MILLENNIUM CHALLENGE ACCOUNT-INDONESIA
GREEN PROSPERITY PROJECT
Guideline and Standard Template to Develop
Project - Environmental & Social Management System
(ESMS) and Environmental & Social Management Plan
(ESMP) for MCA-Indonesia Green Prosperity Project
September 2016
Version 1.0
Millennium Challenge Account - Indonesia (MCA-Indonesia)
MR21 Building, 11th Floor
Jalan Menteng Raya no. 21, Jakarta 10340, Indonesia
T: +62 21 3983 1971 (central) | F: +62 21 3983 197
www.mca-indonesia.go.id
Table of Contents
i
Table of Contents
Table of Contents ............................................................................................................................................. i
List of Tables ................................................................................................................................................. iii
List of Appendices ......................................................................................................................................... iii
Explanation of This Guideline and Template ...................................................................................... iv
Term and Definitions .................................................................................................................................... v
Section 1 General ............................................................................................................................... 1-1
Section 2 Project Landscape & Lifescape .................................................................................. 2-1
Section 3 Environmental and Social Safeguard Compliance ............................................. 3-1
3.1 Project Policies Statement ................................................................................................................. 3-1
3.2 Legal Compliance .................................................................................................................................. 3-1
Section 4 ESMS Framework ........................................................................................................... 4-1
4.1 Purpose of ESMS .................................................................................................................................... 4-1
4.2 Objective of ESMS .................................................................................................................................. 4-1
4.3 Scope of ESMS ......................................................................................................................................... 4-1
Section 5 Assessment & Analysis ................................................................................................. 5-1
5.1 Project Initial Screening and Scoping Assessment ................................................................. 5-1
5.2 Environmental and Social Impact Assessment......................................................................... 5-1
Section 6 Environmental & Social Management Plan .......................................................... 6-1
6.1 Project Consultation and Disclosure Plan (PCDP) – IFC PS 1 ............................................. 6-2
6.1.1 Management Plan ................................................................................................................. 6-2
6.1.2 Monitoring Plan ..................................................................................................................... 6-2
6.2 Emergency Preparedness and Response Plan (EPRP) - IFC PS 1 ..................................... 6-3
6.2.1 Management Plan ................................................................................................................. 6-3
6.2.2 Monitoring Plan ..................................................................................................................... 6-3
6.3 Grievance Mechanism – IFC PS 1 .................................................................................................... 6-4
6.3.1 Management Plan ................................................................................................................. 6-4
6.3.2 Monitoring Plan ..................................................................................................................... 6-4
6.4 Stakeholder Engagement Plan (SEP) - IFC PS 2 ...................................................................... 6-5
6.4.1 Management Plan ................................................................................................................. 6-5
6.4.2 Monitoring Plan ..................................................................................................................... 6-5
6.5 Occupational Health and Safety Action Plan – IFC PS 2 ........................................................ 6-6
6.5.1 Management Plan ................................................................................................................. 6-6
6.5.2 Monitoring Plan ..................................................................................................................... 6-6
6.6 Dust Control Management Plan – IFC PS 3 ................................................................................. 6-6
6.6.1 Management Plan ................................................................................................................. 6-6
6.6.2 Monitoring Plan ..................................................................................................................... 6-7
6.7 Air Pollution & Green House Gasses (GHG) Control and Reduction Management
Plan - IFC PS 3 ......................................................................................................................................... 6-7
6.7.1 Management Plan ................................................................................................................. 6-7
6.7.2 Monitoring Plan ..................................................................................................................... 6-8
6.8 Noise Control Management Plan - IFC PS 3................................................................................ 6-8
6.8.1 Management Plan ................................................................................................................. 6-8
6.8.2 Monitoring Plan ..................................................................................................................... 6-8
6.9 Soil Protection and Landslide Control Management Plan IFC PS 3 ................................. 6-9
6.9.1 Management Plan ................................................................................................................. 6-9
Table of Contents
ii
6.9.2 Monitoring Plan ..................................................................................................................... 6-9
6.10 Surface Run Off, Erosion and Sedimentation Control Management Plan - IFC PS 3 . 6-9
6.10.1 Management Plan ................................................................................................................. 6-9
6.10.2 Monitoring Plan ...................................................................................................................6-10
6.11 Community Health, Safety and Security Plan – IFC PS 4 ....................................................6-10
6.11.1 Management Plan ...............................................................................................................6-10
6.11.2 Monitoring Plan ...................................................................................................................6-11
6.12 Land Acquisition & Resettlement Action Plan (LARAP) or Supplemental
Resettlement Action Plan (SRAP) – IFC PS 5 ...........................................................................6-11
