1
Milton-Madison Bridge Project
2013 MAASTO Conference
July 17, 2013
Kevin Hetrick, INDOT
Andy Barber, KYTC
![Page 2: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/2.jpg)
Project Partners
![Page 3: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/3.jpg)
Purpose and Need
• Structurally Deficient & Functionally Obsolete
• Twenty Foot out-to-out Bridge Deck
• Remaining Service Life of the structure estimated
at 10 years
![Page 4: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/4.jpg)
Superstructure Replacement with Minimal
Approaches
• Milton Approach re-construction
• Structure No. 1 replacement
• Structure No. 2 replacement
– Scour Mitigation and Pier
Strengthening
– Superstructure Replacement
4
Milton, KY
Madison, IN
• Structure No. 3 replacement
• Construction of Structure No. 4
1 2 3
4
![Page 5: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/5.jpg)
5
Proposed Pier
Strengthening
1) Drill holes into existing
unreinforced caisson
3) Add stem reinforcement
4) Form and cast collar and
new cap
2) Grout dowels into holes
and extend above top
of caisson
Existing Pier
and Caisson
SECTION A-A
A A
![Page 6: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/6.jpg)
Final Scour Design Sketch
6
![Page 7: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/7.jpg)
7
12’-0”
LANE8’-0”
SHOULDER
12’-0”
LANE5’-0”
CLEAR
8’-0”
SHOULDER
![Page 8: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/8.jpg)
8
Ferry Service during Construction
• No Cost to Users
• Ferries would accommodate vehicles
• Special provisions for medical emergencies
• Capacity to be determined
• Hours of operation to be determined
![Page 9: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/9.jpg)
99
Proposed
Existing
![Page 10: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/10.jpg)
10
Design-Build Proposals
September 22, 2010Five Contractors submitted bids
Project was awarded based on
- Cost to construct project ($102-$127 million)
- Length of bridge closure (10-365 days)
- Date to open bridge to traffic (Sept 2012/May 2013)
Walsh had the lowest bid based on these factors
![Page 11: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/11.jpg)
11
The Winning Design-Build Team
Walsh Construction, Inc (CONTRACTOR)Construction firm in La Porte, IN
www.walshgroup.com
Burgess & Niple, Inc. (DESIGNER)Engineering firm in Columbus, OH and Indianapolis, IN
www.burgessniple.com
Buckland & Taylor (DESIGNER)Bridge engineering firm in Seattle, WA
www.b-t.com
![Page 12: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/12.jpg)
12
Proposal for Design Build Process
Innovative construction process:
Build a new truss on downstream piers while the existing bridge remains open to traffic
Strengthen existing piers
Remove old truss and slide the new truss onto the strengthened existing piers
Shortest closure periods (approx 10 days)
![Page 13: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/13.jpg)
13
Step 1
- Existing bridge remains open to traffic
- Detour approach ramps are built on Vaughn Dr and KY 36
- Pier strengthening and widening begins
Design-Build
Process
![Page 14: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/14.jpg)
14
![Page 15: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/15.jpg)
15
![Page 16: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/16.jpg)
16
Step 2
- Bridge closes to traffic for 5 days
- Approach ramps are connected to existing bridge
- Existing bridge reopens to traffic
- Pier strengthening work continues
Design-Build
Process
![Page 17: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/17.jpg)
17
![Page 18: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/18.jpg)
18
![Page 19: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/19.jpg)
19
Step 3
- Downstream bridge piers are constructed
Design-Build
Process
![Page 20: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/20.jpg)
20
![Page 21: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/21.jpg)
21
![Page 22: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/22.jpg)
22
Step 4
- Existing bridge remains open to traffic
- New truss superstructure is erected on downstream piers
- Permanent approaches are built
Design-Build
Process
![Page 23: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/23.jpg)
23
![Page 24: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/24.jpg)
24
![Page 25: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/25.jpg)
25
![Page 26: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/26.jpg)
26
![Page 27: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/27.jpg)
27
![Page 28: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/28.jpg)
28
![Page 29: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/29.jpg)
29
![Page 30: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/30.jpg)
30
Step 5
- Downstream bridge is connected to US 421
- Traffic is rerouted onto downstream bridge
Design-Build
Process
![Page 31: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/31.jpg)
31
![Page 32: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/32.jpg)
32
Step 6
- Existing bridge is demolished
Design-Build
Process
![Page 33: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/33.jpg)
33
![Page 34: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/34.jpg)
34
![Page 35: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/35.jpg)
35
Step 7
- Traffic remains on downstream bridge
- Detour approach ramps are removed
- Pier strengthening and widening is completed
Design-Build
Process
![Page 36: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/36.jpg)
36
Step 8
- Downstream bridge closed for 5 days
- Using steel rails and plates, new truss superstructure
is moved from downstream piers to its permanent place
- New Milton-Madison Bridge opens to traffic
- Downstream piers are removed
Design-Build
Process
![Page 37: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/37.jpg)
37
For More Information
Kevin Hetrick INDOT
Phone 317-232-5162
Visit the project website
www.miltonmadisonbridge.com
or contact:
Andy BarberKYTC
Phone 502-210-5504
![Page 38: Milton-Madison Bridge Project - MAASTO - 1A - Kentucky.pdf · 2013. 8. 5. · Visit the project website or contact: Andy Barber KYTC Andy.Barber@ky.gov Phone 502-210-5504](https://reader036.fdocuments.in/reader036/viewer/2022071502/61227623e6fff56d0f585138/html5/thumbnails/38.jpg)
38
Questions?