Microsoft Outlook - Memo Style...1168958.98 1168096.69 1167109.74 383.27 335.91 356.76 343.18 300...
Transcript of Microsoft Outlook - Memo Style...1168958.98 1168096.69 1167109.74 383.27 335.91 356.76 343.18 300...
1
Mathews, Barbara
From: Fureigh, Brad N. <[email protected]>Sent: Thursday, January 15, 2015 4:17 PMTo: McWilliams, Clark; Leamons, Bryan; Mathews, BarbaraCc: Darrin Kempker ([email protected]); [email protected];
Carpenter, OwenSubject: SCLF Cell 5, Phase 2 CQA Report (Permit No. 0261-S1-R2)Attachments: SCLF Cell 5, Phase 2 CQA.pdf
Clark, Please see attached the CQA report for Phase 2 of Cell 5 at the Saline County Landfill. Feel free to contact me at your convenience if you have any questions or comments. Thanks! Brad N. Fureigh, P.E. Senior Project Engineer I Solid Waste Services Terracon 25809 I-30 South I Bryant, Arkansas 72022 P (501) 847 9292 I F (501) 847 9210 D (501) 943-1027 I M (501) 554 4547 [email protected] I terracon.com Join us on Facebook and LinkedIn
Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.
Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access hyperlink, please e-mail sender.
Terracon Consultants, Inc. 25809 I-30 South Bryant, Arkansas 72022
P [501] 847 9292 F [501] 847 9210 terracon.com
January 15, 2015 Solid Waste Division Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, AR 72118-5317
Attention: Mr. Clark McWilliams, P.E. P: 501-682-0510 E: [email protected]
Subject: Cell 5, Phase 2 - QC/QA Documentation Report Saline County Class 1 Landfill, Bauxite, Arkansas Permit: 0261-S1-R2; AFIN: 63-00155 Project No. 35137134 Dear Mr. McWilliams, On behalf of our client, Republic Services, Terracon Consultants, Inc. (Terracon) is submitting this construction quality assurance certification report (CQA) for review and approval. This report consists of bottom liner construction documentation for Phase 2 of Cell 5 at the Saline County Class 1 Landfill (Facility). Background
Terracon submitted a request for a phased construction certification to the ADEQ on May 8, 2014 (Doc. ID 65923). The phased construction included lining Cell 5, excluding the small section of liner tie-in between Cells 3, 4, and 5. The ADEQ approved the phased construction certification approach through email dated May 19, 2014 (see Attachment A). The CQA report for Phase 1 (Doc. ID 66060) was submitted on June 16, 2014 and was approved by ADEQ on July 10, 2014 (ADEQ Doc. ID 66225). Purpose
Following the certification of Cell 5 - Phase 1, the contractor excavated waste from the liner tie-in area and placed it on the eastern slope of Cell 5 – Phase 1 and the northwest slope of Cell 3. Once the tie-in area was deemed safe, American Environmental Group (AEG) installed the composite bottom liner system within the Phase 2 area. This report constitutes the supplemental information required to certify the construction of the remaining bottom liner system of Cell 5 at the Facility. The documentation included as Attachments to this report shall be viewed as a supplement to the original certification document (Doc. ID 66060).
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
If you have any questions regarding this report or require additional information, please feel free to contact me at (501) 847-9292 or [email protected] at your convenience. Sincerely, Terracon Consultants, Inc.
Brad N. Fureigh, P.E. F. Owen Carpenter, P.E., P.G. Senior Project Engineer Engineering Department Manager Enclosure: Figures and Attachments N:\Projects\2013\35137134\Working Files\Supplemental Report\Supplemental CQA Report REV.docx
CELL
5 - P
HASE
2 CQ
ABF
I WAS
TE S
YSTE
MS O
F AR
KANS
AS, L
LC
SITE
LAYO
UT
BAUX
ITE
ARKA
NSAS
12
JSB
JSB
BNF
1" =
400'
01/06
/2014
055-
001-
3513
7134
006
FIGU
RE 1
SALIN
E CO
UNTY
LAND
FILL
N
SCALE IN FEET
400 4000
200
LEGEND:
PROPERTY BOUNDARY
CELL / PHASE BOUNDARY
PERMANENT SITE MONUMENT
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment A Correspondence
1
Fureigh, Brad N.
