NIL-STD-2194(SH)
12 February 1988
MILITARY STANDARD.
INFRAREDTHERMAL IMAGING SURVEY PROCEDURE
FOR
ELECTRICALEQUIPMENT
AMSC N/A
FSC 5855
DISTRIBUTIONSTATEMENTA Approved for public release;distributionunlimited
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
2/26
MIL-STD-2194(S11)
12 February 1988
DEPARTMENTOF DEFENSE
NAVAL SEA SYSTEMS COMMAND
Washington,
DC 20362-5101
InfraredThermal ImagingSurvey Procedurefor ElectricalEquipment
1.
This Military Standardis approvedfor use by the Naval Sea SystemsCommandj
Departmentof the Navy, and is available for use by all Departmentsand Agencies
of the Departmentof Defense.
2.
Beneficialcomments (recommendations,additions,deletions)and any per-
tinentdata which may be of use in improvingthis document should be addressed
to:
Commander,Naval Sea Systems Command,
SEA 5523, Departmentof the Navy,
Washington,DC 20362-5101by using the self-addressedStandardizationDocument
ImprovementProposal (DD Form 1426) appearingat the end of this documentor by
letter.
ii
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
3/26
NIL-STD-2194(SH)
12 February 19S8
COhqENTS
Page
Paragraph 1.
1.1
2.
2.1
2*2
3.
3.1
3.2
3.3
3.4
3*5
3.6
3.7
3.8
3.9
3.10
5.
5.1
5.2
5.3
5.4
5.4.1
5.4.1.1
5.4,1.2
5.4.1.3
5.4.1.4
5.4.2
5.4.3
5.4.4
5.4.5
5.5
5.5.1
5.5.2
SCOPE ................OOOOOOWO.CO**O.O--*O
Scope ..........o...OO.OOOOooo--o
REFERENCEDDOCUtlENTS..............................
Governmentpublication. ..........................
Order of precedence
. s . . . . . . . . . . . . . . . . . . . . . . . . . . . .
DEFINITIONS .......................................
Electricalequipment .............................
Electronicequipment .............................
Phase I survey ...................................
Phase II survey ..................................
Normal loading ...................................
Thermogram ......................................,
Gray scale .......................................
Reference temperature.............................
Hot spot ........~.0.o..c0.00.co..O.o.o..o...o.o
Cold spot............-................
GENERAL REQUIMMENTS ..............................
Phase Iand II survey.. ..........................
DETAILED REQUIREMNTS .............................
Electricalequipmentto be surveyedduring
phase I ............-....o.G..*.*..**.**
Electricalequipmentto be surveyedduring
phaseII ..............+**s*o*.**.*
Electricalequipmentwhich does not have to
re surveyed .....................................
Survey procedures ................................
Preliminary ......................................
Safety ...................................-
Ships force assistance ..........................
Equipment loading ................................
Sequenceof equipmentto be surveyed ............*
Test equipmentcalibrationand
operationalchecks ..............................
Proceduresfor checkinghot or cold spots on
electricalequipment ............................
Potentialhot or cold spot locations.............
Equipmentnot available for survey ...............
Infraredthermal imagingEEGL survey
report ...........OOOOQoOOCOOCOSOOOOOOO****w.
Preliminaryreport ...............................
Final report
...*..** *.*****.-*......
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
~
2
2
2
2
2
3
3
3
3
3
3
3
3
4
5
6
6
7
7
iii
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
4/26
NIL-STD-2194(SH)
12 February 1988
CONTENTS - Continued
paragraph6.
6.1
Figure 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Table
I.
NOTES ...........OOO--0--
Subjectterm (keyword) listing ..................
FIGURES
IRTI survey data sheet: descriptionof
individualequipmentproblems ....................
IRTI survey data sheet:
list of electrical
equipmentnot available for survey ...............
IRTI survey-preliminaryreport ....................
Abstract ..........................................
Summaryof problems and repairpriorities .........
Electricalequipmentguide list ...................
List of electricalequipmentnot available for
survey ......o.....o..o.o..Q*0******.....
