consultancy  Firm,  to  be  referred  to  as  the  “Consultant” having  the  necessary  experience  and  engineering  resources  to  provide  the  following services:   4.1  SCOPE OF PROPOSED CONSULTANCY SERVICES BEING REQUIRED FOR PORT LOUIS 

WASTEWATER SYSTEMS  4.1.1 Survey Work Carry out a detailed positioning survey of all the foul sewerage manholes in the designated area using accurate GPS equipment and plot their precise position on a GIS prepared map of Port Louis to be in line with the requirements of the Ministry of Housing and Lands. Provide grid co‐ordinates and a standard numbering system for each manhole. On the GIS map, the pipe material,  length,  diameter  and  any  laterals  joining  the  pipe  between  the  surveyed manholes must be shown. 

 4.1.2 Condition of Manholes An assessment of  the  condition of each manhole must be  carried out and  contained  in a report with the following information provided:‐ 

Cover level;  Invert level;  Dimension and type of manhole;  Type of cover;  Condition of manhole containing recommendations on any remedial works required;  Internal diameter of any inlet pipes;  Internal diameter of outlet pipe; and  Internal diameter of any branch connection.  

 4.1.3 Condition of Pipelines A  full  condition  survey,  using  CCTV,  of  each  existing  pipeline  between  each  surveyed manhole and any  lateral  connection  (not  individual house  connections)  should be  carried out  and  logged.  The  CCTV  report  produced  for  each  line  should  contain  the  following information as well as a copy of the CCTV film:‐ 

Distance between each manhole;   Diameter of the pipeline surveyed;  Gradient of the pipeline;  Pipeline material (clay, concrete, UPVC etc.)  The chainage of lateral connections; and  The  general  condition  of  the  pipeline  noting  any  cracked  or  collapsed  pipes, collection of grit or other deposits, and any blockages. 

   

Page 4: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

4.1.4 Infiltration  A  detailed  investigation  on  the  sources  of  water  infiltration  in  the  existing  wastewater network shall be carried out.    4.1.5 Provision of Report The delivery of a  full  report containing all  information gathered  from  the above condition surveys  together with both hard and  soft copies of each Phase of  the project  individually compiled.   4.1.6 Provision of Drawings  A  full GIS orientated survey drawing  for each Phase of  the project showing all  referenced manhole positions, pipelines, gradients and direction of flow should be provided which will form an Appendix to the report. A softcopy of this work should also be delivered in AutoCAD Map format.    

 4.2  SCOPE OF PROPOSED CONSULTANCY SERVICES BEING REQUIRED FOR PORT LOUIS 

WATER SUPPLY SYSTEM  4.2.1 Survey Work Carry out a detailed positioning survey of all water pipelines  in  the designated area using accurate GPS  equipment  and  plot  their  precise  position  on  a GIS  prepared Map  of  Port Louis.  Provide grid co‐ordinates for each Valve, fire Hydrant and Washout as well as other appurtenances to a numbering system.   On the GIS Map  indicate  layout of  individual pipe connection between main pipe and meter.  4.2.2 Condition of Pipes The following information should be provided: 

Pipe diameter and pipe material;  The pipe length of the trunk main and invert level obtained from trial pits;  The pipe length of the service main and invert level obtained from trial pits;  Ground level of the household connection pipe at the meter connection. 

 4.2.3 Provision of Report The survey should also indicate whether the house is equipped with a water tank and what capacity the tank is. 

 4.2.4 Provision of Drawings A  full  GIS  orientated  survey  drawing  should  be  submitted  showing  all  reservoirs,  trunk mains,  service mains,  as well  as  individual house  connection with  all  the  appurtenances.  The soft copy should be in AutoCAD Map Format.  5.0  INVITATION FOR EXPRESSION OF INTEREST  With  respect  to  the  above,  the WMA  is  inviting  for  an  Expression  of  Interest  (EOI)  from Consultancy firms to offer its services for the three phases.   The  information  requested  in  the  EOI will  be  a  pre‐requisite  to  enable  the Wastewater Management Authority to assess the firm’s capability to provide the services required.  

