Ministry of Economic Development
Tito BianchiDepartment for Development and Cohesion Policies
Ministry for Economic Development of Italy
Seminar "Territorial cohesion: what scales of policy intervention? “, Bruxelles March 12 2010
Integrated Territorial Projects in Italian Cohesion Policy
Ministry of Economic Development
has taken a clear territorial orientation seeks the contribution of local actors, adjusts
to specific territorial needs and ambitions SF programming drives/catalyzes other forms
of public expenditure for economic development at each territorial scale
In 2000-2006 this was done done mainly through Integrated Territorial Projects in the Italian South
Since the mid 1990s, italian regional development Policy
Ministry of Economic Development
Integrated Territorial Projects definition
“Composite project for the development of an area, which includes a set of different operations that all contribute, in interaction with each other, to a common development strategy, devised by local actors in response to concrete needs and opportunities.”
2000-2006
Community Support Framework introduced in Italy….
Ministry of Economic DevelopmentFew Central–level guidelines provided by the Framework. Integrated Territorial
Projects (ITP)…
• Must include operations that add up to an “adequate critical mass”;
• Must identify a core-objective, a centre of responsibility, a territory;
• should not amount to an additional funding line or measure, but represent a special mode through which existing program measures operate
Ministry of Economic Development
Historic preservationEnvironment (restoring
buildings, cleaning polluted sites)
Infrastructure(Roads,
telecommunications Tourist Info points)
Productive sector (Support to local manufacturers of typical products)
Human Resources
(training in skills needed in the
tourism sector)
Measurable Expected Outcomes:Increased N. of visitors, Employment, reduced out-migration
Example of an ITP focused on tourism development
Unified Project Management (one municipal govt. chosen to lead
the project)
Operations of different nature
CORE OBJECTIVE(Strategic idea: provides coherence, integration)
Example: To increase cultural tourism
Ministry of Economic Development
THEMATIC MAP OF ITPs: SECTOR FOCUS OF CORE OBJECTIVES
Ministry of Economic DevelopmentHow multi-sector INTEGRATION of ITPs is made
compatible with sectoral organization of Regional OPs
REGIONAL PROGRAMmeasure
measure
measure
measure
measure
measure
measure
measure
PROJECTSINTEGRATEDTERRITORIAL
PROJECT
Ministry of Economic DevelopmentTwo types of identification and selection procedures
A: competitive, bottom-up
B: negotiated, top down
Municipalities associate. Prepare and submit detailed project
proposal
Regions established bidding criteria for municipalities and published a
call for projects
Municipalities jointly prepare project following Regional geographical, financial, and sectorial decisions
Regions divide up all territory, aggregate municipalities, allocate
funds ex-ante
Regions appraise and approve projects, on the basis of project quality and other criteria
Regions appraise and approve projects once they reach a quality
threshold
Ministry of Economic Development
ITPs approved by Region, sources of funding, and incidence on resources of EU
Regional Operational programs
ERDF ESF EAGGF FIFG
Basilicata 10 310.063.563 72% 6% 23% 0% 18,3%Calabria 29 428.308.290 83% 13% 0% 3% 10,6%Campania 51 2.035.108.947 93% 7% 0% 0% 26,3%Molise 7 63.119.837 74% 10% 17% 0% 13,4%Puglia 10 714.503.537 60% 20% 20% 0% 13,7%Sardegna 13 353.365.299 86% 2% 12% 0% 8,3%Sicilia 36 1.342.045.951 80% 7% 13% 0% 15,9%
Total 156 5.246.515.424 83% 9% 8% 0% 16,4%
Share of ROP ResourcesRegion
Resources OP
Share of Structural Funds#
ITPs
Ministry of Economic Development
Example: ITP n.9 Region Puglia
Core Objective:“To consolidate and innovate the local productive
system based on diffused
manufacturing”
ITP Salentino-Leccese Territorial Area
Ministry of Economic Development
Traditional garment- and shoe manufacturing base is in crisis. In late 1990s, municipalities associate to promote industrial diversification
PA Modernization & informatization
Industrial Infrastructure & Logistics
Business Missions,Tech. Dissemination
& Forecasting
HR development:Vocational education,
Graduate Masters
MANUFACTURING SYSTEM
ITP Salentino-Leccese Background
Integrated Strategy
Ministry of Economic Development
ITP Salentino-Leccese Main Operations
Infrastructure
Industrial Areas
Worth€ 3.987.000
Ministry of Economic Development
ITP Salentino-Leccese Main Operations
Infrastructure Projects:
Logistic Platform
Worth€2.800.000
I
Ministry of Economic Development
ITP Salentino-Leccese Main Operations
Projects in Vocational
High Schools
ESF:
(apprenticeship, school to work)
Worth
€ 5.868.000
Ministry of Economic Development
Subsidies to firms’
Investment (ERDF+ESF):
Worth9.2 M€
ITP Salentino-Leccese Main Operations
11 enterprises invested, their plans including
training and industrial research.
Sectors:Food processing, Pharmaceuticals,
Bathroom Furniture, B to B Software,
digital filing systems
Ministry of Economic Development
The experience on integrated projects carries on in 2007-2013:
• Extends to both convergence and competitiveness regions;
• with less national level guidance, becomes less standard across regions;
• In most regions, integrated projects for urban settings follow different procedures from those designed for marginal areas
Ministry of Economic Development
Concluding remarks:
• Structural Funds are compatible with sub-regional scale of economic development planning;
• Strength (I): sectoral lines of economic development intervention are reconciled at the local scale
• Strength (II): Local public institutions develop capacity to plan economic development in an integrated fashion;
• Covering all territories is overly ambitious • Integrated terrritorial approach encounters some
resistance, adds one level of coordination • Cohesion programs should not build special ad-hoc
institutions, but involve “ordinary” local governments