    NIL-STD-2194(SH)

    12 February 1988

    MILITARY STANDARD.

    INFRAREDTHERMAL IMAGING SURVEY PROCEDURE

    FOR

    ELECTRICALEQUIPMENT

    AMSC N/A

    FSC 5855

    DISTRIBUTIONSTATEMENTA Approved for public release;distributionunlimited

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    2/26

    MIL-STD-2194(S11)

    12 February 1988

    DEPARTMENTOF DEFENSE

    NAVAL SEA SYSTEMS COMMAND

    Washington,

    DC 20362-5101

    InfraredThermal ImagingSurvey Procedurefor ElectricalEquipment

    1.

    This Military Standardis approvedfor use by the Naval Sea SystemsCommandj

    Departmentof the Navy, and is available for use by all Departmentsand Agencies

    of the Departmentof Defense.

    2.

    Beneficialcomments (recommendations,additions,deletions)and any per-

    tinentdata which may be of use in improvingthis document should be addressed

    to:

    Commander,Naval Sea Systems Command,

    SEA 5523, Departmentof the Navy,

    Washington,DC 20362-5101by using the self-addressedStandardizationDocument

    ImprovementProposal (DD Form 1426) appearingat the end of this documentor by

    letter.

    ii

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    3/26

    NIL-STD-2194(SH)

    12 February 19S8

    COhqENTS

    Page

    Paragraph 1.

    1.1

    2.

    2.1

    2*2

    3.

    3.1

    3.2

    3.3

    3.4

    3*5

    3.6

    3.7

    3.8

    3.9

    3.10

    5.

    5.1

    5.2

    5.3

    5.4

    5.4.1

    5.4.1.1

    5.4,1.2

    5.4.1.3

    5.4.1.4

    5.4.2

    5.4.3

    5.4.4

    5.4.5

    5.5

    5.5.1

    5.5.2

    SCOPE ................OOOOOOWO.CO**O.O--*O

    Scope ..........o...OO.OOOOooo--o

    REFERENCEDDOCUtlENTS..............................

    Governmentpublication. ..........................

    Order of precedence

    . s . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    DEFINITIONS .......................................

    Electricalequipment .............................

    Electronicequipment .............................

    Phase I survey ...................................

    Phase II survey ..................................

    Normal loading ...................................

    Thermogram ......................................,

    Gray scale .......................................

    Reference temperature.............................

    Hot spot ........~.0.o..c0.00.co..O.o.o..o...o.o

    Cold spot............-................

    GENERAL REQUIMMENTS ..............................

    Phase Iand II survey.. ..........................

    DETAILED REQUIREMNTS .............................

    Electricalequipmentto be surveyedduring

    phase I ............-....o.G..*.*..**.**

    Electricalequipmentto be surveyedduring

    phaseII ..............+**s*o*.**.*

    Electricalequipmentwhich does not have to

    re surveyed .....................................

    Survey procedures ................................

    Preliminary ......................................

    Safety ...................................-

    Ships force assistance ..........................

    Equipment loading ................................

    Sequenceof equipmentto be surveyed ............*

    Test equipmentcalibrationand

    operationalchecks ..............................

    Proceduresfor checkinghot or cold spots on

    electricalequipment ............................

    Potentialhot or cold spot locations.............

    Equipmentnot available for survey ...............

    Infraredthermal imagingEEGL survey

    report ...........OOOOQoOOCOOCOSOOOOOOO****w.

    Preliminaryreport ...............................

    Final report

    ...*..** *.*****.-*......

    1

    1

    1

    1

    1

    1

    1

    1

    1

    1

    2

    2

    2

    2

    2

    ~

    2

    2

    2

    2

    2

    3

    3

    3

    3

    3

    3

    3

    3

    4

    5

    6

    6

    7

    7

    iii

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    4/26

    NIL-STD-2194(SH)

    12 February 1988

    CONTENTS - Continued

    paragraph6.