From: Leamons, Bryan <[email protected]>Sent: Monday, May 19, 2014 9:33 AMTo: McWilliams, Clark; Fureigh, Brad N.Cc: West, TommiSubject: RE: Request for Proposed Construction Certification Phasing - Saline County Landfill,
Cell 5
Brad, Please proceed with your phased approach in accordance with your submittal. This email may serve as approval. Thanks. Bryan Leamons, P.E. Engineer Supervisor ADEQ - Solid Waste Management Division 501-682-0601
From: McWilliams, Clark Sent: Friday, May 16, 2014 7:16 AM To: Fureigh, Brad N. Cc: Leamons, Bryan Subject: RE: Request for Proposed Construction Certification Phasing - Saline County Landfill, Cell 5 Have reviewed, but still working on approval. Glad to see the excavated waste is planned to be "pulled back" on to Cell 3 & 4. Thanks, Clark McWilliams P.E. ADEQ – Solid Waste Management Division 5/16/14
From: Fureigh, Brad N. [mailto:[email protected]] Sent: Thursday, May 15, 2014 2:56 PM To: McWilliams, Clark Subject: RE: Request for Proposed Construction Certification Phasing - Saline County Landfill, Cell 5 Hi Clark, I just wanted to check with you to see if you had a chance to review the proposed construction certification phasing for Saline County Cell 5. Please let me know if you have any questions. Thanks! Brad
From: Fureigh, Brad N. Sent: Thursday, May 08, 2014 3:52 PM To: '[email protected]'; Leamons, Bryan Cc: Darrin Kempker ([email protected]); Carpenter, Owen; [email protected] Subject: Request for Proposed Construction Certification Phasing - Saline County Landfill, Cell 5 Clark,
2
Attached is a request for a phased construction certification for Cell 5 at the Saline County Landfill, as was discussed on Monday, May 5, 2014. If you have any questions or need additional information, please feel free to contact us at any time. Thanks! Brad N. Fureigh, P.E. Project Engineer I Solid Waste Services
Terracon 25809 I-30 South I Bryant, Arkansas 72022 P (501) 847 9292 I F (501) 847 9210 D (501) 943-1027 I M (501) 554 4547 [email protected] I terracon.com Join us on Facebook and LinkedIn
Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability.
Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access hyperlink, please e-mail sender.
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment B As-Built Drawing
CELL
5 - P
HASE
2 CQ
ABF
I WAS
TE S
YSTE
MS O
F AR
KANS
AS, L
LC
AS-B
UILT
BAUX
ITE
ARKA
NSAS
22
JSB
JSB
BNF
1" =
400'
01/06
/2015
055-
001-
3513
7134
007
FIGU
RE 2
SALIN
E CO
UNTY
LAND
FILL
N
LEGEND:
PROTECTIVE COVER
SUGRADE
AS-BUILT SUBGRADE
CONTOURS
PHASE 2 GEOMEMBRANE
SEAM
EXSITING GEOMEMBRANE
SEAM
CELL / PHASE BOUNDARY
DESTRUCTIVE SAMPLE
LOCATION
300.00
SCALE IN FEET
2020
010
301.00
CERTIFICATION:
I HEREBY CERTIFY THIS DRAWING AND THE INFORMATION SHOWN
HEREON WAS TAKEN FROM FIELD MEASUREMENTS, COMPLETED
ON DECEMBER 31, 2014, MADE BY ME OR UNDER MY SUPERVISION,
AND ALL HORIZONTAL AND VERTICAL LOCATIONS ARE TRUE AND
CORRECT TO THE BEST OF MY KNOWLEDGE.
NOTES:
1. DATA SHOWN ARE AS-BUILT MEASURED LOCATIONS.
2. CELL CONTOURS SHOWN AT TOP OF DESIGNED SUBGRADE
FOR PICTORIAL REFERENCE ONLY.