6.12.1 Management Plan ...............................................................................................................6-11
6.12.2 Monitoring Plan ...................................................................................................................6-11
6.13 Solid Waste Management Plan – IFC PS 3 .................................................................................6-12
6.13.1 Management Plan ...............................................................................................................6-12
6.13.2 Monitoring Plan ...................................................................................................................6-12
6.14 Water Waste Management Plan – IFC PS 3 ..............................................................................6-13
6.14.1 Management Plan ...............................................................................................................6-13
6.14.2 Monitoring Plan ...................................................................................................................6-13
6.15 Hazardous Waste Management Plan – IFC PS 3 .....................................................................6-13
6.15.1 Management Plan ...............................................................................................................6-13
6.15.2 Monitoring Plan ...................................................................................................................6-14
6.16 Water Resources Efficiency and Pollution Prevention Management Plan - IFC PS
3 & IFC PS 6 ............................................................................................................................................6-14
6.16.1 Management Plan ...............................................................................................................6-14
6.16.2 Monitoring Plan ...................................................................................................................6-15
6.17 Aquatic Biota and Habitat Protection Management Plan - IFC PS 6 ..............................6-15
6.17.1 Management Plan ...............................................................................................................6-15
6.17.2 Monitoring Plan ...................................................................................................................6-15
6.18 Terrestrial Flora and Habitat Conservation Management Plan - IFC PS 6..................6-16
6.18.1 Management Plan ...............................................................................................................6-16
6.18.2 Monitoring Plan ...................................................................................................................6-16
6.19 Wildlife Protection and Conservation Management Plan - IFC PS 6 .............................6-16
6.19.1 Management Plan ...............................................................................................................6-17
6.19.2 Monitoring Plan ...................................................................................................................6-17
6.20 Indigenous People Plan (IPP) – IFC PS 7 ...................................................................................6-17
6.20.1 Management Plan ...............................................................................................................6-17
6.20.2 Monitoring Plan ...................................................................................................................6-18
6.21 Cultural Heritage Plan (CHP) – IFC PS 8 ....................................................................................6-18
6.21.1 Management Plan ...............................................................................................................6-18
6.21.2 Monitoring Plan ...................................................................................................................6-19
6.22 Project Closure Plan ...........................................................................................................................6-19
6.22.1 Management Plan ...............................................................................................................6-19
6.22.2 Monitoring Plan ...................................................................................................................6-19
Section 7 Evaluation & Improvement ........................................................................................ 7-1
Section 8 Reporting .......................................................................................................................... 8-1
Section 9 Organization & Implementation............................................................................... 9-1
Section 10 Budget ............................................................................................................................. 10-1
Section 11 Specific Procedures .................................................................................................... 11-1
Table of Contents
iii
List of Tables
Table 1: Example of regulations and permits list....................................................................................... 3-1
Table 2: Example of budget table. .................................................................................................................. 10-1
List of Appendices
Appendix A Example of ESMP Matrix
Appendix B Example of ESMP Matrix Modified from UKL UPL Matrix
Explanation of This Guideline and Template
iv
Explanation of This Guideline and Template
The Millennium Challenge Corporation (MCC) has entered into a Compact with the Government of
Indonesia (GoI) to support the Government’s development objectives in three important areas: Green
Prosperity (GP), Community-Based Health and Nutrition (CHN), and Procurement Modernization
(PM). The Compact is managed in three separate main Projects, the Green Prosperity Project (GP
Project), the Community-based Health and Nutrition Project (CHN Project) and the Procurement
Modernization Project (PM Project). GoI established a trust institution – the Millennium Challenge
Account Indonesia (MCA-Indonesia) – to manage and implement the Compact and its three projects
on behalf of the GoI. The Compact entered into force on April 2, 2013 and its five-year timeline will
conclude on April 1, 2018.
MCA-Indonesia investments and operations aim to maximize environmental and social benefits for
the people of Indonesia (including women and vulnerable groups), and minimize the adverse impacts
to the environment and society. As such, all MCA-Indonesia investments and operations shall comply
with the ESMS Framework, which is based on safeguard laws and regulations of the Government of
Indonesia, MCC Environmental Guidelines and Gender Policy, and the IFC Performance Standards on
Environmental and Social Sustainability.
As one of the three main projects under the Indonesia Compact, the Green Prosperity (GP) Project is
subject to comply with environmental and social safeguards described in the MCC Environmental
Guidelines. To achieve this, MCA-Indonesia has developed the MCA-Indonesia Environmental and
Social Management System (ESMS) Framework as the main reference for environmental and social
management in MCA-Indonesia and to act as the Tier-1 main policy and implementation framework
for the tiered approach ESMS in the Indonesia Compact. At the GP Project level, MCA-Indonesia also
developed the Tier-2 GP Project Environmental and Social Management System (GP Project ESMS) as
a framework to guide environmental and social performance for the GP Project.
