Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services...
Transcript of Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services...
![Page 1: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/1.jpg)
![Page 2: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/2.jpg)
Microgrids in Urban Redevelopment
Moderator: Eliot Assimakopoulos, Microgrid Sales Leader, GE
Presentations:Will Agate, President & Founder, NetZero Microgrid SolutionsRobert Morin, Senior Project Developer, AmerescoJohanna Ghabour, Senior Project Manager, Veolia
![Page 3: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/3.jpg)
Developing Economically Viable and Resilient Microgrids
GE Distributed Grid Solutions
Eliot AssimakopoulosMicrogrid Sales Leader
![Page 4: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/4.jpg)
What’s a Microgrid?
It has to island! It should
have renewables
It needs to interact with the market
Gotta include
batteries
Net-zero energy!
![Page 5: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/5.jpg)
What about Grid Resilience?
re·sil·ienceriˈzilyəns/noun
1. the ability of a substance or object to spring back into shape; elasticity.
2. the capacity to recover quickly from difficulties; toughness.
Grid Resilience…
The degree to which an electrical grid is reliable, recoverable, & efficient
![Page 6: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/6.jpg)
Two ways of looking at resilience…Tenacity Wisdom
By wisely planning your energy system you can avoidbeing forced to rely on your capacity to react
![Page 7: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/7.jpg)
Key Challenges in Developing MicrogridsComplexity
• Integration of DERs• Multiple stakeholders
Economics• Cost• Business model • Financing…particularly with multi-user microgrids
Utility / Market Interaction• Potentially competes with utilities• Utility business models
Technical• Voltage & Frequency Control…managing stability• Islanding & grid integration• Protection & Control
Regulatory• Nascent regulatory environment• Fragmented regulations
![Page 8: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/8.jpg)
8 /
© 2012 General Electric Company. All Rights Reserved
Utility Needs
An holistic approach is essential in developing economically viable microgrids
Reliability and Stability ImprovementReduce System Losses Situational Awareness
Innovative business models at each level will drive market transformation
Optimal balance (supply and demand) of distributed resources to enable reliable and economic operation
Microgrids need to:
Span of Control
Microgrid
Operational Platform (DMS/EMS)
Virtual Power Plant
Local Substation Market Operator
Load resources
Integrated resources
Res
ourc
e
Consumer Energy
Manager
DER Manager
Demand Response
Provide solutions and services to plan, forecast, schedule, and dispatchWhat
• Load resources– dispatchable consumption • Distributed generation - Renewable or non
renewable generation • Integrated resources – load and generation
systemsWhere
• Local – residential, commercial, and industrial• Substation /Feeder – distribution system • Market Operator – electricity and balancing
market
Monetized interaction are necessary in order to pay for resiliency premium & attract private investment
![Page 9: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/9.jpg)
9
Energy Surety Sustainability Economic Value
Market segments and drivers will drive the value proposition
MILITARYBases w/ Critical
Infrastructure
INDUSTRIALMining/Refineries
Ports
ISLANDSRemote GridCommunities
Institutional / DistrictUniversity/labs
HospitalsUtility Microgrids
Convergence of environment, energy cost/efficiency, security, and system reliability prove to be the key drivers for Microgrids . . .