Descriptionof individualequipmentproblems ......
IRTIsurvey-final report ..........................
Abstract ..........................................
Summaryof problems and repair priorities .........
List of electricalequipmentnot availablefor
survey ...........................................
Summarymatrix of electricalequipmentproblems ...
TABLE
Severity code .....................................
iv
Page
7
7
8
9
10
11
12
13
14
15
16
17
18
19
20
4
rl
mnw mnVnll arrrmlnr rnr urmfirrlma
11 t . . . . i
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
5/26
MIL-STD-2194(SH)
12 February 1988
1.
SCOPE
1.1 Scope.
This standardprovidesdetailedproceduresfor conductingan
infraredthermal imaging (IRT1)survey on electricalequipmentaboard ship.
An IRTI survey is recommendedfor new constructionships, pre-overhaultest and
inspection,post repair and overhaulchecks,and
ships electricalsystem occur.
2.
REFERENCEDDOCUMENT
2.1 Governmentpublication.
The following
whenevermajor changes to the
Governmentpublicationforms a
part of this standardto the extent specifiedherein.
OFFICE OF THE CHIEF OF NAVAL OPERATIONS (OPNAV)
OPNAVINST 51OO.19A -
Navy Safety Precautionsfor Forces Afloat.
(Copiesof the Governmentpublicationrequiredby contractorsin connection
with specificacquisitionfunctionsshould be obtained from the contracting
activityor as directed by the contractingofficer.)
2.2 Order of precedence.
In the event of a conflictbetween the text of
. .
this standardand the referencescited herein,
the text of this standardshall
take precedence.
3.
DEFINITIONS
3.1 Electricalequipment. Electricalequipment is equipment,other than
electronic,which is designedto generate,convert,distribute,control,or
utilize electricalenergy.
Examplesof electricalequipmentare generators,
switchboards,power panels,motor controllers,motor generators,and bus
transferswitches.
3.2 Electronicequipment. Electronicequipment is equipmentdesignedto
generate,transmit.,convey,store, process,or otherwiseuse electronic
signals. Examples of electronicequipmentare oscillators,transmitters
(sonar,radar,
and radio),amplifiers,sensing devices, receivers,computers,
underwaterdetection equipment,fire control equipment,drone control,and
associatedtest equipment.
3.3 Phase I survey.
The phase X survey is that part of the IRT1 survey,
specifiedherein,
that is conductedat dockside for the purpose of keeping the
phase 11 survey (underway)time to a minimum.
The phase I survey temperature
measurementsare performedon all electricalequipmentwhich can be operated
docksideunder normal operatingconditions.
3.4
Phase II survey. The phase 11 survey is that part of the IRTI
survey, specifiedherein, that is conductedwhile the ship is underway. The
phase II survey temperaturemeasurementsare performed on all electrical
equipmentwhich can only be operated at sea under normal operating conditions,
and the balance of the electricalequipmentnot availableduring the phase I
survey.
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
6/26
NIL-STD-2194[SH)
12 February 19S8
3.5 Normal loading.
Normal loading is the levelof currentwhich would
be drawn by equipment,or through conductors,
under normal operatingconditions.
3.6 Thermogram. A thermogramis an instanthard copy photographof
the infraredimage.
3.7 Gray scale.
The gray scale is a referencescale on the monitor
containingbars of differentshades from dark to light.
3.8 Referencetemperature.
Referencetemperatureis the enclosure
temperatureof a piece of electricalequipmentor componentoperatingunder
normal loadingconditions.
3.9 Hot spot. A hot spot is any area of the equipmentwhich is surveyed
10 degrees Celsius (C)or more above the equipmentreferencetemperature.
3.10 Cold spot.
A cold spot is any area of the equipmentwhere the
surveyed temperatureis
less than the referencetemperatureand where there is an
indicationof an open connectionor componentor
some other similar type problem.
4.
GENERAI,REQUIREMENTS
4.1 Phase I and II survey.
The phase I and II surveys shall consistof
the following:
[a]
(b)
(c)
Tne IRTi survey shaii be planned and coorciina~edi~ilall
participatingpersonnelto ensure optimumutilizationof
docksideand underway time.