3. HORIZONTAL POSITIONS ARE BASED ON ARKANSAS STATE
PLANE COORDINATE SYSTEM, SOUTH ZONE; VERTICAL DATUM
IS NAVD88. ALL POSITIONS ARE RELATIVE TO THE BELOW SITE
CONTROL MONUMENTS:
PERMANENT SITE MONUMENTSNUMBER NORTHING EASTING ELEVATION
BM - 1BM - 2BM - 3BM - 4
2000668.362001031.801999358.312001897.70
1166508.891168958.981168096.691167109.74
383.27335.91356.76343.18
300
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment C Daily Project Field Records
Daily Project Construction Summary 25809 Interstate 30 SouthBryant, AR 72022
Project No: (501) 847-9292
Date of Report:Client Name:Contractor: Clear X ColdProject Name: X Cloudy CoolLocation: Partly Cloudy WarmProject Mngr. Raining HotTechnician: Windy 29 Low Temp. (°F)Test Location: X Foggy / Misty 39 High Temp. (°F)
Depart Lab: Depart Site: 5:30 PM Moisture/Density Bridge LiftArrive Site: Arrive Lab: 5:45 PM Shelby Tube(s) Subgrade
Dozer(s) Tractor & Pans Client 6 Liner Crew1 Excavator(s) Tractor & Disk 2 Contractor Liner Installer
Backhoe(s) Water Truck 2 CQA Consultant Concrete Crew Haul Truck(s) Sheeps Foot Compactor Design Engineer Pipe Installer Motor Grader(s) Smooth Drum Compactor Surveyor Gas Line Inst.
FIELD TESTING PERFORMED:
3513713412/17/2014Republic Services WEATHER:FretcoBFI Saline County Landfill Cell 5 CQABauxite, ArkansasBrad N. Fureigh, P.E.Tony Bardella/ Chris FincherNo Tests Taken
REPORTING TIMES:
1:15 PM1:30 PM
EQUIPMENT ONSITE: PERSONNEL ONSITE:
SUMMARY OF ACTIVITIES OBSERVED:1:30 P.M. - Arrived on site. Upon arrival, liner crew was completing placement of GCL and Geomembraneon the slope area.2:00 P.M. - Collected trial weld.3:30 P.M - Liner crew began extrusion welding on the East tie-in area in anticipation of forecasted rain.5:30 P.M. - Departed site.
Note: Copies of all completed “Project Field Record Forms” are to be submitted to the Project Manager at the end ofeach day and should be maintained with the Project Records.
Daily Project Construction Summary 25809 Interstate 30 SouthBryant, AR 72022
Project No: (501) 847-9292
Date of Report:Client Name:Contractor: Clear X ColdProject Name: X Cloudy CoolLocation: Partly Cloudy WarmProject Mngr. Raining HotTechnician: Windy 36 Low Temp. (°F)Test Location: X Foggy / Misty 42 High Temp. (°F)
Depart Lab: Depart Site: 4:30 PM Moisture/Density Bridge LiftArrive Site: Arrive Lab: 4:45 PM Shelby Tube(s) Subgrade
Dozer(s) Tractor & Pans Client 5 Liner Crew Excavator(s) Tractor & Disk 2 Contractor Liner Installer Backhoe(s) Water Truck 2 CQA Consultant Concrete Crew Haul Truck(s) Sheeps Foot Compactor Design Engineer Pipe Installer Motor Grader(s) Smooth Drum Compactor Surveyor Gas Line Inst.
FIELD TESTING PERFORMED:
3513713412/18/2014Republic Services WEATHER:FretcoBFI Saline County Landfill Cell 5 CQABauxite, ArkansasBrad N. Fureigh, P.E.Joshua Graham/Tony BardellaNo Tests Taken
REPORTING TIMES:
Liner crew made repairs to damaged areas and followed up by vacuum testing the repaired areas.
8:15 AM8:30 AM
EQUIPMENT ONSITE: PERSONNEL ONSITE:
SUMMARY OF ACTIVITIES OBSERVED:8:15 A.M. - Arrived on site. Liner crew began preparing to extrusion weld panel seams.
9:40 A.M. - Collected trial welds.9:50 A.M. - Liner crew began extrusion welding geomembrane panels.12:00 P.M. - Liner crew began vacuum testing extrusion seams.Obtained and field tested destruct 31. Mailed destruct to lab for conformance testing.
4:30 P.M. - Departed site.
Note: Copies of all completed “Project Field Record Forms” are to be submitted to the Project Manager at the end ofeach day and should be maintained with the Project Records.