RENEWABLES INTEGRATION
BASE ISLANDING
COE REDUCTION
ENERGY SECURITY
CRITICAL INFRASTRUCTURE
ENERGY EFFICIENCY
COE REDUCTION
ENERGY SECURITY
ENERGY RELIABILITY
CRITICAL INFRASTRUCTURE
RENEWABLES INTEGRATION
ENERGY EFFICIENCY
Industrial Efficiency
COE REDUCTION
ENERGY SECURITY
ENERGY RELIABILITY
FOSSIL FUEL DEPENDENCE
RENEWABLES INTEGRATION
CRITICAL INFRASTRUCTURE
COE REDUCTION
ENERGY SECURITY
ENERGY RELIABILITY
Microgrid R&D
RENEWABLES INTEGRATIONDRIVERS
Primary DriversSecondary Drivers
![Page 10: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/10.jpg)
10 /
© 2012 General Electric Company. All Rights Reserved
End-user & Utility Challenges� Increased energy independence … leads to energy efficiency
improvement projects
� Multiple recent regulations instituted … forces planning for current/future regs
� Growing water scarcity … drive water consumption reduction projects
� Strong operational performance focus … need to optimize full life-cycle costs
� Multiple other additional pressures …
• Installation-wide energy & H2O security• End-user operations resilience, assured fuel,
reduced logistics tail, etc.• Cyber security
• Compliance now & future planning• Federal/state mandates & regulations,
NetZero initiatives, carbon legislation
• Reduce cost through efficiency & intelligent system design
• Optimize energy-to-investment ratio• Utility cost/benefit
End-user Drivers
Security
Regulatory
Financial
Correctly Design your Energy System Aligning drivers, challenges, and resources to get to the correct type of system
End-user & utility energy objectives will drive whether you will have a:• Natural gas based microgrid• Renewables based microgrid
![Page 11: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/11.jpg)
11
Leveraging microgrids as a foundation for economic development
Examples
![Page 12: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/12.jpg)
12 /
© 2012 General Electric Company. All Rights Reserved
Pearl Street Microgrid (1882)• Primary driver was selling lightbulbs• Ten 27 ton 100Kw steam generators• DC Power Microgrid• Served 59 Customers• Islanded operation• HMI enabled
![Page 13: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/13.jpg)
• Eastern Japan 2013, 25000 Sq. Ft.
• 18 racks each 15 levels, 17000 LED fixtures
• 10000 heads of Lettuce per day (100 fold density increase from outside)
• Grows 2.5X faster than outside
• Waste from 50% to 10% compared to outside
• 1% of water usage compared to outside
• LED 40% less power than florescent light
Modern day exampleUrban vertical farming
![Page 14: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/14.jpg)
14 /
© 2012 General Electric Company. All Rights Reserved
Key elements needed to successfully achieve economically viable microgrids
Energy Surety & Renewable Energy Objectives Require Differing Approaches• Energy Surety Goal: Most cost effective method will lean towards natural gas generation microgrids
• MG functionality: Islanding, fast load-shed, net metering, ancillary services• Renewable Energy Goal: Most cost effective method will learn towards wind / biogas biomass/ landfill gas
generation Microgrids• MG functionality: Optimal dispatch, firming, DSM, ancillary services
Utility Collaboration• Microgrids need to interact and provide value to host utility
• As well as supporting communities e.g. first responders, continuity of government, …• Provide ancillary benefits (Supply/demand management, frequency regulation, …)• Enable facility energy operator to contract with utility these services
Privatized & Monetized Structures• ESCOs, IPPs, Utilities need to be able monetize the smart-grid features of the microgrid in order to offset cost
of energy surety & attract investment• Capitalization of existing assets can create opportunities for financial support
Unified Standards & Certification• DOE needs to drive Microgrid/Smart Grid standards, interoperability, utility integration• Cybersecurity & IT infrastructure standards• Certification of technology, architecture, & functionality
Develop a long-term energy roadmap with off-ramps for incremental development• Establish long-term vision with short-term requirements
![Page 15: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/15.jpg)
15 /
© 2012 General Electric Company. All Rights Reserved
Adoption, Policy, and Innovation Begins at the Local Level (You!)
![Page 16: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/16.jpg)
16 /
© 2012 General Electric Company. All Rights Reserved
![Page 17: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/17.jpg)
PHILADELPHIA NAVY YARD MICROGRID AND PEAKING PLANT
MAY 9, 2018
![Page 18: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/18.jpg)
©2018 Ameresco, Inc. All rights reserved.
We empower our customers with cost-effective, environmentally sustainable solutions.
ABOUTAMERESCO
Leading Energy Services Provider
Pioneering Developer ofRenewable Power Projects
• Implement efficient, energy and money-saving solutions, including retrofits
• Design, build and even operate client-owned renewable energy sources
• Tailor services to meet specific customer needs and sustainability goals
• Industry-leading expertise in solar and landfill gas
• Developed over 300 MW of renewable energy projects
• Over $200 Million in renewable power projects for customers
Sociallyresponsible.Economicallyefficient.
