MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi...

19
MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi
  • date post

    22-Dec-2015
  • Category

    Documents

  • view

    217
  • download

    1

Transcript of MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi...

Page 1: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

MICE tracker meeting 2005.3

Prototype TOF test for tracker test @ KEK

Osaka universityAtsushi Horikoshi

Page 2: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

contents magnetic field of Super Jacee shape of TOF timing resolution test @KEK-PS pi2 Analysis calibration for PhaseⅡ

Page 3: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

PhaseⅡsetup (KEK-PS pi2)

perpose measurement of momentum emittance reconstruction

Page 4: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

super conducting magnetSuper JACEE , 1T

2.1m

φ850mm

vessel for ballonexperiment

front veiw

side view

Page 5: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

requirement of TOF π/μ PID

3σresolution momentum scan

measurement of absolute value resolution of momentum

keep high timing resolution in magnetic field

Page 6: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

π/μPID momentum of Phase Ⅱ

300 ~ 600Mev/c timing resolution f

or 3σPID upstream 50ps down strean 50ps

3σPID

Page 7: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

momentum timing resolution

upstream 50ps downstream 50ps

momentum resolution p<600MeV Δp/p<5.6%

7

00.25 0.6

Page 8: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

shape of TOF to avoid reduction of timing resolution

fine mesh PMT (used BESS experiment) R6504S (hamamatsu, 19DY)

PMT is parallel to magnetic field long light guide

Page 9: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

magnetic field 1500Gauss ,almost parallel satisfies the condition

コイル

Page 10: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

effect of the ground of iron@PMT

1T

thanks for Arimoto san

TOSCA

Page 11: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

magnetic field of PMT the effect of iron

is small

iron

y

0

geometry

magnetic filed first second third

Page 12: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

prototype test( KEK-PS pi2,2005 Feb)

guide7 simulation timing resolution47ps

setup of beamline

Page 13: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

analysis

ref2)}(ref1σ

ref2)(tofσ

ref1)(tof{σ

(tof)σ

2

2

2

2

1

2

σ(tof-ref1) =64ps

⇒σ ( tof ) =49ps

Page 14: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

position scan,timing resolution

timing resolution[ ps ]

●: PMTR〇: PMTL

under ●weightedmean

distance from center[ cm ]

90

timing resolution is 50ps @ all position

50

0

0 2020

satisfied condition of PID

Page 15: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

position scan 2 , npe npe

600~800 very high npe

attenuation length 118cm

Page 16: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

effective velocity

Veff=15.3cm/ns not good linearity

Page 17: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

calibration for PhaseⅡ we can’t determine hit position from ext

ernal tracker in PhaseⅡ calculation from tdc mean Veff=15.3cm/ns

t(hitR)=tr-(20-z)/Veff t(hitL)=tl-(20-z)/Veff z=(tr-tl)xVeff/2

Page 18: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

timing resolution using tdc mean

position is calculated from tdc , tofrt-toflt

timing resoluiton 50~57ps 48~52ps (using ref1 positio

n) position spread

-0.5~0.4cm

Page 19: MICE tracker meeting 2005.3 Prototype TOF test for tracker test @ KEK Osaka university Atsushi Horikoshi.

summary timing resolution

50ps @ all position npe=600~800 Veff=15.3cm/ns

calibration using tdc mean 53ps @ all position , stability is not good