For those interested in the GP Facility, GP Project ESMS is the main reference for developing
expressions of interest, concept notes, project proposals, and ultimately the main reference for
developing the Tier-3 GP Investment or GP Specific-project ESMS for projects selected for GP funding.
This guideline is intended to provide a practical guide and a standard template to help Grantee under
Green Prosperity Program to develop and implement a Project Level ESMS. This guideline is also
useful for PMC (Program Management Cosnultant) to review ESMS document submitted by grantee
as part of deliverable. This guideline and standard template was prepared by referring to:
1. Milenium Challenge Account Indonesia (MCA-Indonesia), Environmental and Social Management
System (ESMS) Framework Tier 1, February 2013;
2. Green Prosperity Project (GP Project) ESMS Tier 2, MCA-Indonesia, Version 1.1., September
2014;
3. International Finance Corporation (IFC) – World Bank Group, ESMS Implementation Handbook –
General, Version 2.1., November 2015; and
4. International Finance Corporation (IFC) – World Bank Group, ESMS Implementation Handbook –
Construction, Version 2.2., June 4, 2014.
This section provides proposed Table of Contents of Project Level – ESMS and a brief instruction of
the contents for each chapter/sub chapter.
Term and Definitions
v
Term and Definitions
This section provide definition or abbreviation of terms used in this Project ESMS.
For example:
Environmental
aspect (EA)
Elements of an organisation’s activities or products or services that
can interact with the environment.
Environmental
impact
Any change to the environment, whether adverse or beneficial,
wholly or partially resulting from an organisation’s environmental
aspects.
Environmental
management
system (EMS)
Part of an organisation’s management system used to develop and
implement its environmental policy and manage its environmental
aspects.
Environmental
objective
Overall environmental goal, consistent with the environmental policy,
that an organisation sets itself to achieve.
Section 1
General
1-1
Section 1 General
This section provide a brief information of PROJECT’s background (owner/ proponent, location,
technology use, capacity, activities, etc.) and the relation of the project with MCA-Indonesia GP Program
as well as other relevant project information.
Section 2
Project Landscape & Lifescape
2-1
Section 2 Project Landscape & Lifescape
This section provide a brief information of project’s landscape and lifescape derived from the project’s
Landscape and Lifescape Analysis (L-L Analysis) and, if any, other GP project L-L Analysis within the
landscape.
Section 3
Environmental and Social Safeguard Compliance
3-1
Section 3 Environmental and Social Safeguard Compliance
3.1 Project Policies Statement This section provide a clear written of Project Proponent’s statement to comply with the following
policies:
1. MCA Indonesia’ Social and Environmental Safeguard Policies;
2. MCA Indonesia’ Social Gender Integration policy;
3. IFC’s Policy on Environmental and Social Sustainability; and
4. Commitment to comply with GOI regulations.
The policies shall describes Project Proponent’s commitments, roles, and responsibilities related to
environmental and social sustainability. The Policy Statement should be clear and simple – it does not
need to be long and technical like a legal document. The Policy Statement should be signed by project
owner/management.
Many projects already have a code of conduct that servers as a Policy Statement and includes issues such
as ethics. The existing code of conduct can be expanded to align with Compact Agreement, MCA-
Indonesia’s Environmental, Social and Gender Policy, and recognized environmental and social standards
for issues relevant to the project such as IFC Performance Standards for Environmental and Social
Sustainability (IFC, 2012).
3.2 Legal Compliance This section provide register of all relevant Indonesia Social and Environmental Regulations and permits.
Table 1: Example of applicable regulations and permits list.
IFC List of GOI Regulations List of Permits IFC PS 1. Assessment and
Management of Environmental and
Social Risks
and Impacts
• Law No 32 of 2009 on
Environmental Protection and
Management
• PP 27/2012 Environmental
Permit
• ...
• Environmental Permit
• ......
IFC PS 2. Labor and Working
Conditions • UU-20-1999 ratification of ILO
Convention No.138 concerning
minimum age for admission to
employment;
• ...
N/A
IFC PS 3. Resource Efficiency and
Pollution Prevention • PP No 101/2014 hazardoues
waste management
• PerMen PU No 37/2015 on
water usage permit
• ....
• PPLH permit
• Temporary hazardous storage
permit
• Water Usage Permit
• ...
IFC PS 4. Community Health, Safety,
and Security
IFC PS 5. Land Acquisition and
Involuntary Resettlement
IFC PS 6. Biodiversity Conservation
and Sustainable Management of
Living
Section 3
Environmental and Social Safeguard Compliance
3-2
IFC List of GOI Regulations List of Permits Natural Resources
IFC PS 7. Indigenous Peoples
IFC PS 8. Cultural Heritage
Section 4
ESMS Framework
4-1
Section 4 ESMS Framework
This section provide a clear description of purpose, objective, scope and target of this ESMS.