The ElectronicEquipmentGuide
List (EEGL)(if available)shall be used to identifyand
locatethe equipmentto be surveyed. At the conclusionof
the IRTI survey, a report shall be prepareddetailingthe
survey results (see 5.5).
Measuringthe temperatureof the EEGL equipmentwhile in normal
operatingmode.
Determiningcause for hot or cold spots on EEGL equipmentor
identifyingpotentialproblem areas for futureanalysesas
appropriate.
5. DETAILEDREQUIREMENTS
5.1 Electricalequipmentto be surveyedduring P
base 1.
Duringphase I
(dockside),
as much of the electricalequipmentas possibleshall be surveyed
to reduce the phase 11 (underway)workload.
Equipmentto be surveyedduring
phase I includesshore power switchboards,shore power connections,shore
power receptacles,cables,
and motor controllers(exceptas specifiedin 5.3).
5.2 Electricalequipmentto be surveyedduringp
base II.
During phase
XI survey, any equipment (exceptas specified in 5.3) which is on the EEGL and
could not be operatedwhile dockside, shall be surveyed.
This equipmentshall
include the following-:
I
I
I
I
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
7/26
NIL-STD-2194(SN)
12 February 1988
(~)
(b)
(c)
Electricalequipmentassociatedwith the anchorwindlassmotor,
whale boat, catapult,and underwayreplenishmentsystem.
Power panels,
transformers,and load centersprovidingpower
service to electronicequipmentand motors.
Steeringgear motors, direct current (de)propulsionmotors and
bow thrusters.
5.3 Electricalequipmentwhich does not have to be surveyed. Electrical
equipmentwhich does not have to be surveyed includesportableelectrical
equipment,office equipment,hand dryers,
shop equipment(drillpresses,
millingmachines, lathes, inductionfurnaces,
and so forth),ventilationduct
heating elements,and other types of electricalheating elements.
5.4 Survev procedures.
Survey proceduresshall be as specifiedin 5.4.1
through 5.4.5.
5.4.1 Preliminary. Procedurespreliminaryto the survey shall be as
specifiedin 5.4.1.1 through 5.4.1.4.
5.4.1.1 Safety. Ship electricalsafetyproceduresshall be followedat
all times. Forces afloat shall be in accordancewith OPNAVINST51OO.19A.
Unauthorizedpersonnel shall be kept away from equipmentbeing surveyedby the
use of barricadesand warning signs.
The IRTI test equipmentoperator shall
not extend the scanner across the plane of open electricalpanels or coverings.
5.4.1.2 Ships force assistance.
The survey team leadershall contact
the ships electricalofficer and request the assistanceof shipspersonnel
to gain-accessto all equipmentto be surveyed.
5.4.1.3 Equipment loading. Electricalequipmentto be surveyedshall be
under normal loadingconditionsand in service for at least 1/2 hour prior to
being surveyed.
5.4.1.4 Sequence of equipmentto be surveyed.
The shipsEEGL, if
available,shall be utilized to plan sequenceof testing since equipmentis
listedby location (compartmentlevel, frame, and athwartshipposition).
5.4.2 Test equipment calibrationand operationalchecks.
Only calibrated
test equipmentwill be used for the survey.
IRTI test equipmentshall be adjusted
each time equipmentis energized. Initiallyand when the IRTI test equipment is
operatedcontinuouslyfor long periods of time,
a gray scale check shall be made.
Proceduresfor the gray scale check shall be as follows:
(a) Turn the IRTI test equipmenton.
(b) Set the system to gray scale and adjust brightnessand
contrast for optimal viewing.
(c) Switch back to normal operation;do not adjustbrightness
or contrastwhile in normal operationalmode.
3
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
8/26
NIL-STD-2194(SH)
12 February 1988
5.4.3 Proceduresfor checkinghot or cold spots on electricalequipment.
Proceduresfor checkingfor hot or cold spots on electricalequipmentshall be
as follows:
(a)
(b)
(c)
Scan electricalequipmentbeing surveyedwhile observingthe
monitor for hot or cold spots using the ships EEGL (if available).