Page 5: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

The WMA will  prepare  a  shortlist  of  those  Consultants who will  thereafter  be  invited  to submit proposals for the abovementioned Consultancy Contract.  6.0  GUIDELINES AND IMPORTANT NOTES FOR EXPRESSION OF INTEREST  The  following guidelines and  important notes  shall have  to be  strictly complied  to by  the respective applicants while submitting the Expression of Interest:  

a) Interested Consultancy firms/Group of Consultancy Firms with proven experience in the  field of  conditional  survey work, GIS work and CCTV  surveys are  requested  to provide  the  relevant  information  as  per  the  format  of  Forms  1‐5  enclosed  in  the Invitation at Annex I.  Such information will be used to determine the compliance of the  Firms/ Group of Consultancy  Firms with  respect  to  the  requirements  given  at Annex II. 

  Apart from those  information required  in Annex II, the Firm/ Group of Consultancy Firms should also provide additional  information,  in terms of staffing and resources (back up support, equipment etc), which they may deem necessary and adequate for the proper execution of the Contract. 

 

b) A brief on the said Consultancy Services given  in Annex  III, as well as Forms 1‐5 at Annex  I,  can be downloaded  from  the WMA website http://wma.intnet.mu. Hard copies of these documents are also available for consultation at the WMA Registry, 6th Floor Celicourt Building, Celicourt Antelme Street, Port Louis during office hours (09 00 hrs – 16 00hrs). 

 c) The WMA reserves the right to award the consultancy services in phases.  d) Expressions of  Interest  in one original and two copies, together with the duly  filled 

forms shall be contained in a plain sealed envelope addressed to:  

The General Manager   Wastewater Management Authority Celicourt Building Sir Celicourt Antelme Street Port Louis  

e) The envelope shall be clearly marked: “CONTRACT WW 228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems” 

          and shall be deposited in the Tender Box of the WMA located at Level 6, not later than                             13.30 hrs on 25 March 2013.  NOTE: LATE APPLICATIONS WILL NOT BE ACCEPTED   Wastewater Management Authority Date: 21 February 2013 

Page 6: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

     

Annex I 

FORMS 

Page 7: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

 APPLICATION FORM (1)  

GENERAL INFORMATION All individual parties/firms and each partner of a joint venture/consortium applying for the Expression of  Interest are requested to complete this form. Nationality  information should be provided for all owners or applicants who are partnerships or individually‐owned firms.  

 1  

Name of firm

 2 

 

Head office Address 

 3 

 

Telephone  Contact

 4  

Fax  E‐mail

 5  

Place of incorporation/ registration Year of  incorporation/ registration 

  

Nationality of owners’

  

Name  

Nationality 

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

  

        To be completed by all owners of partnerships or individually‐owned firms. 

 

Page 8: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

 APPLICATION FORM (2)  BRIEF DESCRIPTION OF ORGANISATION  Name of Applicant or partner of a joint venture/consortium   

 1 All  individual  parties/firms  and  each  partner  of  a  joint  venture/consortium  are 

requested to complete this form. The information supplied should include structure of the organization, the general staffing, logistics and support. 

 Use a separate sheet for each partner of a joint venture.  Applicants should not enclose testimonials, certificates, and publicity material with their applications; they will not be taken into account in the evaluation of qualifications.  STRUCTURE OF THE ORGANISATION 1 

GENERAL STAFFING 2

 LOGISTICS AND SUPPORT 3  

            

  

  

 2. The Consultants are required to indicate clearly the experts to be provided for the 

assignment. Notes: 1: Structure of the organisation shall include the general organigram, the different sections, services, 

etc. 2: General staffing shall indicate total staff, including both technical and support. 3: Logistics and support shall give details of software, design packages, equipment and other tools 

which the Consultant feels necessary to deliver the services. 