4.1 Purpose of ESMS This manual defines the Environmental and Social Management System (ESMS) and Environmental
and Social Management Plan (ESMP) of [PROJECT NAME’s] activities. This section should reiterate the
project’s effort to comply with MCA-Indonesia Environmental and Social Safeguard requirement as well
as Indonesia’s legal compliance.
4.2 Objective of ESMS The objectives of this ESMS are: provide guidance and direction for the implementation and operation
of the ESMS and ESMP to project managent and all personnel, including providing access to all relevant
documents.
4.3 Scope of ESMS The scope of ESMS is determined based on the project’s L-L Analysis and the (Enviornmental and Social
Performance Datasheet (ESPD) that have been filled by grantee. The L-L Analysis and the ESPD is the
initial identification of project environmental and social risk and impact based on IFC PS triggered by
the project activities. In addition, this secton should also include determining the IFC’s project
environmental and social categorization and the level of environmental and social impact assessment
needed by the project.
This ESMS apply for all Project’s activities which include project preparation/development stage
(stakeholder engagement, public consultation, permitting, surveys, land acquisition/resettlement,
etc.), construction (material and equipment mobilization, land clearing, earthwork, building
construction, equipment installation, electrical installation, transmission line, etc.), project
implementation/operation and project closure/compact closed-out.
Section 5
Assessment & Analysis
5-1
Section 5 Assessment & Analysis
This section provide information of all environmental and social assessment that have been conducted to
identify project risk and impacts.
5.1 Project Initial Screening and Scoping Assessment This section provide information of preliminary assessment and analysis conducted which may include
initial or primary due diligence, environmental audits, gap analysis, LL Analysis, ESPD, screening and/or
scoping whenever applicable to identify and recommend any required environmental and social
assessments, analysis or studies based on identified risks and impacts, or triggered performance
standards.
5.2 Environmental and Social Impact Assessment The primary objective of a risk assessment is to identify both potential negative and positive
environmental and social impacts so Project Implementer can develop the appropriate strategies to
address them in the environmental and social action plan (ESAP) or environmental and social
management plan (ESMP).
This sub section provides a clear identification of project risks and impacts identified in the LL Analysis
report, ESPD, Social and Environmental Risk and Impact Assessment (ESIA/ESHIA /AMDAL/UKL UPL)
and other relevant additional studies (whenever applicable) such as Stakeholders and Community
Assessment and Mapping, Hazard Identification and Risk Assessment, Ecosystem Service and Biodiversity
Study, Indigenous People Study; Cultural Heritage Study; Beneficiaries Assessment; Land Acquisition and
Resettlement Assessment/Audit; and Social Gender Assessment. Identification of project risks and
impacts can be provided in the form of Risk Registry.
Section 6
Environmental & Social Management Plan
6-1
Section 6 Environmental & Social Management Plan
The ESMP will consist of comprehensive management of all environmental and social risk and impact
mitigation measures, derived from all assessment and study efforts conducted on the project. The
mitigation hierarchy to address identified risks and impacts will favor the avoidance of impacts over
minimization, and, where residual impacts remain, compensation/offset, wherever technically and
financially feasible.
The management plan should include: Social and Environment Management Plan (ESMP) taken from
Rencana Pengelolaan Lingkungan and Rencana Pemantauan Lingkungan (RKL RPL) or Upaya
Pengelolaan Lingkungan and Upaya Pemantauan Lingkungan (UKL UPL) plus additional ESMPs based
on project risk identification and IFC gap analysis as well as mandatory action plans required by MCA-
Indonesia which include but not limited to Stakeholders and Community Engagement Plan (SEP), Public
Consultation & Disclosure Plan (PCDP), Occupational Health and Safety Action Plan, Community Health,
Safety and Security Plan, Emergency Preparedness and Response Plan (EPRP), Land Acquisition &
Resettlement Action Plan (LARAP) or Supplemental Resettlement Action Plan (SRAP) or Land Acquisition
Audit, Biodiversity & Ecosystem Service Action Plan, Grievance Mechanism, Indigenous People Plan (IPP)
(optional whenever applicable), Cultural Heritage Plan (CHP) (optional whenever applicable) and
Chance Find Procedure (optional whenever applicable) and Project Closure Plan (include project
handover and compact project closed-out). This section should also state that this ESMS also reffers to P-
SGIP and Benefit Sharing Action Plan as stand alone documents, but part of GP Project-level management
plan in addition to ESMP.
Part of the outcome of the AMDAL or UKL/UPL process is an environmental management plan and
environmental monitoring plan (in the form of RKL RPL matrix or UKL UPL matrix). In order to ensure
proper Design and Implementation of Environmental and Social Management Plans, the project
implementer shall prepare the RKL or UKL in such a way that it comprehensively addresses mitigation
and management of (remaining) environmental and social impacts.