    6.1

    Figure 1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    9.

    10.

    11.

    12.

    13.

    Table

    I.

    NOTES ...........OOO--0--

    Subjectterm (keyword) listing ..................

    FIGURES

    IRTI survey data sheet: descriptionof

    individualequipmentproblems ....................

    IRTI survey data sheet:

    list of electrical

    equipmentnot available for survey ...............

    IRTI survey-preliminaryreport ....................

    Abstract ..........................................

    Summaryof problems and repairpriorities .........

    Electricalequipmentguide list ...................

    List of electricalequipmentnot available for

    survey ......o.....o..o.o..Q*0******.....

    Descriptionof individualequipmentproblems ......

    IRTIsurvey-final report ..........................

    Abstract ..........................................

    Summaryof problems and repair priorities .........

    List of electricalequipmentnot availablefor

    survey ...........................................

    Summarymatrix of electricalequipmentproblems ...

    TABLE

    Severity code .....................................

    iv

    Page

    7

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    4

    rl

    mnw mnVnll arrrmlnr rnr urmfirrlma

    11 t . . . . i

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    5/26

    MIL-STD-2194(SH)

    12 February 1988

    1.

    SCOPE

    1.1 Scope.

    This standardprovidesdetailedproceduresfor conductingan

    infraredthermal imaging (IRT1)survey on electricalequipmentaboard ship.

    An IRTI survey is recommendedfor new constructionships, pre-overhaultest and

    inspection,post repair and overhaulchecks,and

    ships electricalsystem occur.

    2.

    REFERENCEDDOCUMENT

    2.1 Governmentpublication.

    The following

    whenevermajor changes to the

    Governmentpublicationforms a

    part of this standardto the extent specifiedherein.

    OFFICE OF THE CHIEF OF NAVAL OPERATIONS (OPNAV)

    OPNAVINST 51OO.19A -

    Navy Safety Precautionsfor Forces Afloat.

    (Copiesof the Governmentpublicationrequiredby contractorsin connection

    with specificacquisitionfunctionsshould be obtained from the contracting

    activityor as directed by the contractingofficer.)

    2.2 Order of precedence.

    In the event of a conflictbetween the text of

    . .

    this standardand the referencescited herein,

    the text of this standardshall

    take precedence.

    3.

    DEFINITIONS

    3.1 Electricalequipment. Electricalequipment is equipment,other than

    electronic,which is designedto generate,convert,distribute,control,or

    utilize electricalenergy.

    Examplesof electricalequipmentare generators,

    switchboards,power panels,motor controllers,motor generators,and bus

    transferswitches.

    3.2 Electronicequipment. Electronicequipment is equipmentdesignedto

    generate,transmit.,convey,store, process,or otherwiseuse electronic

    signals. Examples of electronicequipmentare oscillators,transmitters

    (sonar,radar,

    and radio),amplifiers,sensing devices, receivers,computers,

    underwaterdetection equipment,fire control equipment,drone control,and

    associatedtest equipment.

    3.3 Phase I survey.

    The phase X survey is that part of the IRT1 survey,

    specifiedherein,

    that is conductedat dockside for the purpose of keeping the

    phase 11 survey (underway)time to a minimum.

    The phase I survey temperature

    measurementsare performedon all electricalequipmentwhich can be operated

    docksideunder normal operatingconditions.

    3.4

    Phase II survey. The phase 11 survey is that part of the IRTI

    survey, specifiedherein, that is conductedwhile the ship is underway. The

    phase II survey temperaturemeasurementsare performed on all electrical

    equipmentwhich can only be operated at sea under normal operating conditions,

    and the balance of the electricalequipmentnot availableduring the phase I

    survey.

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    6/26

    NIL-STD-2194[SH)

    12 February 19S8

    3.5 Normal loading.

    Normal loading is the levelof currentwhich would

    be drawn by equipment,or through conductors,

    under normal operatingconditions.