Sociallyresponsible.Economicallyefficient.
Trustedsustainabilitypartner topublic andprivatesectors
Trustedsustainabilitypartner topublic andprivatesectors
![Page 19: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/19.jpg)
©2018 Ameresco, Inc. All rights reserved.
EnergyEfficiency
RenewableEnergy
EnergyInfrastructure
EnergyAnalytics
Financial OptionsEnergy SupplyManagement
COMPREHENSIVESOLUTIONS
![Page 20: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/20.jpg)
©2018 Ameresco, Inc. All rights reserved.
INDUSTRIES WE SERVE
![Page 21: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/21.jpg)
©2018 Ameresco, Inc. All rights reserved.
Founded in
2000
$2.5 BillionProject financing
sourced and raised
MORE THAN
1,000 employees
Structured to Deliver
Customer Value
267MWeof energy and landfill gasgenerated by owned and operated energy plants
$717.2Million
annual revenue in 2017
$1Billion
bonding capacity with a per project maximum
of $150 million
PUBLIC
2010NYSE: AMRC
OVER$5 Billion
in energy solutions delivered since inception
(including our predecessors)
SAVING ENERGY, AND SUPPORTING SUSTAINABILITY GOALS
![Page 22: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/22.jpg)
©2018 Ameresco, Inc. All rights reserved.
PHILADELPHIA NAVY YARDA COMMUNITY MICROGRID BUSINESS MODEL
Will Agate, LEED APPresident and FounderNetZero Microgrid Solutions
![Page 23: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/23.jpg)
©2018 Ameresco, Inc. All rights reserved.
To lead customers in deploying microgrid and relatedsmart electric distribution solutions for their communities.
Successes will be achieved by holistically collaboratingwith technology, financial, and public sector providers inorder to integrate superior economic development andfinancial returns that dramatically reduce or eliminateharmful energy consumption and carbon footprint.
![Page 24: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/24.jpg)
©2018 Ameresco, Inc. All rights reserved.
LOCATION: THE NAVY YARD
• Centralized location• Access to:
• Major highway
• Intermodal freight system• International Airport
• Center City, University City, 30th Street• Sports Complex
![Page 25: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/25.jpg)
©2018 Ameresco, Inc. All rights reserved.
Philadelphia Navy Yard Today, source PIDCPhiladelphia Navy Yard 1999, source PIDC
• 12,500 employees• 150+ companies; 3 Navy activities• 7.5 million SF occupied real estate
$750+ mil of private investment• $150+ mil of publicly funded infrastructure
upgrades
• 3,000 employees• 10 Companies• Limited private investment• 20+ years deferred
infrastructure
THE NAVY YARD THEN & NOW
![Page 26: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/26.jpg)
©2018 Ameresco, Inc. All rights reserved.
A MANUFACTURING AND INDUSTRIAL CAMPUS
![Page 27: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/27.jpg)
©2018 Ameresco, Inc. All rights reserved.
A HISTORIC PRESERVATION STORY
![Page 28: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/28.jpg)
©2018 Ameresco, Inc. All rights reserved.
A MODERN, PROGRESSIVE AND SUSTAINABLE OFFICE CAMPUS
![Page 29: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/29.jpg)
©2018 Ameresco, Inc. All rights reserved.
A SUSTAINABLE AND INNOVATIVE CAMPUS
Free shuttle service
Adaptive reuse LEED rated buildings Energy efficiency EV charging stations
Storm water management Bike lanes Rain gardens Permeable pavement
![Page 30: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/30.jpg)
©2018 Ameresco, Inc. All rights reserved. 30
• Growth at The Navy Yard driving increased demand• Industrial load curves are peaky• Aging infrastructure – existing external supply reaching limits to capacity
PROBLEM STATEMENT
![Page 31: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/31.jpg)
©2018 Ameresco, Inc. All rights reserved.