Since the contents of the RKL matrix or UKL matrix will become the basis of Environmental Permit
conditions, the management plan at minimum shall have the following characteristics:
1. Clear objective and targets;
2. Specific and measurable actions;
3. Location of actions;
4. Timing and realistic frequency or duration of actions;
5. Person in charge; and
6. Applicable procedures as required.
Aspects or parameters of risks and impacts that are not included in the Environmental Permit
(RKL matrix or UKL matrix), but identified in LL Analysis and other additional studies shall
remain in the Environmental and Social Management Plan, and shall be implemented with the
same diligence as those in the Environmental Permit.
Section 6
Environmental & Social Management Plan
6-2
As part of management plan, project implementer will monitor the implementation of ESMP. For each
management plan, project implementer will explain the following:
1. Specific and measurable indicators
2. Method of monitoring
3. Location of monitoring
4. Timing and realistic frequency or duration of monitoring;
For each management plan, Project Implementer is expected to describe it (whenever applicable
for the project) in the following sub chapters:
6.1 Project Consultation and Disclosure Plan (PCDP) – IFC PS 1
6.1.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required: (to mention applicable procedure for example:
please refer to SOP No. 001 SOP for conducting project socialization and consultation
meeting).
6.1.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
Section 6
Environmental & Social Management Plan
6-3
6.2 Emergency Preparedness and Response Plan (EPRP) - IFC PS 1
6.2.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.2.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
Section 6
Environmental & Social Management Plan
6-4
6.3 Grievance Mechanism – IFC PS 1
6.3.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.3.2 Monitoring Plan
• Specific and measurable indicators:
Emergency plans should address the following aspects of emergency preparedness and response: � Identification of the emergency scenarios � Specific emergency response procedures � Trained emergency response teams � Emergency contacts and communication systems/protocols (including communication with
Affected Communities when necessary) � Procedures for interaction with government authorities (emergency, health, environmental
authorities) � Permanently stationed emergency equipment and facilities (e.g., first aid stations, firefighting
equipment, spill response equipment, personal protection equipment for the emergency response teams)
� Protocols for the use of the emergency equipment and facilities � Clear identification of evacuation routes and muster points � Emergency drills and their periodicity based on assigned emergency levels or tiers � Decontamination procedures and means to proceed with urgent remedial measures to contain,
limit and reduce pollution within the physical boundaries of the project property and assets to the extent possible.
Section 6
Environmental & Social Management Plan
6-5
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.4 Stakeholder Engagement Plan (SEP) - IFC PS 2
6.4.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.4.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
Section 6
Environmental & Social Management Plan
6-6
6.5 Occupational Health and Safety Action Plan – IFC PS 2
6.5.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.5.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.6 Dust Control Management Plan – IFC PS 3
6.6.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
Section 6
Environmental & Social Management Plan
6-7
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.6.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.7 Air Pollution & Green House Gasses (GHG) Control and Reduction Management Plan - IFC PS 3
6.7.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
Section 6
Environmental & Social Management Plan
6-8
6.7.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.8 Noise Control Management Plan - IFC PS 3
6.8.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.8.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
Section 6
Environmental & Social Management Plan
6-9
• Timing and realistic frequency or duration of monitoring:
6.9 Soil Protection and Landslide Control Management Plan IFC PS 3
6.9.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.9.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.10 Surface Run Off, Erosion and Sedimentation Control Management Plan - IFC PS 3
6.10.1 Management Plan
• Clear objective and targets:
Section 6
Environmental & Social Management Plan
6-10
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.10.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.11 Community Health, Safety and Security Plan – IFC PS 4
6.11.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
Section 6
Environmental & Social Management Plan
6-11
• Person in charge (implementer):
• Applicable procedures as required:
6.11.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.12 Land Acquisition & Resettlement Action Plan (LARAP) or Supplemental Resettlement Action Plan (SRAP) – IFC PS 5
6.12.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.12.2 Monitoring Plan
• Specific and measurable indicators:
Section 6
Environmental & Social Management Plan
6-12
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.13 Solid Waste Management Plan – IFC PS 3
6.13.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.13.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
Section 6
Environmental & Social Management Plan
6-13
6.14 Water Waste Management Plan – IFC PS 3
6.14.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.14.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.15 Hazardous Waste Management Plan – IFC PS 3
6.15.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
Section 6
Environmental & Social Management Plan
6-14
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.15.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.16 Water Resources Efficiency and Pollution Prevention Management Plan - IFC PS 3 & IFC PS 6
6.16.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
Section 6
Environmental & Social Management Plan
6-15
6.16.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.17 Aquatic Biota and Habitat Protection Management Plan - IFC PS 6
6.17.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.17.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
Section 6
Environmental & Social Management Plan
6-16
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.18 Terrestrial Flora and Habitat Conservation Management Plan - IFC PS 6
6.18.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.18.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.19 Wildlife Protection and Conservation Management Plan
Section 6
Environmental & Social Management Plan
6-17
- IFC PS 6
6.19.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.19.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.20 Indigenous People Plan (IPP) – IFC PS 7
6.20.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
Section 6
Environmental & Social Management Plan
6-18
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.20.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.21 Cultural Heritage Plan (CHP) – IFC PS 8
6.21.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
Section 6
Environmental & Social Management Plan
6-19
6.21.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
• Timing and realistic frequency or duration of monitoring:
6.22 Project Closure Plan/ Project Handover and Compact Project Closed-Out
6.22.1 Management Plan
• Clear objective and targets:
• Specific and measurable actions:
• Location of actions:
• Timing and realistic frequency or duration of actions:
• Person in charge (implementer):
• Applicable procedures as required:
6.22.2 Monitoring Plan
• Specific and measurable indicators:
• Method of monitoring:
• Location of monitoring:
Section 6
Environmental & Social Management Plan
6-20
• Timing and realistic frequency or duration of monitoring:
Note: Appendix A provide example of Environmental and Social Management and Monitoring Plan
matrix from the above management plans, while Appendix B provide example of ESMP matrix modified
from UKL UPL matrix.