    3.6 Thermogram. A thermogramis an instanthard copy photographof

    the infraredimage.

    3.7 Gray scale.

    The gray scale is a referencescale on the monitor

    containingbars of differentshades from dark to light.

    3.8 Referencetemperature.

    Referencetemperatureis the enclosure

    temperatureof a piece of electricalequipmentor componentoperatingunder

    normal loadingconditions.

    3.9 Hot spot. A hot spot is any area of the equipmentwhich is surveyed

    10 degrees Celsius (C)or more above the equipmentreferencetemperature.

    3.10 Cold spot.

    A cold spot is any area of the equipmentwhere the

    surveyed temperatureis

    less than the referencetemperatureand where there is an

    indicationof an open connectionor componentor

    some other similar type problem.

    4.

    GENERAI,REQUIREMENTS

    4.1 Phase I and II survey.

    The phase I and II surveys shall consistof

    the following:

    [a]

    (b)

    (c)

    Tne IRTi survey shaii be planned and coorciina~edi~ilall

    participatingpersonnelto ensure optimumutilizationof

    docksideand underway time.

    The ElectronicEquipmentGuide

    List (EEGL)(if available)shall be used to identifyand

    locatethe equipmentto be surveyed. At the conclusionof

    the IRTI survey, a report shall be prepareddetailingthe

    survey results (see 5.5).

    Measuringthe temperatureof the EEGL equipmentwhile in normal

    operatingmode.

    Determiningcause for hot or cold spots on EEGL equipmentor

    identifyingpotentialproblem areas for futureanalysesas

    appropriate.

    5. DETAILEDREQUIREMENTS

    5.1 Electricalequipmentto be surveyedduring P

    base 1.

    Duringphase I

    (dockside),

    as much of the electricalequipmentas possibleshall be surveyed

    to reduce the phase 11 (underway)workload.

    Equipmentto be surveyedduring

    phase I includesshore power switchboards,shore power connections,shore

    power receptacles,cables,

    and motor controllers(exceptas specifiedin 5.3).

    5.2 Electricalequipmentto be surveyedduringp

    base II.

    During phase

    XI survey, any equipment (exceptas specified in 5.3) which is on the EEGL and

    could not be operatedwhile dockside, shall be surveyed.

    This equipmentshall

    include the following-:

    I

    I

    I

    I

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    7/26

    NIL-STD-2194(SN)

    12 February 1988

    (~)

    (b)

    (c)

    Electricalequipmentassociatedwith the anchorwindlassmotor,

    whale boat, catapult,and underwayreplenishmentsystem.

    Power panels,

    transformers,and load centersprovidingpower

    service to electronicequipmentand motors.

    Steeringgear motors, direct current (de)propulsionmotors and

    bow thrusters.

    5.3 Electricalequipmentwhich does not have to be surveyed. Electrical

    equipmentwhich does not have to be surveyed includesportableelectrical

    equipment,office equipment,hand dryers,

    shop equipment(drillpresses,

    millingmachines, lathes, inductionfurnaces,

    and so forth),ventilationduct

    heating elements,and other types of electricalheating elements.

    5.4 Survev procedures.

    Survey proceduresshall be as specifiedin 5.4.1

    through 5.4.5.

    5.4.1 Preliminary. Procedurespreliminaryto the survey shall be as

    specifiedin 5.4.1.1 through 5.4.1.4.

    5.4.1.1 Safety. Ship electricalsafetyproceduresshall be followedat

    all times. Forces afloat shall be in accordancewith OPNAVINST51OO.19A.

    Unauthorizedpersonnel shall be kept away from equipmentbeing surveyedby the

    use of barricadesand warning signs.

    The IRTI test equipmentoperator shall

    not extend the scanner across the plane of open electricalpanels or coverings.

    5.4.1.2 Ships force assistance.

    The survey team leadershall contact

    the ships electricalofficer and request the assistanceof shipspersonnel

    to gain-accessto all equipmentto be surveyed.

