Micropiles Save Drilled Shafts Allen Cadden, P.E..

13
Micropiles Save Drilled Shafts Allen Cadden, P.E.

Transcript of Micropiles Save Drilled Shafts Allen Cadden, P.E..

Micropiles Save Drilled Shafts

Allen Cadden, P.E.

Problem

• Settlement of up to 25 to 50 mm

• Cracks in supported floors

• Work stopped before last 2 floors were constructed

Subsurface ConditionsNew Fill

Alluvial Soils

Residual Soils

Partially Weathered Rock

Diabase Rock10-40 ft 3-12 m

Instrumented Load Test

Strain Gauge Configuration

14.4 ft (4.4 m)

10 ft (3 m)

Segment 1

2

3

4

10.9 ft

13.9 ft

16.9 ft

23.4 ft

7 inch, N800.5 inch wall

178 mm, 12.5 mm wall56 kg/mm2 Steel

Strain Gauge

Load Test ResultsCyclic Load Data

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0 40 80 120 160 200 240 280 320 360Load (tons)

Se

ttle

me

nt

(in

)

1070 kN 2140 kN 3210 kN

9 mm

1070 kN

2140 kN

7.4 m

Average Shear Stress vs. Cycle @ 300 ton (2700 kN)(assumes nonmoving pile tip)

0

2

4

6

8

10

12

0 1 2 3 4 5 6 7 8

Cycle

Sh

ear

stre

ss (

tsf)

(kg

/cm

^2)

Segment 1

Segment 2

Segment 3

Segment 4

1150 kPa, 165 psi

Connection to Drilled Shafts

Caisson

High Load, Large Shaft

Connection to Drilled ShaftsLow Load, Small Shaft

Micropile Caps for Caisson Repair

Conclusions• Micropiles fixed the problem

• Loads well in excess of 300 tons can be carried by a 7 inch pile

• The load transfer in a rock socket is not constant under cyclic loading