Page 9: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

 APPLICATION FORM 3  

EXPERIENCE RECORD   To enable evaluation and short‐listing, the Applicant is required to fill in the form (3A) and form (3B)  On a separate page, using the format of Form (3A) and (3B), the Applicant  is requested to provide evidence on each project as follows:  

a)  General Experience in Consultancy   

b) Specific Experience  in similar nature and complexity to the present assignment, for which his firm and each associate (if any) were legally contracted either individually or as a corporate entity or as one of the major companies within an association, for carrying out consultancy services during the last eight (8) years. 

 

Page 10: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

10 

 APPLICATION FORM (3A)  

GENERAL EXPERIENCE  Name of applicant or partner of a joint venture/consortium    Use a separate sheet for each contract.  1.  

Number of contract    

  

Name of contract  

  

Country  

2.  

Name of employer  

3.  

Employer address  

4.  

Nature of services and special features relevant to the contract for which the Applicant wishes to be short listed    

5.  

Contract role ( check one)            Sole party                     Management Consultant                 Sub consultant                  Partner in a joint venture  

6.  

Name of associate consultants (if any) 

7.  

Date of award  

8.  

Date of completion/ Extension of Time if any 

9.  

Contract/subcontract duration ( years and months)                                                         …………. years           …………. months                                                             

10.  

Contract Value    

 

Page 11: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

11 

 APPLICATION FORM (3B)  

SPECIFIC EXPERIENCE IN SIMILAR PROJECT  Name of applicant or each partner if in a joint venture/consortium    Use a separate sheet for each contract.  1.  

Number of contract    

  

Name of contract  

  

Country  

2.  

Name of employer  

3.  

Employer address  

4.  

Nature of services and special features relevant to the contract for which the Applicant wishes to be short listed    

5.  

Contract role ( check one)            Sole party                     Management Consultant                 Sub consultant                  Partner in a joint venture  

6.  

Name of associate consultants (if any) 

7.  

Date of award  

8.  

Date of completion/ Extension of Time if any 

9.  

Contract/subcontract duration ( years and months)                                                         …………. years           …………. months                                                             

10.  

Contract Value    

 

Page 12: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

12 

 APPLICATION FORM (4)   

SUMMARY SHEET: CURRENT CONTRACT COMMITMENTS / SERVICES IN PROGRESS 

 Name of applicant or partner of a joint venture/consortium     Applicants and each partner to an application should provide  information on their current commitments on all  contracts  that have been awarded, or  for which a  letter of  intent or acceptance has been received, or for contracts approaching completion.  

Name of contract  

Contract Value 1 Start date and Scheduled completion date 

1.  

   

2.  

   

3.  

   

4.  

   

5.  

 

6.  

   

 1: The Contract Value shall be for both Works and Consultancy Contracts.  

Page 13: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

13 

Financial information in (MUR)

Historic information for previous _[insert number] years, [insert in words]

(MUR)

Year 1 Year 2 Year 3 Year … Year n

Information from Balance Sheet

Total Assets (TA)

Total Liabilities (TL)

Net Worth (NW)

Current Assets (CA)

Current Liabilities (CL)

Information from Income Statement

Total Revenue (TR)

Profits Before Taxes (PBT)

 APPLICATION FORM (5A)   

FINANCIAL STANDINGS    [The following table shall be filled in for the Applicant and for each partner  if in a Joint Venture] 

           Applicant’s  Legal Name: [insert full name]                Date: [insert day, month, year]                  Applicant’s Party Legal Name:[insert  full name]            Contract No. and title: [insert Contract number and title]           Page [insert page number] of [insert total number] pages 

 

Page 14: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

14 

 APPLICATION FORM (5B) 