Section 7
Evaluation & Improvement
7-1
Section 7 Evaluation & Improvement
This section provide description of how the project implementer will record and evaluate the
implementation of ESMP and will continously improve the ESMS and ESMP. The mechanism may include:
1. Non Conformity, Corrective Action and Preventive Action. Provide mechanism to modify actions or
corrective action plan should monitoring show unexpected impacts;
2. Evaluation of Compliance;
3. Control of Records;
4. Internal Audit;
5. Effective Management Review; and
6. ESMP measurement and improvement.
Section 8
Reporting
8-1
Section 8 Reporting
This section provide information how project implementer will report the implementation of ESMP to
relevant parties which include:
1. External Communication and reporting to affected people;
2. Regular six months of RKL RPL or UKL UPL implementation reporting to GOI; and
3. ESMP implementation reporting to MCA-Indonesia.
Section 9
Organization & Implementation
9-1
Section 9 Organization & Implementation
This section provide information of roles, responsibilities and authority to implement the ESMS. The
information shall include:
1. Organizational Chart;
2. Resources, Roles, Responsibility and Authority.
(define resources, roles, responsibility and authority of the following: Top Management,
Environmental Management Representative (EMR), Environmental Management System
Committee (EMS Committee)/Management Review Committee, Functional/Departmental
Manager, and All Employee); and
3. Competence, Training and Awarness.
(define competency of EMR, EMS Committee and others entity, plan training to increase
capacity/competency of each entity, and plan/implement awareness program).
Section 10
Budget
10-1
Section 10 Budget
This section define costs to cover mitigation measures, which will then input into the project costing or
feasibility study (in form of budget table).
Table 2: Example of budget table. No. Activity/Action Plan Unit Cost Frequency Total Budget
1. Stakeholders engagement meeting
2. Project Consultation and Socialization
3. Surface water monitoring
4. Biodiversity monitoring
5. Training for environmental officer
...
Section 11
Specific Procedures
11-1
Section 11 Specific Procedures
This section provide relevant Standard Operation Procedures (SOP) that may include but not limited to
following:
1. Health & Safety Procedures;
2. Human Resources and Administrative Procedures;
3. Hazardoues Waste Handling and Storage Procedures;
4. Pest Control Procedures;
5. Pesticides Handling and Storage Procedures;
6. Resources and Energy Effeciency Procedures;
7. Chance Find Procedure; and
8. Other Specific Procedures (can be added as necessary).
A-1
Appendix A
Example of ESMP matrix
No. Activities Risk/Impact
Management Plans Monitoring Plans
Action Plan
Clear
objective &
targets
Specific &
measurable
actions
Location of
actions
Timing &
realistic
frequency
Person in
charge
Applicable
procedures
Specific &
measurable
indicators
Method of
monitoring
Location of
monitoring
Timing &
realistic
frequency
1. Training Negative/
Positive
perception
PCDP Maintain
community
perception on
the project
Disclose and
consult the
project
activities,
potential
impacts and
proposed
mitigation
with
community
which include
women and
vulnerable
group as well
indiginous
people if they
exist.
Village
hall/district
office, or just
mention the
village/sub
district/dictrict
name
One time per
village/sub
district
(depend on
the needs)
Anyone
assigned to do
the task (for
example
External
Communication
Unit or Public
Consultation
Coordinator)
Mention the
available
procedure, for
example Doc
001_Public
Consultation
Procedures
Pros/contra
statement from
community as
well as comments
and inputs
recorded/noted in
minute of meeting
Document records of:
• Attendee list
(show the
involvement of
women,
vulnerable group,
and/or indigenous
people.