Note -
Most problemsare due to loose electricalconnectionssuch
as fuse connections,switch connections,breaker connections,and
terminal lugs, corrosion,and improperscrew or lug materialor
size. Anothercommon problem is the breakdownof wire insulation
and open componentsor connections.
When a potentialhot or cold spot is found, the IRTI test equipment
operatorshall determinethe temperaturedifferencebetween the
hot spot and backgroundby adjustingthe necessary IRTI test
equipmentcontrols (referto specific IRTI system operating
manual).
If the EEGL equipmentis found to have a hot or cold spot, the
followingprocedureshall be completed:
(1)
(2)
(3)
(4)
(5)
(6)
(7)
TWCIthcrrxtogramshall be taken showingthe faulty
componentwith isotherm level shown.
Two color,
instant.photographsshall be taken showing
the faultycomponent.
A severity code shall be assignedto the equipment
as specified in table 1.
Data shall be taken listingall necessary IRTI test
equipmentsettingsto verify the actualtemperature
differencebetween the hot spot and background.
Data shall be listed on sheet 1 of the IRTI survey
data sheet as shown on figure 1.
An arrow shall be affixedto the thermogramsand
color photographsto identifythe faultycomponent.
A numberingsystem shall be devisedby the survey
team leaderto match the color photographswith the
appropriatethermogram.
TABLE I.
Severitycode.1 3
v
Severity
Temperatureabove or below
Remarks
code
referencetemperature(C)
**
70 and above
Component (electrical)
failure inuninent.ztop
survey.
Inform cognizant
officers.
-
40 and above to less than 70
Component (electrical)
failure almost certain
unless corrected.
t
1
1
1
See footnotesat end of table.
1 -
1
w
[
-
I
I
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
9/26
MIL-STD-2194(SH)
12 February 1988
I
TABLE I. Severity code.1 s - Continued
Temperature above or below
Remarks
reference temperature (C)
--
everity
code
**
*
*
+
25 and above to less than 40
Above
10
and above O to less than 25
Below O to ambient
___-
Component (electrical)
failureprobable unless
corrected.
Component (electronic)
failureprobable
unless
corrected.
Component electrical)
failure unlikely but
corrective measure
required at next scheduled
routine maintenance
period or as scheduling
permits.
Component has probably
failed or degraded or been
affected by an upstream
component or equipment.
1
2
Applies to electrical, electronic, or
I.C.
equipment.
Some components such as coils,
resistors and the-l overload heaters may
have high temperature readings which are no-l.
The above general criteria have
been determined by past field experience
for maintenance scheduling. Final decision as to priorities and order of
maintenance shall be determined by the temperature above or below the reference
temperature,
the type of component
and the critical nature of the equipment
or system involved.
5.4.4 Potential hot or cold spot locations. When scanning the following
equipment>the accessible components
listed shall be specificallyobserved for
temperaturedifferencesabove
or below their normal operating temperatures.
a) Switchboards:
1) Bus bar connections.
(2)
Bus disconnect connection.
(3) Circuit breaker connections.
(4) Control wire terminalboard connections.
(5) Relay connections.
(6) Fuse holder connections.
.
.
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
10/26
ML-STD-2194(SH)
12 February 1988
I
(b)
(c)
(d)
(e)
(f)
Power lightingpanels and fuse distributionpanels:
(1) Line connections.
(2) Individualload connections.
(3) AQB circuit breaker contactsvia molded case signature,
fuse and fuse clip connectors.
Automaticbus transfer (ABT)switches:
(1) Normal source connections.
(2) Alternatesource connections(whenABT is placed in
manua1,
and alternatesource is selected).
(3) Load connections.
(4) Control relay connections.
(5) Controlwire connections.
(6) Relay or contactorcontactsand electroniccomponents.
Ffotorcontrollers:
(1) Nain contactorconnections.