 Average Annual Turnover 

[The following  table shall be filled  in for the Applicant and for each partner of a Joint Venture]   Applicant's/Joint  Venture Partner's  Legal Name:  [insert  full name]  Date: [insert day, month, year] Applicant's  Party Legal Name:  [insert  full name] Contract No. and title: [insert Contract  number and title]  Page [insert page number] of [insert total number] pages  

 Average    annual    consultancy    turnover    calculated    as   total    certified    payments   received    for services  in  progress    or  completed,    divided    by  the  number    of  years  specified    in  t h e  Qualification  Criteria and Requirements.  Notes for Financial documents: The Applicant and its parties shall provide copies of the full set of financial statements  for the last three consecutive  financial years.  The financial statements shall:  

(a)  Reflect  the financial situation of the Applicant or partner to a JV, and not sister or parent companies. 

 (b) Be audited by a certified accountant. 

 (c)  Be complete,  including all notes to the financial statements. 

 (d) Correspond  to accounting periods already completed and audited (no statements  for 

partial periods shall be requested or accepted).(Attach  copies of financial  statements (balance  sheets,  including  all related notes,  and  income statements)  for the [number] years required above; and complying with the requirement. 

 

Annual  turnover data (consultancy  only) 

Year  Amount and Currency  MUR 

[indicate year]  [insert amount]  [MUR] 

     

     

     

     

Average Annual Consultancy Turnover * 

 

Page 15: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

15 

 

    

Annex II 

QUALIFYING CRITERIA  

                               

Page 16: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

16 

QUALIFYING CRITERIA – FIRM’S EXPERIENCE REQUIREMENTS  

 

Item No. 

Subject  Requirement  Single EntityAll parties of Joint Venture (JV) combined

Submission Requirements 

1 General Experience  in Consultancy S i

General Experience in Consultancy Services during the last 10 (ten) years. 

Must meet requirement

Must meet requirement 

Form 3A 

Specific Experience  in surveying sewerage and water supply systems in urban areas 

The Applicant shall, over the past 5 (eight) years preceding the E O I due date; have participated as lead partner in surveying urban sewerage and water supply systems on at least two similar projects. 

Must meet requirement

Must meet requirement 

Form 3B 

3 Specific Experience  in CCTV surveys 

The Applicant shall, over the last five (5) years preceding the E O I due date, have completed carrying out comprehensive CCTV surveys of sewerage  pipelines in an urban environment on at least two (2) similar projects. 

Must meet requirement

Must meet requirement 

Form 3B 

4 Specific Experience  in GIS work 

The Applicant shall demonstrate that they have an excellent knowledge of GIS mapping and that they have successfully carried out at least two (2) GIS surveys on similar projects. 

Must meet requirement

Must meet requirement 

Form 3B 

Page 17: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

17 

 QUALIFYING CRITERIA – FIRM’S FINANCIAL REQUIREMENTS 

ItemNo. 

Subject  Requirement Single Entity 

All parties of Joint Venture (JV) combined 

Submission Requirements 

 Financial Standings  

1  Firm’s Turn‐Over 

The Applicant shall submit copy ofaudited balance sheets and annual report or other financial statements acceptable to the WMA, for the last three (3) financial consecutive years and shall have an average turnover of MUR 5 Million in the last three consecutive financial years (year 2010, 2011 and 2012).

Must meet requirement 

Must meet requirement 

Form 5A 

2  Firm’s Profitability 

The Applicant shall submit evidence of the firm’s profitability for the last three consecutive financial years and should demonstrate profit for at least one year. 

Must meet requirement 

Must meet requirement 

Form  5B 

Page 18: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

18 

QUALIFYING CRITERIA – PERSONNEL REQUIREMENTS  Prospective firms should possess adequate and qualified staffing capacity to undertake the services required under the current assignment.  In case of joint venture or consortium, the proposed Team Leader should emanate from the Lead Partner.  In case of  joint venture or consortium,  the bidder shall specify  the  lead partner. The  lead partner shall provide a minimum of 60 % of the key staff / Experts requirements. 