    5.4.1.3 Equipment loading. Electricalequipmentto be surveyedshall be

    under normal loadingconditionsand in service for at least 1/2 hour prior to

    being surveyed.

    5.4.1.4 Sequence of equipmentto be surveyed.

    The shipsEEGL, if

    available,shall be utilized to plan sequenceof testing since equipmentis

    listedby location (compartmentlevel, frame, and athwartshipposition).

    5.4.2 Test equipment calibrationand operationalchecks.

    Only calibrated

    test equipmentwill be used for the survey.

    IRTI test equipmentshall be adjusted

    each time equipmentis energized. Initiallyand when the IRTI test equipment is

    operatedcontinuouslyfor long periods of time,

    a gray scale check shall be made.

    Proceduresfor the gray scale check shall be as follows:

    (a) Turn the IRTI test equipmenton.

    (b) Set the system to gray scale and adjust brightnessand

    contrast for optimal viewing.

    (c) Switch back to normal operation;do not adjustbrightness

    or contrastwhile in normal operationalmode.

    3

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    8/26

    NIL-STD-2194(SH)

    12 February 1988

    5.4.3 Proceduresfor checkinghot or cold spots on electricalequipment.

    Proceduresfor checkingfor hot or cold spots on electricalequipmentshall be

    as follows:

    (a)

    (b)

    (c)

    Scan electricalequipmentbeing surveyedwhile observingthe

    monitor for hot or cold spots using the ships EEGL (if available).

    Note -

    Most problemsare due to loose electricalconnectionssuch

    as fuse connections,switch connections,breaker connections,and

    terminal lugs, corrosion,and improperscrew or lug materialor

    size. Anothercommon problem is the breakdownof wire insulation

    and open componentsor connections.

    When a potentialhot or cold spot is found, the IRTI test equipment

    operatorshall determinethe temperaturedifferencebetween the

    hot spot and backgroundby adjustingthe necessary IRTI test

    equipmentcontrols (referto specific IRTI system operating

    manual).

    If the EEGL equipmentis found to have a hot or cold spot, the

    followingprocedureshall be completed:

    (1)

    (2)

    (3)

    (4)

    (5)

    (6)

    (7)

    TWCIthcrrxtogramshall be taken showingthe faulty

    componentwith isotherm level shown.

    Two color,

    instant.photographsshall be taken showing

    the faultycomponent.

    A severity code shall be assignedto the equipment

    as specified in table 1.

    Data shall be taken listingall necessary IRTI test

    equipmentsettingsto verify the actualtemperature

    differencebetween the hot spot and background.

    Data shall be listed on sheet 1 of the IRTI survey

    data sheet as shown on figure 1.

    An arrow shall be affixedto the thermogramsand

    color photographsto identifythe faultycomponent.

    A numberingsystem shall be devisedby the survey

    team leaderto match the color photographswith the

    appropriatethermogram.

    TABLE I.

    Severitycode.1 3

    v

    Severity

    Temperatureabove or below

    Remarks

    code

    referencetemperature(C)

    **

    70 and above

    Component (electrical)

    failure inuninent.ztop

    survey.

    Inform cognizant

    officers.

    -

    40 and above to less than 70

    Component (electrical)

    failure almost certain

    unless corrected.

    t

    1

    1

    1

    See footnotesat end of table.

    1 -

    1

    w

    [

    -

    I

    I

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    9/26

    MIL-STD-2194(SH)

    12 February 1988

    I

    TABLE I. Severity code.1 s - Continued

    Temperature above or below

    Remarks

    reference temperature (C)

    --

    everity

    code

    **

    *

    *

    +

    25 and above to less than 40

    Above

    10

    and above O to less than 25

    Below O to ambient

    ___-

    Component (electrical)

    failureprobable unless

    corrected.