(2) Overloadconnections.
(3) Control
relay and fuse connections.
(4)
Controlwire terminalboard connections.
(5) Controlwire connections.
(6) Overloadheaters and contacts,
resistors,and contactor
relay coniac~s.
Motor generatorsets:
1) Motor and generator line comections.
(2) Slip ring connections.
(3) Starter/regulator/staticexcitercomponents,connectionsand
terminalboard connections,
internalheater wiring, field
and brush pigtail (if applicable)connections.
Static converters:
(1) Semiconductorheat transferdevices (heatsinks).
(2) Line and load connections.
(3) Control relay and controlwire connections.
(4) Electroniccomponents,
bus connections,transformers,
terminalboards.
5.4.5 Equipment not available for survey.
If an electrical system is
not surveyed because it is not operational, the reason for the non-operating
condition shall be written on sheet 2 of the IRTI survey data sheet as shown
on figure 2.
5.5 Infrared thermal imaging EEGL survey report. The IRTI electrical
survey report shall be as specified
in 5.5.1 and 5.5.2.
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
11/26
MIL-STD-2194(SH)
12 February 1988
5.5.1 Preliminaryreport.
At the conclusionof the infraredthermal
imagingsurvey,
a
report,
as shown on figures 3 through 8, shall be provided to
the ships commandingofficer,
engineeringofficer and electricalofficer.
The
reportshall contain one completeset
of photographsand thermograms.
(Another
set of photographsand thermogramsshall be retainedby the surveyingactivity
for future reference.) The preliminaryreport shall contain the following
information:
(a)
(b)
(c)
(d)
(e)
(f)
Cover page (seefigure3).
Abstract (see figure4).
Summary of problemsand repair priorities (see figure 5).
Equipment guide list marked to indicateall electrical
equipmentsurveyed (see figure 6).
List of electricalequipmentnot availablefor survey
(see figure 7).
Descriptionof individualequipmentproblems
(see figure 8).
5.5.2 Final report. A final report,
as
shown on figures9 through 13,
shall be providedto NAVSEA,
the appropriatetype Command, the appropriate
Planningand Engineering
ior Repairs and Alterations,and the ship which was
surveyed.
This report s~lallcontainthe followinginformation:
(a) Cover page (see figure 9).
(h) Abstract (see figure 10).
(c) Summary of problemsand repair priorities (see figure 11).
(d) List of electricalequipmentnot availablefor survey
(see figure 12) and status.
(e) Summary matrix of electricalequipmentproblems
(see figure 13).
6. NOTES
6.1
Subject term (keyword) listing.
Background
Equipment,electronic
Gray scale
Hot spot
Thermograph
Preparingactivity:
Navy - SH
(Project5855-N282)
7
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
12/26
MIL-STD-2194(SH)
12 February 1988
Inspectiondate:
Ship class/name:
Inspectorname:
Activity:
Problem no.:
Thermographno.:
Equipmentunder survey:
Specificcomponentexperiencing
high temperature:
Temperatureabove ambient:
IRTI test equipmentnomenclatureand settings:
Prc)bablecause:
~~ ~~mmcn~:l~ions
Remarks:
~. .
FTGURE
1.
IRTI survey
data sheet:
descriptionof individualequipmentproblems.
8
.
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
13/26
MIL-STD-2194(SH)
12 February 1968
I
Equipment
nomenclature
2*
I
3.
I
5.
6.
Inspectiondate:
Ship class/name:
Inspectorname:
Activity:
Equipment
location
I
Reason for non-availability
FIGURE 2.
IRTI survey
data sheet: list of electricalequipmentnot
availablefor survey.
-
9
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
14/26
}IIL-STD-2194(SH)
12 February 1?58
Start date:
IRTI SURVEY -
PRELIMINARYREPORT
Ship name and hull no.
Completiondate:
Performedby:
FIGURE 3.
IRT1 survey-p
reliminaryreport.
