Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal...

19
Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit

Transcript of Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal...

Page 1: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

Mid-Florida Materials (MFM)(Division of Hubbard Construction)

C&D Debris Disposal Facility

Renewal of C&D Permit

Page 2: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

Presentation Overview

• Business of Hubbard Construction and MFM• History of MFM C&D Disposal Facility• Location• Requested Permit Renewal• Existing Wekiva Study Area Protections

Page 3: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

Business of Hubbard Construction and Mid-Florida Materials

• Hubbard started as a Central Florida business in 1920.

• Main business is roadway construction.

• Employs 470 people.

• MFM is a division of Hubbard.

• Main business of MFM is borrow pits, C&D debris disposal, and recycling.

• MFM accepts C&D debris: steel*, glass, brick, concrete*, asphalt material, pipe, gypsum wallboard, lumber, yard trash*, rocks, soil, land clearing debris (trees)*, clean cardboard*, paper, plastic, wood, and metal scraps*.

* Materials that are recycled.

Page 4: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

History of MFM C&D Disposal Facility

• 1960 – Borrow pit began

• 1984 – Started filling in borrow pit with C&D Debris

• Orange County Excavation/Fill Permit 1991 - 2012

• 220 Acres – C&D Facility approved in 2000; permit renewal 2007

• For 29 years, has been compatible with surrounding land uses (borrow pits/landfills/agricultural) and neighbors

• Approved permits from FDEP and Orange County

• Excellent compliance record – no odor or groundwater quality issues

• Recycles 30% of debris: wood, yard trash, concrete, and metals

• Estimated 81 years of life at 2012 intake rates

Page 5: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

MFM C&D Disposal FacilityLocation3602 Golden Gem Rd.Zellwood, FL

MFM C&D

Page 6: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

Facility Location

Page 7: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

MFM C&D Facility Site Plan

Page 8: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

MFM C&D Disposal Facility

Working Face Borrow Pit

Concrete Recycling Yard Trash Recycling

Page 9: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

MFM C&D Disposal Facility Requested Permit Renewal

• All permit renewal requirements of the Orange County Code (Chapter 32, Article V) have been met by the Applicant.

1. Application submitted 90 days prior to expiration date (December 3, 2012) – submitted application on May 19, 2011 [Section 32-214(10(g)].

2. Renewal groundwater sampling event completed 6 months prior to renewal.

3. Re-evaluation of base grade elevations vs. water table levels completed.

Page 10: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

MFM C&D Disposal Facility Requested Permit Renewal

• Permit renewals are considered a formality, i.e. a Public Hearing is not required, nor DRC or BZA review, unless the EPD Manager determines that there has been a substantial deviation from the terms and conditions of the permit. The EDP Manager has determined no substantial deviation. [Section 32-214(n)].

• Wekiva Study Area provisions [Section 32-216(c)] do not apply to this legally existing C&D disposal facility prior to the effective date of May 1, 2009 [Section 32-223].

• There is no record, or history, of violations or non-compliance to Orange County Code Chapter 32 [Section 32-217(d)(5)].

• We accept Orange County EPD’s recommendation for permit renewal approval.

Page 11: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

Existing Wekiva Study Area Protections

• Low Recharge Area – Site specific geologic studies found 70 to 100 feet of clayey sediments under the site to protect the Floridan Aquifer.

• Natural site geology attenuates leakage through the waste as shown by 15 years of clean Groundwater Quality Tests.

• Groundwater monitoring wells are tested every 6 months.

• C&D wastes are not a nutrient concern.

• Stormwater Management System of ponds exceeds Wekiva Pollution Abatement standards.

• Soil Cover over the C&D reduces infiltration.

• Ongoing Operational Best Management Practices.

• Site will be a 220 acre open space or park at closure.

Page 12: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

C&D Debris vs. Wekiva River Pollution Sources

C&D Debris

Recycled Materials

Steel

Concrete

Asphalt material

Lumber

Yard trash

Land clearing debris (trees)

Clean cardboard

Other Inert Materials

Glass

Brick

Pipe

Gypsum wallboard

Rocks and soil

Paper

Plastic

Wekiva River Nutrient Pollution Sources

Source: MACTEC’s Final Report Wekiva River Basin Nitrate Sourcing Study for FDEP and SJRWMD, March 2010

MFM C&D Facility is not a pollution source to the Wekiva River

(septic tanks)

Page 13: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

Questions?

Page 14: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

Hydrogeologic Cross Section

On-site Studies Prove Low Recharge

Page 15: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

Landfill Operational Controls

• Noise Control

• Odor Control

• Vibration Control

• Dust Control and Visual Emissions

• Litter Control

• Lighting and Glare

• Waste Screening – Prohibit non-C&D wastes

• Truck Traffic Controls

• Emergency Plans – Fire, Hurricane

• Setbacks and Visual Buffering

Orange County Code Enforcement• Monthly Inspections• Noise• Odor• Dust• Litter• Truck Traffic• Annual Reporting

FDEP Oversight• Quarterly on-Site Inspections• Annual Reporting• Complaint Response• Odor and Groundwater Quality Rules• Quarterly and Semiannual Reports

MFM has an excellent compliance record

Page 16: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

FDEP Definition: Construction & Demolition Debris“Construction and Demolition Debris” means discarded materials generally considered to be not water soluble and non-hazardous in nature, including but not limited to steel, glass, brick concrete, asphalt material, pipe, gypsum wallboard, lumber, land clearing debris, yard trash, and unpainted, non-treated wood scraps, from the construction or destruction of a structure as part of a construction or demolition project or from the renovation of a structure, including such debris from construction of structures at a site remote from the construction or demolition project site.

Page 17: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

MFM C&D

Study Area

Protection Area

Page 18: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

The facility is not located in

the Wekiva Protection

Area

Wekiva Protection

Area

Orange County

46

441

Page 19: Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.

on

Wekiva Study Area

Primary(“more vulnerable”)

Secondary(“vulnerable”)

Tertiary(‘less vulnerable”)

Florida Geological Survey Disclaimer – RI #104:

“Application of the vulnerability map on the order of greater than 0.75 square miles (480 acres) is more appropriate. The WAVA Vulnerability map is no substitute for a site-specific hydrogeologic investigation.”