TheFivePointActionPlanü Infrastructure:Capacity,Generation/Supply,TechnologyMicrogrid
ü BusinessModel:Forecasts,Tariffs,Procurement,O&M,Capital
ü BuildingOwnerOpportunities:DG,EE,DR– Programs&Partnership
ü TestBeddingOutreachandR&D:EnergyInnovationCampus
ü CarbonReductionandSustainability:ReduceCarbonIntensity
THE NAVY YARD ENERGY MASTER PLAN “CONSTITUTION”
![Page 32: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/32.jpg)
©2018 Ameresco, Inc. All rights reserved. 32
• Traditional “wires” option...new or upgraded substation• Non-wires solution (NWS)
• PIDC and Burns Engineering developed Energy Master Plan• Distributed Energy Resource (DER) - 6MW gas-fired peaking plant• Growth plans to 8MW - under contract, COD late 2018
SOLUTION OPTIONS
![Page 33: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/33.jpg)
©2018 Ameresco, Inc. All rights reserved.
THE NAVY YARD ENERGY MASTER PLAN AND GRID MODERNIZATION
Creating4Microgrids• 1st PhaseGrid Modernization (2014-2017)
• Approximate $33 million• Public and Private investments• Smart meters, communications
On-Site Generation• 10 MW substation with PECO tie-ins• 6MW natural gas peak shaver/backup power• 1 MW on site solar generation
![Page 34: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/34.jpg)
©2018 Ameresco, Inc. All rights reserved. 34
AMERESCO 6MW NATURAL GAS PEAKING PLANT• Awarded project to Design, Build, Operate & Maintain
6MW natural gas-fired peaking plant• Contracts and financing plan finalized – under
construction. COD late 2017
• Primary component of The Navy Yard energy master plan:
• Relieve high demand in industrial district and address near term demand growth
• Allow PJM market participation and associated revenues• Able to provide resiliency services• Will become integral part of DOE funded advanced
microgrid
![Page 35: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/35.jpg)
©2018 Ameresco, Inc. All rights reserved. 35
• Three (3) 2MW natural-gas fired reciprocating engines• Infrastructure for expansion to four engines (total 8MW)• Simple cycle - no heat recovery• Permitted and expected to run approximate 1000 hours per year (SCR not required)• Remotely dispatched and monitored utilizing Curtailment Service Provider (CSP)• Integrated into Navy Yard’s GridNOC• Ameresco designed & built and holds 20-year O&M contract
PROJECT DETAILS
![Page 36: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/36.jpg)
©2018 Ameresco, Inc. All rights reserved. 36
• Wires solutions solves capacity constraint issue – otherwise a “dead” asset• DER provides stacked value proposition
• Solves capacity constraint• Generates revenue - PJM ancillary service and energy markets• Delivers capacity and transmission charge savings • Provides resiliency - black start & island mode capable
VALUE PROPOSITION
![Page 37: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/37.jpg)
©2018 Ameresco, Inc. All rights reserved. 37
• PJM Ancillary Service and Energy Markets• Synchronized Reserve – 10 minute response to PJM signal required• Economic Demand Response – dispatch decisions determined by day-ahead and same-day Locational
Marginal Price (LMP)• Reduce Peak Load Contribution (PLC)
• Dispatch during predicted grid peak times (Jun 1 to Sept 30, typically afternoon)
• Resiliency payments for black start / island mode capability
DISTRIBUTED RESOURCES DELIVER STACKED VALUE FOR
A HAPPY CUSTOMER
![Page 38: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/38.jpg)
©2018 Ameresco, Inc. All rights reserved. 38
A Power Plant with Style!
![Page 39: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/39.jpg)
©2018 Ameresco, Inc. All rights reserved.
CREATING THE CONNECTION AT THE CORE: THE NETWORK OPERATIONS CENTER FOR CUSTOMER ENGAGEMENT, R&D AND EDUCATION
• Integrating and optimizing on-site generation and storage with external supply
• Robust electric customer engagement program providing significant R&D, business outreach and national demonstration values
• DOE Microgrid controller funding and participation providing electric customer participation and economic benefits
• PJM participation with on-site personnel• Adding the Penn State Training NOC and 7R-GridSTAR
2.0 CHP-based microgrid pilots• Scalable deployment with Main Campus R&D faculty and
collaborators
![Page 40: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/40.jpg)
©2018 Ameresco, Inc. All rights reserved.