    Component (electronic)

    failureprobable

    unless

    corrected.

    Component electrical)

    failure unlikely but

    corrective measure

    required at next scheduled

    routine maintenance

    period or as scheduling

    permits.

    Component has probably

    failed or degraded or been

    affected by an upstream

    component or equipment.

    1

    2

    Applies to electrical, electronic, or

    I.C.

    equipment.

    Some components such as coils,

    resistors and the-l overload heaters may

    have high temperature readings which are no-l.

    The above general criteria have

    been determined by past field experience

    for maintenance scheduling. Final decision as to priorities and order of

    maintenance shall be determined by the temperature above or below the reference

    temperature,

    the type of component

    and the critical nature of the equipment

    or system involved.

    5.4.4 Potential hot or cold spot locations. When scanning the following

    equipment>the accessible components

    listed shall be specificallyobserved for

    temperaturedifferencesabove

    or below their normal operating temperatures.

    a) Switchboards:

    1) Bus bar connections.

    (2)

    Bus disconnect connection.

    (3) Circuit breaker connections.

    (4) Control wire terminalboard connections.

    (5) Relay connections.

    (6) Fuse holder connections.

    .

    .

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    10/26

    ML-STD-2194(SH)

    12 February 1988

    I

    (b)

    (c)

    (d)

    (e)

    (f)

    Power lightingpanels and fuse distributionpanels:

    (1) Line connections.

    (2) Individualload connections.

    (3) AQB circuit breaker contactsvia molded case signature,

    fuse and fuse clip connectors.

    Automaticbus transfer (ABT)switches:

    (1) Normal source connections.

    (2) Alternatesource connections(whenABT is placed in

    manua1,

    and alternatesource is selected).

    (3) Load connections.

    (4) Control relay connections.

    (5) Controlwire connections.

    (6) Relay or contactorcontactsand electroniccomponents.

    Ffotorcontrollers:

    (1) Nain contactorconnections.

    (2) Overloadconnections.

    (3) Control

    relay and fuse connections.

    (4)

    Controlwire terminalboard connections.

    (5) Controlwire connections.

    (6) Overloadheaters and contacts,

    resistors,and contactor

    relay coniac~s.

    Motor generatorsets:

    1) Motor and generator line comections.

    (2) Slip ring connections.

    (3) Starter/regulator/staticexcitercomponents,connectionsand

    terminalboard connections,

    internalheater wiring, field

    and brush pigtail (if applicable)connections.

    Static converters:

    (1) Semiconductorheat transferdevices (heatsinks).

    (2) Line and load connections.

    (3) Control relay and controlwire connections.

    (4) Electroniccomponents,

    bus connections,transformers,

    terminalboards.

    5.4.5 Equipment not available for survey.

    If an electrical system is

    not surveyed because it is not operational, the reason for the non-operating

    condition shall be written on sheet 2 of the IRTI survey data sheet as shown

    on figure 2.

    5.5 Infrared thermal imaging EEGL survey report. The IRTI electrical

    survey report shall be as specified

    in 5.5.1 and 5.5.2.

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    11/26

    MIL-STD-2194(SH)

    12 February 1988

    5.5.1 Preliminaryreport.

    At the conclusionof the infraredthermal

    imagingsurvey,

    a

    report,

    as shown on figures 3 through 8, shall be provided to

    the ships commandingofficer,

    engineeringofficer and electricalofficer.

    The

    reportshall contain one completeset

    of photographsand thermograms.

    (Another

    set of photographsand thermogramsshall be retainedby the surveyingactivity

    for future reference.) The preliminaryreport shall contain the following

    information:

    (a)

    (b)

    (c)

    (d)

    (e)

    (f)

    Cover page (seefigure3).

    Abstract (see figure4).

    Summary of problemsand repair priorities (see figure 5).

    Equipment guide list marked to indicateall electrical

    equipmentsurveyed (see figure 6).