Daily Project Construction Summary 25809 Interstate 30 SouthBryant, AR 72022
Project No: (501) 847-9292
Date of Report:Client Name:Contractor: Clear X ColdProject Name: X Cloudy CoolLocation: Partly Cloudy WarmProject Mngr. Raining HotTechnician: Windy 32 Low Temp. (°F)Test Location: Foggy / Misty 44 High Temp. (°F)
Depart Lab: Depart Site: 10:00 A.M. Moisture/Density Bridge LiftArrive Site: Arrive Lab: 10:30 A.M. Shelby Tube(s) Subgrade
Dozer(s) Tractor & Pans Client 5 Liner Crew1 Excavator(s) Tractor & Disk Contractor Liner Installer
Backhoe(s) Water Truck 1 CQA Consultant Concrete Crew Haul Truck(s) Sheeps Foot Compactor Design Engineer Pipe Installer Motor Grader(s) Smooth Drum Compactor Surveyor Gas Line Inst.
Note: Copies of all completed “Project Field Record Forms” are to be submitted to the Project Manager at the end ofeach day and should be maintained with the Project Records.
7:45 A.M.8:00 A.M.
EQUIPMENT ONSITE: PERSONNEL ONSITE:
SUMMARY OF ACTIVITIES OBSERVED:8:00 A.M. - Arrived on site. Liner crew had already began installing geocomposite panels.8:30 A.M. - Contractor began joining geonet layer of geocomposite with zip ties at 1 foot intervals.8:50 A.M. - Contractor began joining geotextile layers together by bonding with a heat gun.10:00 A.M. - Contractor finished installing geocomposite drainage layer. Contractor departed the site.
FIELD TESTING PERFORMED:
3513713412/19/2014Republic Services WEATHER:FretcoBFI Saline County Landfill Cell 5 CQABauxite, ArkansasBrad N. Fureigh, P.E.Joshua GrahamNo Tests Taken
REPORTING TIMES:
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment D Geomembrane Daily Deployment Logs
Geosynthetics Daily Deployment Log
Client Name: Project Number: 25809 Interstate 30 South
Contractor: CQA Monitor: Bryant, Arkansas 72022 Project Name: Reviewed By: (501) 847-9292
Address: Approved By:
Location: Liner Installer:
Panel
Visually
Date Roll Amb. Temp. Weather/ Material Length Width Inspected CQA
Number (ºF) Wind Type (Feet) (Feet) (Y or N) Monitor
12/17/14 102172993 39 Cloudy/No Wind 60T 80 18 Y CF
12/17/14 102172993 39 Cloudy/No Wind 60T 80 19 Y CF
Material Type Legend:
60S - 60-Mil Smooth HDPE Geomembrane DSGC - Double Sided Geocomposite 50 SG - 50-Mil LLDPE Super Gripnet
60T - 60-Mil Textured HDPE Geomembrane SSGC - Single Sided Geocomposite 50 MS - 50-Mil HDPE Microspike
40S - 40-Mil Smooth HDPE Geomembrane 8oz Geo - 8 ounce Geotextile
40T - 40-Mil Textured HDPE Geomembrane 12oz Geo - 12 ounce Geotextile
Republic Services 35137134
Fretco Chris FincherBFI Saline County Cell 5 CQA Brad Fureigh, P.E.