• Minutes of
meeting
• Photographs/
Video
documentation
Village
hall/district
office, or
just
mention the
village/sub
district/dict
rict name
One time per
village/sub
district
(depend on
the needs)
Health &
Safety risk to
employee and
community
Health &
Safety Plan
Zero
accidents,
zero time lost
• Safety
induction
• Provide
first aid
• Emergency
response
Village
hall/district
office, or just
mention the
village/sub
district/dictrict
name
One time per
village/sub
district
(depend on
the needs)
Health & Safety
Officer or
anyone assigned
to do the task
Mention the
available
procedure, for
example Doc
030_Safety
induction, Doc
031_First aid,
Doc
032_Emergency
Preparedness
and Response
No accidents Accidents recorded Village
hall/district
office, or
just
mention the
village/sub
district/
dictrict
name
One time per
village/sub
district
(depend on
the needs)
Grievances Grievance
Mechanism
Grievances
from Affected
Communities
and external
communicatio
ns from other
stakeholders
Receive and
facilitate
resolution of
Affected
Communities’
concerns and
grievances
Village
name/sub
district/ district
where the
project located
During and
after the
training
External
communication
Doc_025_Grieva
nce record and
response
procedures
All grievance/
disputes are
recorded and
resolved
Grievance records Village
name/sub
district/
district
where the
project
located
During and
after the
training
A-2
No. Activities Risk/Impact
Management Plans Monitoring Plans
Action Plan
Clear
objective &
targets
Specific &
measurable
actions
Location of
actions
Timing &
realistic
frequency
Person in
charge
Applicable
procedures
Specific &
measurable
indicators
Method of
monitoring
Location of
monitoring
Timing &
realistic
frequency
are
responded to
and managed
appropriately
about the
project’s
environmental
and social
performance
Social
jealousy
Stakeholder
Engagement
Plan (SEP)
Stakeholder
identification
and mapping
to identify
training
beneficiaries
Training
beneficiaries
are well
identified
Village
name/sub
district/ district
where the
project located
Before
training
conducted
External
communication
or training
coordinataor
Doc
017_Organizing
Training
Procedures
Positive
response/input or
no grievance from
trainee nor from
community
Stakeholder
identification and
mapping report
Village
name/sub
district/
district
where the
project
located
Before
training
conducted
B-1
Appendix B
Example of ESMP matrix modified from UKL UPL matrix
No
Project Risk & Impact Identified Management Plan Monitoring Plan
ESMP
Impelementer &
Supervisory
Institution
Project
Activity
(Source of
Impacts)
Type of
Impact
Magnitute
of Impact
Mitigation
Action Plans
Clear
objective &
targets
Applicable
procedures Location
Person in
Charge Time
Monitoring
Action Plans
Specific &
measurable
indicators
Location Time
PRE CONSTRUCTION
A. ESMP from UKL UPL (Rewrite environmental management plan from UKL UPL)
1. Preliminary
survey
People
perception
Moderate Conduct project
socialization/
Public
Consultation and
Disclosure Plan
(PCDP)
Maintain
community
perception
on the
project
• Project
disclosure
procedure
• Minute of
meeting
and
documenta
tion
procedure
Village
hall
Anyone
assigned to do
the task (for
example
External
Communication
Unit or Public
Consultation
Coordinator)
First
week
of
June
Document
records of:
• Attendee list
(show the
involvement of
women,
vulnerable
group, and/or
indigenous
people.
• Minutes of
meeting
• Photographs/
Video
documentation
Pros/contra
statement from
community as
well as
comments and
inputs
recorded/note
d in minute of
meeting
Village
hall
First
week
of
June
a. Implementer: PT.
XX Company,
Public Relation
Unit/
Department.
b. Supervisory
Institution: BLHD
(& MCA
Indonesia).
c. Agency receiving
report: BLHD (&
MCA Indonesia?).
2. Worker
recruitment
People
perception
High Prioritize local
worker;
Transparant
recruitment
process
• HR Policy
and
labour/wor
ker
recruitmen
t procedure
Village
hall
HR Department First
week
of
June
Documentation of
the recruitment
process
Number of local
worker
recruited
Village
hall
First
week
of
June
a. Implementer: PT.
XX Company,
Human Resouces
Unit/Department.
b. Supervisory
Institution: BLHD
(& MCA
Indonesia).
c. Agency receiving
report: BLHD (&
MCA Indonesia).