    List of electricalequipmentnot availablefor survey

    (see figure 7).

    Descriptionof individualequipmentproblems

    (see figure 8).

    5.5.2 Final report. A final report,

    as

    shown on figures9 through 13,

    shall be providedto NAVSEA,

    the appropriatetype Command, the appropriate

    Planningand Engineering

    ior Repairs and Alterations,and the ship which was

    surveyed.

    This report s~lallcontainthe followinginformation:

    (a) Cover page (see figure 9).

    (h) Abstract (see figure 10).

    (c) Summary of problemsand repair priorities (see figure 11).

    (d) List of electricalequipmentnot availablefor survey

    (see figure 12) and status.

    (e) Summary matrix of electricalequipmentproblems

    (see figure 13).

    6. NOTES

    6.1

    Subject term (keyword) listing.

    Background

    Equipment,electronic

    Gray scale

    Hot spot

    Thermograph

    Preparingactivity:

    Navy - SH

    (Project5855-N282)

    7

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    12/26

    MIL-STD-2194(SH)

    12 February 1988

    Inspectiondate:

    Ship class/name:

    Inspectorname:

    Activity:

    Problem no.:

    Thermographno.:

    Equipmentunder survey:

    Specificcomponentexperiencing

    high temperature:

    Temperatureabove ambient:

    IRTI test equipmentnomenclatureand settings:

    Prc)bablecause:

    ~~ ~~mmcn~:l~ions

    Remarks:

    ~. .

    FTGURE

    1.

    IRTI survey

    data sheet:

    descriptionof individualequipmentproblems.

    8

    .

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    13/26

    MIL-STD-2194(SH)

    12 February 1968

    I

    Equipment

    nomenclature

    2*

    I

    3.

    I

    5.

    6.

    Inspectiondate:

    Ship class/name:

    Inspectorname:

    Activity:

    Equipment

    location

    I

    Reason for non-availability

    FIGURE 2.

    IRTI survey

    data sheet: list of electricalequipmentnot

    availablefor survey.

    -

    9

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    14/26

    }IIL-STD-2194(SH)

    12 February 1?58

    Start date:

    IRTI SURVEY -

    PRELIMINARYREPORT

    Ship name and hull no.

    Completiondate:

    Performedby:

    FIGURE 3.

    IRT1 survey-p

    reliminaryreport.

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    15/26

    }lIL-STD-2194(S}I)

    12 February 19S6

    The purpose of the infrared

    thermal imaging (IRTI) electricalsurvey is

    For each hot

    to scan electricalequipment in order to find hot or cold spots:

    or cold spot,

    the probable cause

    and recommendedcorrectiveactions are determined

    by the survey team and provided

    to the ships electricalofficer in this report.

    1.

    Survey dates

    2.

    Name and hull no. of ship

    3.

    Ship location

    4.

    Activity conductingsurvey

    5.

    TuL~l I iJ n tI eY

    of electricalproblems fo~nd

    6.

    Number of problems correctedduring survey

    7.

    Number of remailingproblems

    FIGURE A. Abstract.

    11

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    16/26

    MIL-STD-2194(Sli)

    12 Fcbruar)-1988

    Inspectiondate:

    Ship class/name:

    Inspectorname:

    Activity:

    Component

    experienciilg

    Repair priority (check one)

    Problem

    Equipment

    Equipment

    high

    (see note below)

    nomenclature

    location

    temperature

    Immed. }land.

    Import. Desir.

    number

    .

    _ ---

    NOTE:

    Repair priority

    is based on the temperature difference between the

    electrical component and the equipment to which it is attached as

    follows:

    Immed:

    Immediate -

    component is 70C or

    more

    above ambient,

    Mand:

    Nandatory -

    component is 40 to 69C above ambient.

    Import:

    Important -

    component is 25 to 39C above ambient.

    Desir: Desirable - component

    is 10 to 24C above ambient.

    Summary sheet

    of

    FIGLIRE5.

