Micoperi Hadera
2
Micoperi Hadera SPT performed the engineering and installation of 8 Suction Mooring Piles for an STL buoy for the Hadera Field Development. The Suction Piles where installed in approx. 75 m water depth. The suction pile dimensions are: OD 9.0m x 11.5m deep (2 no.s) OD 9.0m x 18.5m deep (6 no.s) Installation was performed using SPT suction installation spread SAPS-001 from a Client offshore installation vessel
-
Upload
jiokoijiko -
Category
Documents
-
view
18 -
download
1
description
Micoperi Hadera
Transcript of Micoperi Hadera
Micoperi HaderaSPT performed the engineering and installation of 8 Suction Mooring Piles for an STL buoy for the Hadera Field Development.The Suction Piles where installed in approx. 75 m water depth.The suction pile dimensions are:OD 9.0m x 11.5m deep (2 no.s)OD 9.0m x 18.5m deep (6 no.s)Installation was performed using SPT suction installation spread SAPS-001 from a Client offshore installation vessel