COMMUNITIES – POSITIONED FOR THIS CHANGE
Communities – Positioned for this ChangeRetirement Communities
Hospitals Real Estate Development
Colleges & Universities Towns & Municipalities
Luxury Resorts
FormerAlmono SiteNowHazelwoodGreen
![Page 41: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/41.jpg)
©2018 Ameresco, Inc. All rights reserved. 41
SO WHAT…
• Scalable solutions• Many communities supply of electricity is constrained
• Significant aging infrastructure
• How to deploy radically higher concentrations of renewables and non-traditional solutions
• Scalable value propositions• Building the microgrid as a business platform
• Participate in a new revenue model (e.g.: the PJM Ancillary Market, NY REV)
• Create returns on investment
• Offer customers sustainability solutions that beat the competition
• But most importantly…• It’s not about the flow of electrons…
• Economic development and Making Communities Stronger• Addressing climate adaptation and increasing resilience
• Collaboration and building stronger communities (e.g. how is higher education included? how to build emergency resiliency? etc.)
![Page 42: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/42.jpg)
THANK YOU
Your Trusted Sustainability Partner
ameresco.com
Robert MorinSenior Project [email protected] S. 12th St – Phila Navy YardPhiladelphia PA 19112
Will Agate, LEED APPresident and FounderNetZero Microgrid [email protected] S. 12th St – Phila Navy YardPhiladelphia, Pa 19112
![Page 43: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/43.jpg)
©2018 Ameresco, Inc. All rights reserved.
Vehicle Charging Stations Community Solar
Fuel Cell Storage Battery
A NEW MODEL: THE SMART CITY, A DIGITAL URBAN CAMPUS
![Page 44: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/44.jpg)
©2018 Ameresco, Inc. All rights reserved.
POWER OUTAGES CAUSED BY MAJOR WEATHER EVENTS
![Page 45: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/45.jpg)
©2018 Ameresco, Inc. All rights reserved.
Society
• Occupant comfort
• Healthy work environment
Economics• Generate onsite
power• Store power
Environment• Optimize efficiency• Control loads
A HOLISTIC APPROACH
What is Missing…
![Page 46: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/46.jpg)
CHALLENGES & OPPORTUNITIES
![Page 47: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/47.jpg)
©2018 Ameresco, Inc. All rights reserved. 47
Commercialization of the microgrid business model
INTEGRATE NEW ENERGY INVESTORS AND TOOLS
![Page 48: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/48.jpg)
48 /
© 2012 General Electric Company. All Rights Reserved
![Page 49: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/49.jpg)
Micro-GridinUrbanDevelopment
HudsonYards:HowVeoliaWillHelpPower18MillionSquareFeetinNewYorkCity’sWestSide
May2018
![Page 50: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/50.jpg)
HudsonYards– SiteMap
![Page 51: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/51.jpg)
HudsonYards– Pre-construction
![Page 52: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/52.jpg)
HudsonYards– Pre-construction
![Page 53: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/53.jpg)
HudsonYards– SiteOverview
![Page 54: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/54.jpg)
HudsonYards– SiteOverview
![Page 55: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/55.jpg)
HudsonYards– SiteOverview
PhotoviaTutorPerini
![Page 56: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/56.jpg)
MicroGrid IntroductionACogeneration(Cogen)PlantwasdesignedtobeinstalledontheroofoftheRetailbuildingatHudsonYards
ThePlant’smainmechanicalequipmentislocatedontheroof(10thfloor)andtheelectricalgearislocatedonthe8thfloor.