    Summary of

    problems and repair

    priorities.

    .

    12

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    17/26

    NIL-STD-2194(SH)

    12 February 1988

    NOTE :

    The equipmentguide list should be marked up to indicateall

    electricalequipmentsurveyed.

    j

    FIGURE 6. Electricalequipmentguide list.

    13

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    18/26

    NIL-STD-2194(SH)

    12 February 19SS

    Equipment Equipment

    No. nomenclature

    location Reason for non-availability

    1.

    9

    -.

    3.

    4.

    5.

    ,

    6.

    7.

    6.

    9.

    }

    I

    I

    [

    I

    .

    FIGURE 7. List of electrical equipment not available for sllrve~.

    .

    .

    .

    .

    .

    .

    -

    ____ ~ ~

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    19/26

    I

    MIL-STD-2194(SH)

    12 February 1988

    Inspection date:

    Ship class/name:

    Inspector name:

    Activity:

    Problem no.:

    Thermogram no.:

    Equipment nomenclature:

    Equipment location:

    Specific component experiencing

    high temperature:

    Equipment temperatureabove normal

    operatingtemperature:

    IRTI test equipmentsettings:

    Probable cause:

    Recommendations:

    Remarks:

    FIGURE 8.

    Description of individual equipment problems.

    i

    I

    15

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    20/26

    Start date:

    MIL-STD-2194(SH)

    12 February 1988

    .

    IRTI SURVEY

    - FINAL REPORT

    Ship name and hull no.

    Completion date:

    Performed by:

    FIGURE 9.

    IRTI survey

    -final report.

    16

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    21/26

    ML-STD-2194(SH)

    12 February 1988

    \

    The purpose of the infraredthermal

    imaging (IRTI)electricalsurvey is

    to scan electricalequipmentin order to find hot or cold spots.

    For each hot

    or cold spot,

    the probable cause and recommendedcorrectiveactions are determined

    by the survey team and provided to

    the appropriateNaval activity in this report.

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    Surveydates

    Name and hull no. of ship

    Ship location

    Activityconducting

    survey

    Total number of electrical problems

    Number of probl( n~~corrected ~luring~~rveY

    ....

    Number of remaining problems

    FIGURE 10. Abstract.

    17

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    22/26

    NIL-STD-2194(SH)

    12 Feb]-udr}19S8

    Prob1em Equipment

    number nomenclature

    I

    Equipment

    location

    I

    ..

    ___

    Component

    experiencing

    high

    temperature

    Repair priority (check one)

    (see note below)

    Immed.

    Mand. Import.

    Desir.

    NOTE:

    Repair priority is based or~

    the temperature difference between the

    electrical component

    and the equipment to which it is attached as

    follows:

    Xmmed: Immediate -

    component is 70C or more above ambient.

    ~falld

    Mandatory - component is 40 to 69C above ambient.

    Import:

    Important - component is 25

    to 39C above ambient.

    Desir:

    Desirable -

    component is

    10 to 24C above ambient.

    Summary sheet of

    1IGURE11.

    Summary of

    problems and repair priorities .

    ...

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    23/26

    NIL-STD-2194(SH)

    12 February 1988

    I

    Equipment

    Equipment

    No.

    nomenclature

    location

    Reason for non-availability

    1.

    2.

    3

    4.

    5.

    6.

    7.

    8.

    9.

    10.

    , {

    11.

    19

    -.

    .

    13.

    14.

    15.

    16.

    17.

    18.

    19.

    20.

    A

    FIGURE 12. List of electrical equipment not available for survey.

    .

    .. .

    .

    .. ..-

    .

    19

    ...

    .

    ..

    ..- .*-.--=. ..

    ..*

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    24/26

    MIL-STD-2194(SH)

    12 February 19SS

    .