18511 West Sardis Road Owen Carpenter, P.E.
Bauxite, Arkansas AEG
Weather Approximate Panel
Conditions Dimensions
Panel
ID
83
84
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment E Geomembrane Trial Weld Summary & Equipment Calibration Certificate
Geomembrane Trial Weld Summary25809 Interstate 30 South
Client Name: Project Number: Bryant, Arkansas 72022
Contractor: CQA Monitor: Peel Extrusion = Phone 501.847.9292
Project Name: Reviewed By: Shear Extrusion = Fax 501.847.9210
Address: Approved By: Peel Fusion =
Location: Liner Installer: Shear Fusion =
Pass
Sample QC Seamer Weld Wedge Speed Preheat or
ID Initials Initials Type Temp oF ft/hr Setting Fail
P 130 138 170
S
P 110 87 97
S
P 111 108 100
S
tP
Republic Services 35137134 Specification for Trial Welds
Fretco Tony Bardella/Chris F. 78
BFI Saline County Cell 5 CQA Brad Fureigh, P.E. 120
18511 West Sardis Road Owen Carpenter, P.E. 91
Bauxite, Arkansas AEG 120
Date Time
Fusion Weld Extrusion Weld
Ambient Machine Temp Test Values
Temp oF Number
oF lbs/inch
12/17/14 14:00 39 TW52 CF G-32 JD E - - 520 520 Pass188 207 217
12/18/14 9:40 38 TW53 TB G-32 JD E - - 500 525 Pass188 198 203
12/18/14 13:15 42 TW54 TB G-32 JD E - - 530 500 Pass211 180 160
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment F Geomembrane Panel Seaming &
Non-Destructive Test Log Summary
Geomembrane Seaming and Non-Destructive Test Summary
Project Number: 25809 Interstate 30 South
CQA Monitor: Bryant, AR 72022
Reviewed By: Phone: 501.847.9292
Approved By: Fax: 501.847.9210
Liner Installer:
Machine No. ft
Date
Start End +/- Start End
12/17/14 15:30 JD 12/18/14 - - - - - - P JG
12/17/14 15:50 JD 12/18/14 - - - - - - P JG
12/17/14 15:55 JD 12/18/14 - - - - - - P JG
12/17/14 16:50 JD 12/18/14 - - - - - - P JG
12/18/14 9:50 JD 12/18/14 - - - - - - P JG DS-31
12/18/14 11:05 JD 12/18/14 - - - - - - P JG
12/18/14 11:30 JD 12/18/14 - - - - - - P JG
12/18/14 13:00 JD 12/18/14 - - - - - - P JG
12/18/14 14:00 JD 12/18/14 - - - - - - P JG
P888
Note: This Page: ft
Accumulated: ft
312
14,239
60.0 E. EOS to 60ft W. 312.0
P83 to S. EXT 183.0
69.0 E. EOS to P16 252.0
70.0 E. EOS to P16 146.0
18.0 P1 to P84 164.0
P1 to P84 65.0
11.0 E. EXT to 11ft W. 76.0
QA
ID
39.0 P83 to 39ft. SW 39.0
8.0 E. EXT to 8ft. W 47.0
Location
From - To
Accum Length
(ft)
Pressure TimeAir
Test
P/F
Vac
Box
P/F
PRODUCTION SEAM LOCATION AND DISTANCE NON-DESTRUCTIVE TESTING
Destruct
No.Date TimeSeamer
Initials
Seam
Number
Length
(ft)
35137134
Contractor: Fretco Tony Bardella/Joshua Graham
P84 to EXT.
Location: Bauxite, Arkansas AEG
G-32 Carry Over: 13,927
Project Name: BFI Saline County Cell 5 CQA Owen Carpenter, P.E, P.G.
Address 18511 West Sardis Road Brad Fureigh, P.E.
P83 to P84
P83 to EXT
P83 to P1
P83 to P84
P83 to P16
P84 to EXT.
P83 to P1
P84 to EXT.
Client Name: Republic Services
18.0
19.0
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment G Geomembrane Destructive Test Log Summary &
Laboratory Test Result
Geomembrane Destructive Test Log Summary 25809 Interstate 30 South
Project Number: Bryant, AR 72022
CQA Monitor: Peel Extrusion = 78 Phone: 501.847.9292
Reviewed By: Shear Extrusion = 120 Fax: 501.847.9210
Approved By: Peel Fusion = 91
Location: Liner Installer: Shear Fusion = 120
Sample Seam Machine LabID Number Number Pass/Fail
P 137 115 80 139 86
S
Client Name: Republic Services 35137134 Destructive Testing Specifications
Contractor: Fretco Chris Fincher
Project Name: BFI Saline Co. Cell 5 CQA Brad Fureigh, P.E.
Address: 18511 West Sardis Road Owen Carpenter, P.E.
Bauxite, Arkansas AEG
DateSeamer Test Values Field CommentsInitials lbs/inch Pass/Fail
12/18/14 DS-31 P83/P84 G-32 JD Pass Pass241 227 144 246 228
Date: 2014-12-19
Mail To: Bill To:Darrin KempkerRepublic Services, Inc.18511 West Sardis RdBryant , AR , 72011
Republic Services, Inc.
e-mail:[email protected] [email protected] [email protected]
Dear Mr. Kempker,
Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased tosubmit this final report for laboratory testing.