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
15/26
}lIL-STD-2194(S}I)
12 February 19S6
The purpose of the infrared
thermal imaging (IRTI) electricalsurvey is
For each hot
to scan electricalequipment in order to find hot or cold spots:
or cold spot,
the probable cause
and recommendedcorrectiveactions are determined
by the survey team and provided
to the ships electricalofficer in this report.
1.
Survey dates
2.
Name and hull no. of ship
3.
Ship location
4.
Activity conductingsurvey
5.
TuL~l I iJ n tI eY
of electricalproblems fo~nd
6.
Number of problems correctedduring survey
7.
Number of remailingproblems
FIGURE A. Abstract.
11
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
16/26
MIL-STD-2194(Sli)
12 Fcbruar)-1988
Inspectiondate:
Ship class/name:
Inspectorname:
Activity:
Component
experienciilg
Repair priority (check one)
Problem
Equipment
Equipment
high
(see note below)
nomenclature
location
temperature
Immed. }land.
Import. Desir.
number
.
_ ---
NOTE:
Repair priority
is based on the temperature difference between the
electrical component and the equipment to which it is attached as
follows:
Immed:
Immediate -
component is 70C or
more
above ambient,
Mand:
Nandatory -
component is 40 to 69C above ambient.
Import:
Important -
component is 25 to 39C above ambient.
Desir: Desirable - component
is 10 to 24C above ambient.
Summary sheet
of
FIGLIRE5.
Summary of
problems and repair
priorities.
.
12
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
17/26
NIL-STD-2194(SH)
12 February 1988
NOTE :
The equipmentguide list should be marked up to indicateall
electricalequipmentsurveyed.
j
FIGURE 6. Electricalequipmentguide list.
13
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
18/26
NIL-STD-2194(SH)
12 February 19SS
Equipment Equipment
No. nomenclature
location Reason for non-availability
1.
9
-.
3.
4.
5.
,
6.
7.
6.
9.
}
I
I
[
I
.
FIGURE 7. List of electrical equipment not available for sllrve~.
.
.
.
.
.
.
-
____ ~ ~
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
19/26
I
MIL-STD-2194(SH)
12 February 1988
Inspection date:
Ship class/name:
Inspector name:
Activity:
Problem no.:
Thermogram no.:
Equipment nomenclature:
Equipment location:
Specific component experiencing
high temperature:
Equipment temperatureabove normal
operatingtemperature:
IRTI test equipmentsettings:
Probable cause:
Recommendations:
Remarks:
FIGURE 8.
Description of individual equipment problems.
i
I
15
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
20/26
Start date:
MIL-STD-2194(SH)
12 February 1988
.
IRTI SURVEY
- FINAL REPORT
Ship name and hull no.
Completion date:
Performed by:
FIGURE 9.
IRTI survey
-final report.
16
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
21/26
ML-STD-2194(SH)
12 February 1988
\
The purpose of the infraredthermal
imaging (IRTI)electricalsurvey is
to scan electricalequipmentin order to find hot or cold spots.
For each hot
or cold spot,
the probable cause and recommendedcorrectiveactions are determined
by the survey team and provided to
the appropriateNaval activity in this report.
1.
2.
3.
4.
5.
6.
7.
Surveydates
Name and hull no. of ship
Ship location
Activityconducting
survey
Total number of electrical problems
Number of probl( n~~corrected ~luring~~rveY
....
Number of remaining problems
FIGURE 10. Abstract.
17
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
22/26
NIL-STD-2194(SH)
12 Feb]-udr}19S8
Prob1em Equipment
number nomenclature
I
Equipment
location
I
..
___
Component
experiencing
high
temperature
Repair priority (check one)
(see note below)
Immed.
Mand. Import.
Desir.
NOTE:
Repair priority is based or~
the temperature difference between the
electrical component
and the equipment to which it is attached as
follows:
Xmmed: Immediate -
component is 70C or more above ambient.
~falld
Mandatory - component is 40 to 69C above ambient.
Import:
Important - component is 25
to 39C above ambient.
Desir:
Desirable -
component is
10 to 24C above ambient.
Summary sheet of
1IGURE11.
Summary of
problems and repair priorities .