    Electrical equipment

    Results of this survey b wiority code

    Qty

    I

    Qty

    Type

    abroad

    surveyed

    ship

    Generators

    (60 hertz (Hz))

    Switchboards

    (60 Hz)

    Load centers

    Automatic/manual

    u

    transfer switches

    Motor controllers

    Power panels

    (fuses/breakers)

    400 Hz systems

    I.C. systems

    Motors

    Miscellaneous & shore

    power

    I

    Immed.

    land.

    Import.

    1---

    Totals

    Desir.

    Total

    FIGURE 13.

    Summary matrix of electrical equipment problems.

    ..

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    25/26

    I

    I

    I

    I

    I

    I

    I

    1

    I

    I

    I

    I

    I

    I

    I

    _

    .

    00CUHNT NUM8CR

    z ~N7 ~w~c INFRARED THERMAL IMAGIN

    G SURVEY~R

    MIL-STD-2194(SH)

    ELECTRICALEQUIPMENT

    w NAM OF USM1~iNG ~MNWATION

    .

    AOOR@@@-t. CMY 8 . =?

    C-)

    i.

    ROBLEM AREAS

    a ~uawa Nwnbu ond Wordh,:

    b.

    c.

    L TVP@ OF O~UAMWATWN /- -)

    c1

    VCNDOR

    n

    ue n

    c1

    MANUFACTURE*

    n

    omm mF9CUYh .,

    .

    I

    __JID___

    . 1426. .

    PR

    OW ~DtTtON 89~LS7Ec

    .=2 rn~m ----- _- -.. _ ..- .__-.___=_=_ ____=~=-_~_~=~__+______ ___

    --_==_.._ --_=_ _____ . ____ _

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.

  • 8/11/2019 MIL-STD-2194

    26/26

    IMSTWCT)ON : In continuing .ffort to make our

    h~tion

    documents

    better,heDollprovideshkformforw

    in

    submitting

    omrn nti and auggutbns for

    irnprovwnenta.

    All uem of military standardization documen~ are invited to provide

    ~tiorm W form rmy ho detached, folded along tbe lines indicated, taped along the kmae edge M NOT STAPLE and

    rmded.In

    block 6, be m specific as poadble

    bout ~im~ mb~m mu such as

    Wordingwhich

    equired

    interpretation, was

    ~oo rigid, rntrictiw, bee, ambiius, or WMincompatible, and give Propooed wording changes which would alleviate the

    pcobleum Ma in bAock6 any remarks not related to spacifw paragraphf t h e document. If block 7 is filled out, an

    ~knowledgement will be mailed to you within SO days to let youknow that your

    omments were

    rooei~ed and am being

    dmd.

    NOTE: l ii form may not be wed to requed copie8 of documents, nor * request Waivers, deviation, or

    clarification

    f

    specifi=tionequirementsn currentontract9,

    omments

    submitted on this

    form do not constitute or imply wthorization

    to

    mive any potion of the referem

    documat s) ortoamendcontractual requirements.

    ol d dau thisine

    Fold aiow

    t s

    line)

    DEPARTMENT OF THE NAVY

    COMMANDER

    NAVAL SEA SYSTEMS COMMAND SEA

    55Z 3

    DEPARTMENT OF THE

    NAVY

    WASHINGTON, DC 20362-5101

    111111

    OFFICOALUWNES

    ENALTY FOR PRIVATE USE S300

    I BUSINESS REPLYMAIL I

    FIRST CLASS

    PERMIT NO. 12503

    WASHINGTON D C

    POSTAGE WILi 6E PAID BY THE DEPARTMENT OF THE NAVY

    COMMANDER

    NAVAL SEA SYSTEMS COMMAND

    SEA 5523)

    DEPARTMENT OF THE NAVY

    WASHINGTON , DC 20362-5101

    II

    O ?OSTAGE

    N6CEqRY

    IF MAILED

    IN

    THE

    UNITED STATES

    Downloaded from http://www.everyspec.com on 2011-12-01T17:07:39.