TheCogenplantgenerateselectricity,hotwater,andchilledwaterusingfournaturalgasreciprocatingengines
TheCogenplantisdesignedtooperateevenwhentheutilitygridisdown,providingpowerforbusinessoperationsviaaMicroGrid setup
TheCogenplantisconnectedtoacampusThermalLoopwhichwillprovideeachbuildingaccesstohotwaterandchilledwater
![Page 57: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/57.jpg)
HudsonYards– SiteOverview
![Page 58: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/58.jpg)
HotWaterThermalLoop
![Page 59: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/59.jpg)
ChilledWaterThermalLoop
![Page 60: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/60.jpg)
![Page 61: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/61.jpg)
ProjectTeam§ Related,HudsonYards=Owner
§ SourceOne,Veolia=Owner’sRepresentative– DevelopedearlyfeasibilitystudytomeetRelated’s energygoals– CreatedProforma modelusingenergyloadprofilestodetermineproject
profitabilityandsizing– Workedwiththeutilitytonegotiatetariffs&configureinterconnectdesign– Negotiatedinterconnectionagreementwithutility– NYSERDAgrantmoney– Coordinateddesignentitiesafterselectionofplantconfigurationandsizing– Pre-purchasedenginesandMVswitchgear
§ Design:– R.G.Vanderweil=EngineerofRecord– Jaros Baum&Bolles =CogenSiteIntegrationEngineer– KohnPedersenFoxAssociates=Architect– ThorntonTomasetti =StructuralEngineer
![Page 62: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/62.jpg)
ProjectTeam§ Construction:
– NortheastEnergy/GE=EngineVendor– Eaton=MVElectricalEquipmentManufacturer.– KSW=TradeManager
§ SourceOne,Veolia=CommissioningAgent
![Page 63: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/63.jpg)
DriversForProfitability§ Efficiency§ Lowercostofproduction§ Valueofdiversegenerationsource§ Capitalavoidanceofemergencygenerators,boilers,andchillers§ Spacesavingsinbuildings§ Operatorsavings§ Maintenancesavings§ Efficiencyoflarger,betterrununits§ Greenhousegasbenefits– grantfunding
![Page 64: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/64.jpg)
DesignObjectives§ Flood-proofdesignconstruction§ Microgrid:Interconnectedtotheutilityandprovidebackup
powerviapriorityloadingscheme§ Thermalloopinterconnectedwithbuildingplants§ FunctionalOccupancyforresidential,restaurantsand
commercialbasebuildings§ Opt-inbackuppowerforretailandcommercialtenants§ 13.2MWofCogeneration§ Smartsub-meteredbuildings§ EnergyCommandCenter§ TierIVgenerators(demandresponseready)§ Day2serviceability
![Page 65: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/65.jpg)
![Page 66: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/66.jpg)
ConEdisonInterface– Microgrid Evolution
Operationwith480VoltInterface
![Page 67: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/67.jpg)
ConEdisonInterface– Microgrid Evolution
Operationwith13.2kVUtilityInterface
![Page 68: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/68.jpg)
OperationwithMicrogrid Breaker
ConEdisonInterface– Microgrid Evolution
![Page 69: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/69.jpg)
![Page 70: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/70.jpg)
PlantConfiguration
FourReciprocatingEngines
FourIndirect-FiredAbsorptionChillers
TwoElectricCentrifugalChillers
ElectricProduction:13.3MW§ 4x3.3MWGEJenbacher Recip Engines
ThermalProduction:5,140tonsCHW,42MMbtu/hr HW§ 4x690tonAbsorbers(Thermax)§ 2x1250tonElectricChillers(Trane)
![Page 71: Microgrids in Urban Redevelopment · 2018-05-16 · Demand Response Provide solutions and services to plan, forecast, schedule, and dispatch What • Load resources–dispatchable](https://reader033.fdocuments.in/reader033/viewer/2022060213/5f055cab7e708231d4129627/html5/thumbnails/71.jpg)
NavigatingMicrogrid inUrbanNYC§ AuthoritieshavingJurisdiction:
– NYCDepartmentOfBuildings(DOB)– NYSDepartmentofEnvironmentalConservation(DEC)– FireDepartmentofNewYork(FDNY)– NYCDepartmentofEnvironmentalProtection(DEP)– ConEdison(localutility)– NYCElectricalAdvisoryBoard
§ UtilityInterconnection
§ TariffNegotiations
§ ServiceShutdowns
§ Riggingon10thAvenue/streetshutdowns
§ ConstructionCoordinationwithRailyard
§ TenantOccupancyduringconstruction
§ Commissioning