...
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
23/26
NIL-STD-2194(SH)
12 February 1988
I
Equipment
Equipment
No.
nomenclature
location
Reason for non-availability
1.
2.
3
4.
5.
6.
7.
8.
9.
10.
, {
11.
19
-.
.
13.
14.
15.
16.
17.
18.
19.
20.
A
FIGURE 12. List of electrical equipment not available for survey.
.
.. .
.
.. ..-
.
19
...
.
..
..- .*-.--=. ..
..*
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
24/26
MIL-STD-2194(SH)
12 February 19SS
.
Electrical equipment
Results of this survey b wiority code
Qty
I
Qty
Type
abroad
surveyed
ship
Generators
(60 hertz (Hz))
Switchboards
(60 Hz)
Load centers
Automatic/manual
u
transfer switches
Motor controllers
Power panels
(fuses/breakers)
400 Hz systems
I.C. systems
Motors
Miscellaneous & shore
power
I
Immed.
land.
Import.
1---
Totals
Desir.
Total
FIGURE 13.
Summary matrix of electrical equipment problems.
..
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
25/26
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
_
.
00CUHNT NUM8CR
z ~N7 ~w~c INFRARED THERMAL IMAGIN
G SURVEY~R
MIL-STD-2194(SH)
ELECTRICALEQUIPMENT
w NAM OF USM1~iNG ~MNWATION
.
AOOR@@@-t. CMY 8 . =?
C-)
i.
ROBLEM AREAS
a ~uawa Nwnbu ond Wordh,:
b.
c.
L TVP@ OF O~UAMWATWN /- -)
c1
VCNDOR
n
ue n
c1
MANUFACTURE*
n
omm mF9CUYh .,
.
I
__JID___
. 1426. .
PR
OW ~DtTtON 89~LS7Ec
.=2 rn~m ----- _- -.. _ ..- .__-.___=_=_ ____=~=-_~_~=~__+______ ___
--_==_.._ --_=_ _____ . ____ _
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.
-
8/11/2019 MIL-STD-2194
26/26
IMSTWCT)ON : In continuing .ffort to make our
h~tion
documents
better,heDollprovideshkformforw
in
submitting
omrn nti and auggutbns for
irnprovwnenta.
All uem of military standardization documen~ are invited to provide
~tiorm W form rmy ho detached, folded along tbe lines indicated, taped along the kmae edge M NOT STAPLE and
rmded.In
block 6, be m specific as poadble
bout ~im~ mb~m mu such as
Wordingwhich
equired
interpretation, was
~oo rigid, rntrictiw, bee, ambiius, or WMincompatible, and give Propooed wording changes which would alleviate the
pcobleum Ma in bAock6 any remarks not related to spacifw paragraphf t h e document. If block 7 is filled out, an
~knowledgement will be mailed to you within SO days to let youknow that your
omments were
rooei~ed and am being
dmd.
NOTE: l ii form may not be wed to requed copie8 of documents, nor * request Waivers, deviation, or
clarification
f
specifi=tionequirementsn currentontract9,
omments
submitted on this
form do not constitute or imply wthorization
to
mive any potion of the referem
documat s) ortoamendcontractual requirements.
ol d dau thisine
Fold aiow
t s
line)
DEPARTMENT OF THE NAVY
COMMANDER
NAVAL SEA SYSTEMS COMMAND SEA
55Z 3
DEPARTMENT OF THE
NAVY
WASHINGTON, DC 20362-5101
111111
OFFICOALUWNES
ENALTY FOR PRIVATE USE S300
I BUSINESS REPLYMAIL I
FIRST CLASS
PERMIT NO. 12503
WASHINGTON D C
POSTAGE WILi 6E PAID BY THE DEPARTMENT OF THE NAVY
COMMANDER
NAVAL SEA SYSTEMS COMMAND
SEA 5523)
DEPARTMENT OF THE NAVY
WASHINGTON , DC 20362-5101
II
O ?OSTAGE
N6CEqRY
IF MAILED
IN
THE
UNITED STATES
Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.