Page 19: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

19 

    

Annex III 

PROJECT BRIEF                                   

Page 20: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

20 

CONTRACT  WW  228C  –  Consultancy  Services  for  the  Assessment  of  the  Port  Louis Sewerage and Water Supply Systems – PROJECT BRIEF  1.0  INTRODUCTION 1.1  Aim of Project The Wastewater Management  Authority  intends  to  appoint  an  Engineering  Consultancy firm, to be referred to as the “Consultant” having the necessary experience and engineering resources  to  cover  the  scope  of  services  as  detailed  below  under  Consultancy  Contract WW228C.  1.2  Project Necessity The Wastewater Management Authority (WMA), a parastatal organisation operating under the  aegis  of  the  Ministry  of  Energy  and  Public  Utilities  (MEPU),  was  established  as  a corporate  body  under  the WMA  Act  2000  and  started  operating  as  from  01  September 2001.  The Wastewater Management Authority  is  the Agency designated by  the Government of Mauritius  for  the  implementation of  the  sewerage projects under  the National  Sewerage Program.  Its  overall  objective  is  to  contribute  to  the  sustainable  preservation  of  the environment and the public health.  In the Port Louis area there are many sewerage lines that are over 100 years old and are in a bad stage of deterioration. Some pipes have undoubtedly cracked and some have collapsed therefore under high flow conditions frequent surcharging of the system is experienced and subsequent  flooding  of  many  housing  areas  experienced.  By  having  a  thorough  survey carried out WMA can prioritise which sections of the sewerage system to replace first and avoid future flooding problems.  There  is also the need whilst the sewerage system  is being surveyed and examined for the chosen  consultant  to  carry  out  additional  work  to  survey  and  report  on  the  state  and location of the adjoining CWA water supply systems.  

 1.3  Project Area The  existing  Port  Louis  sewerage  and  water  supply  systems  have  been  divided  into  3 sections allowing the proposed work to be carried out  in 3 Phases. Each planned phase of work covers the following districts of Port Louis:  

Phase I  Phase II Phase III

Le Hochet  Vallée Pitot  Tranquebar La Cure  Plaine Verte Champ de Mars Race course Area Le Cornu  Cite Martial  Line Barracks Saint Croix  Fanfaron  La Butte Carreau Lalo    Bell VillageBriquetterie    Les Salines Abercombie    Bain des DamesRoche Bois    Vallijee     Plaine Lauzun Industrial Estate     Part of Camp Chapelon 

Page 21: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

21 

2.0  SITE DESCRIPTION AND SEWERAGE PROBLEMS REPORTED  Below  is a brief description of problems that are being encountered at present  in the Port Louis area.  It is brought to the attention of all prospective bidders that the details contained therein are only indicative and non exhaustive. The main problems identified are:  

Blockages and overflows are very common and are more pronounced during  rainy season at certain specific areas. This problem is further aggravated by house holders dumping or flushing unsuitable material into the sewer system. 

There is severe flooding of houses and yard with sewage.   The existing reticulation networks have been constructed  in small pipes which with time have become prone to frequent blockages and overflows. 

Rain  water  downpipes  have  been  routed  to  manholes  resulting  in  additional pressure to the already overloaded pipes and thus causing overflows.  

In times of rainfall, the sewage overflows from the manholes and contaminates river water 

  3.0  SCOPE OF PROPOSED CONSULTANCY SERVICES BEING REQUIRED 

 The WMA  intends  to  appoint  a  Consultancy  Firm,  to  be  referred  to  as  the  “Consultant” having  the  necessary  experience  and  engineering  resources  to  provide  the  following services:  

3.1  SCOPE OF PROPOSED CONSULTANCY SERVICES BEING REQUIRED FOR PORT LOUIS 

WASTEWATER SYSTEMS  3.1.1 Survey Work Carry out a detailed positioning survey of all the foul sewerage manholes in the designated area using accurate GPS equipment and plot their precise position on a GIS prepared map of Port Louis to be in line with the requirements of the Ministry of Housing and Lands. Provide grid co‐ordinates and a standard numbering system for each manhole. On the GIS map, the pipe material,  length,  diameter  and  any  laterals  joining  the  pipe  between  the  surveyed manholes must be shown. 