B-2
No
Project Risk & Impact Identified Management Plan Monitoring Plan
ESMP
Impelementer &
Supervisory
Institution
Project
Activity
(Source of
Impacts)
Type of
Impact
Magnitute
of Impact
Mitigation
Action Plans
Clear
objective &
targets
Applicable
procedures Location
Person in
Charge Time
Monitoring
Action Plans
Specific &
measurable
indicators
Location Time
3. Etc.
B. Additional ESMP as necessary and whenever applicable (based on TAPP result)
1. Preliminary
survey
People
perception
Moderate Stakeholder
Enggagement
Plan:
• Coordinate
with relevant
stakeholder.
• Obtain relevant
permit
Number of
relevant
stakeholder
s & affected
people as
well
aswomen
and
vulnerable
groups are
identified &
involved in
the
consultatio
n
• Project
disclosure
procedure
• Minute of
meeting
and
documenta
tion
procedure
Village
hall
First
week
of
June
Document
records of:
• Attendee list
(show the
involvement of
women,
vulnerable
group, and/or
indigenous
people.
• Minutes of
meeting.
• Photographs/
Video
documentation
Village
hall
First
week
of
June
a. Implementer: PT.
XX Company,
Public Relation
Unit/
Department.
b. Supervisory
Institution: BLHD
(& MCA
Indonesia).
c. Agency receiving
report: BLHD (&
MCA Indonesia).
Project
Consultation &
Disclosure Plan
(PCDP):
• Publish
multimedia
project
information;
• Provide project
information/
announcement
board;
• Arrange public
consultation;
• Involve men,
women,
vulnerable
groups, and
relevant
stakeholders
based on
stakeholder
mappping and
analysis.
B-3
No
Project Risk & Impact Identified Management Plan Monitoring Plan
ESMP
Impelementer &
Supervisory
Institution
Project
Activity
(Source of
Impacts)
Type of
Impact
Magnitute
of Impact
Mitigation
Action Plans
Clear
objective &
targets
Applicable
procedures Location
Person in
Charge Time
Monitoring
Action Plans
Specific &
measurable
indicators
Location Time
2. Worker
recruitment
People
perception
High Social Gender:
1. Promote non
discriminative
worker
recruitment.
2. Ensure women
have a fair
opportunity
and well
informed.
Village
hall
First
week
of July
• Attendee list·
• Minutes of
meeting·
• Documentation
number or
worker
recruited
(percentage of
local/non local
worker and
number of
men/women
recruited.
Village
hall
First
week
of
June
a. Implementer: PT.
XX Company,
Human Resources
Unit/Department.
b. Supervisory
Institution: BLHD
& MCA Indonesia.
c. Agency receiving
report: BLHD &
MCA Indonesia.
Grievance
Mechanisme:
1. Record any
complain, input
and comments
from
community
and/or
stakeholders
2. Response the
grievance
CONSTRUCTION
A. ESMP from UKL UPL (Rewrite environmental management plan from UKL UPL)
1.
Mobilization
Deterioration
of air quality
(dust)
Minor
• Covering
material load.
• Speed
management.
B-4
No
Project Risk & Impact Identified Management Plan Monitoring Plan
ESMP
Impelementer &
Supervisory
Institution
Project
Activity
(Source of
Impacts)
Type of
Impact
Magnitute
of Impact
Mitigation
Action Plans
Clear
objective &
targets
Applicable
procedures Location
Person in
Charge Time
Monitoring
Action Plans
Specific &
measurable
indicators
Location Time
B. Additional ESMP as necessary and whenever applicable (based on TAPP result)
1. Mobilization GHG emission
from vehicles
Minor GHG reduction &
resouces
efficiency plan:
• Reduce
number of
vehicle as
much as
possible
• Identify
effective route
• Engine off
when idle
Health and
safety of
workers
Moderate Occupational
Health & Safety
Plan:
• Conduct
Hazzard
identification
• Apply safety
induction
• Equipped with
PPE
Community
helath &
Safety
Moderate
Community
Health & Safety
Plan:
• Install traffic
sign
• Safety talk
2. Land clearing
3.
B-5
No
Project Risk & Impact Identified Management Plan Monitoring Plan
ESMP
Impelementer &
Supervisory
Institution
Project
Activity
(Source of
Impacts)
Type of
Impact
Magnitute
of Impact
Mitigation
Action Plans
Clear
objective &
targets
Applicable
procedures Location
Person in
Charge Time
Monitoring
Action Plans
Specific &
measurable
indicators
Location Time
OPERATION
A ESMP from UKL UPL (Rewrite environmental management plan from UKL UPL)
1. Commisioning water quality
deterioration
Disturbance
on aquatic
biota
Sedimentation
B. Additional ESMP as necessary and whenever applicable (based on TAPP result)
1.
Implementatio
n of Benefit
Sharing
2. Grievance
Mechanism
3
Other
Management
Plans