Project: Saline County Landfill Cell 5
TRI Job Reference Number: 15632
Material(s) Tested: (1) Single Extrusion Weld Seam(s)
Test(s) Requested: SAME DAY Peel and Shear(ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.)
Codes:AD Adhesion Failure (100% Peel)BRK Break in sheeting away from Seam edge.SE Break in sheeting at edge of seam.AD-BRK Break in sheeting after some adhesion failure - partial peel.SIP Separation in the plane of the sheet (leaving the bond intact).FTB Film tearing bond (all non "AD" failures).NON-FTB 100% peel.
If you have any questions or require any additional information, please call us at 1-800-880-8378.Sincerely,
Melissa HunterProject ManagerGeosynthetic Services Divisionhttp://www.geosyntheticstestinc.com
Page: 1 of 2
DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS - SINGLE TRACKTRI Client: Republic Services, Inc.
Project: Saline County Landfill Cell 5
Material: 60 mil. HDPESAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.)TRI Log#: 15632
TEST REPLICATE NUMBER
PARAMETER 1 2 3 4 5 MEAN
Sample ID: DS-31 | Weld: Single ExtrusionSide: Peel Peel
Peel Strength (ppi) 121 114 83 120 109 109Peel Incursion (%) 20 <5 <5 <5 <5Peel Locus Of Failure Code AD-BRK SE SE SE SEPeel NSF Failure Code FTB FTB FTB FTB FTB
Shear Shear
Shear Strength (ppi) 204 210 207 206 205 206Shear Elongation @ Break (%) >50 >50 >50 >50 >50
Page: 2 of 2
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment H Geomembrane Repair Log Summary
Client Name: Project Number: Liner System 25809 Interstate 30 South
Contractor: CQA Monitor: Bryant, AR 72022
Project Name: Reviewed By: x Primary Phone 501.847.9292
Address: Approved By: Secondary Fax 501.847.9210
Location: Liner Installer: Other:
REPAIR
DATE SEAM DIST OFFSET TYPE WIDTH DIA QA DATE OPER PASS/ ACTION QA
(ft) (2) (3) (ft) (ft) ID ID FAIL ID
12/17/14 P83,P1,EXT - - P E 2.5 TB 12/18/14 TR Pass - TB
12/18/14 P83-P84 15 P16 D31 E 3.0 TB 12/18/14 TR Pass - TB
12/18/14 P83,P1,EXT 10 P84 P E 2.5 JG 12/18/14 TR Pass - JG
NOTES: (1) Repair No.: Repairs should be numbered sequentially ABBREVIATIONS:
(2) Repair Codes.: P = Patch, C = Cap, S = Anchor Trench Ext., D = Destructive Sample, G = Grind and Weld, T = Topping along Fusion Seam GV = Gas Vent AT = Anchor Trench
(3) Repair Types: E = Extrusion and F = Fusion EXT = Existing PP = Pipe Penetration
- 256 6.0 G-32 JD
- 257 5.0 G-32 JD
(1) (ft) NO ID
- 255 2.5 G-32 JD
NON-DESTRUCTIVE TESTINGNO. AND
PANEL CODE LENGTH MACH OPER
18511 West Sardis Road Owen Carpenter, P.E.
Bauxite, Arkansas AEG
LOCATIONREPAIR
SIZE WELDER ID
Geomembrane Repair Log SummaryRepublic Services 35137134
Fretco Tony B./Joshua G.
BFI Saline County Cell 5 CQA Brad Fureigh, P.E.
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas January 15, 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Attachment I Project Photographic Log
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas
January 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Looking at the placement of GCL and geomembrane on East Slope
Looking east at installation of panel P83
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas
January 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Looking northeast at liner tie-in preparation between panels P83 and P84
Extrusion welding panels P83 and P84
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas
January 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Repairing destructive test sample location DS-31
Vacuum testing extrusion welds
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas
January 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Installation of initial zip-ties on geonet portion of geocomposite
Cell 5, Phase 2 – QC/QA Documentation Report Saline County Landfill ■ Bauxite, Arkansas
January 2015 ■ Project No. 35137134
Responsive ■ Resourceful ■ Reliable
Looking at leistered seam between geocomposite drainage layer panels