 3.1.2 Condition of Manholes An assessment of  the  condition of each manhole must be  carried out and  contained  in a report with the following information provided:‐ 

Cover level;  Invert level;  Dimension and type of manhole;  Type of cover;  Condition of manhole containing recommendations on any remedial works required;  Internal diameter of any inlet pipes;  Internal diameter of outlet pipe; and  Internal diameter of any branch connection.  

  

Page 22: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

22 

3.1.3 Condition of Pipelines A  full  condition  survey,  using  CCTV,  of  each  existing  pipeline  between  each  surveyed manhole and any  lateral  connection  (not  individual house  connections)  should be  carried out  and  logged.  The  CCTV  report  produced  for  each  line  should  contain  the  following information as well as a copy of the CCTV film:‐ 

Distance between each manhole;   Diameter of the pipeline surveyed;  Gradient of the pipeline;  Pipeline material (clay, concrete, UPVC etc.)  The chainage of lateral connections over 150 mm diameter; and  The  general  condition  of  the  pipeline  noting  any  cracked  or  collapsed  pipes, 

collection of grit or other deposits, and any blockages.  3.1.4 Infiltration  A  detailed  investigation  on  the  sources  of  water  infiltration  in  the  existing  wastewater network shall be carried out.    3.1.5 Provision of Report The delivery of a  full  report containing all  information gathered  from  the above condition surveys  together with both hard and  soft copies of each Phase of  the project  individually compiled.   3.1.6 Provision of Drawings  A  full GIS orientated survey drawing  for each Phase of  the project showing all  referenced manhole positions, pipelines, gradients and direction of flow should be provided which will form an Appendix to the report. A softcopy of this work should also be delivered in AutoCAD Map format.    

 3.2  SCOPE OF PROPOSED CONSULTANCY SERVICES BEING REQUIRED FOR PORT LOUIS 

WATER SUPPLY SYSTEM  3.2.1 Survey Work Carry out a detailed positioning survey of all water pipelines  in  the designated area using accurate GPS  equipment  and  plot  their  precise  position  on  a GIS  prepared Map  of  Port Louis.  Provide grid co‐ordinates for each Valve, fire Hydrant and Washout as well as other appurtenances to a numbering system.   On the GIS Map  indicate  layout of  individual pipe connection between main pipe and meter.  3.2.2 Condition of Pipes The following information should be provided: 

Pipe diameter and pipe material;  The pipe length of the trunk main and invert level obtained from trial pits;  The pipe length of the service main and invert level obtained from trial pits;  Ground level of the household connection pipe at the meter connection. 

 3.2.3 Provision of Report The survey should also indicate whether the house is equipped with a water tank and what capacity the tank is. 

Page 23: MINISTRY OF ENERGY AND PUBLIC UTILITIES …wma.intnet.mu/whatnew/Contract WW228C - EOI Port Louis.pdfMINISTRY OF ENERGY AND PUBLIC UTILITIES REPUBLIC OF MAURITIUS WASTEWATER MANAGEMENT

EXPRESSION OF INTEREST – CONTRACT WW228C – Consultancy Services for the Assessment of the Port Louis Sewerage and Water Supply Systems  

23 

3.2.4 Provision of Drawings A  full  GIS  orientated  survey  drawing  should  be  submitted  showing  all  reservoirs,  trunk mains,  service mains,  as well  as  individual house  connection with  all  the  appurtenances.  The soft copy should be in AutoCAD Map Format.