MICE Partial Return Yoke PRY Fabrication
description
Transcript of MICE Partial Return Yoke PRY Fabrication
![Page 1: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/1.jpg)
1
MICE Partial Return YokePRY Fabrication
06 November 2013Stephen R. Plate
Brookhaven National Laboratory
9/23/2013
![Page 2: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/2.jpg)
2
Outline
• 6-Section Design Change – update• Cost & Procurement Status• Work to complete
9/23/2013
![Page 3: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/3.jpg)
3
Previous design
New designLeft/right symmetry
9/23/2013
Shorter horizontal reach
LoweredRestraint bars(clear mezz, south)
Center sections(independent removal)
Add Hall floor(no leg splices, shorter leg)
New leg arrangement
![Page 4: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/4.jpg)
49/23/2013
Tie-down bar apertures repositioned
Waveguide slots to be angled upward
Crossbar positions not final
![Page 5: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/5.jpg)
5
Bolted leg-channel connections
9/23/2013
Rail is now intermittent
Jacking screw for disassembly (3)
![Page 6: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/6.jpg)
69/23/2013
LC
3306 kg
3490 kg
6-Section Design
1807 kg
1380 kg
4°taper
Lighter color indicates machined areas
![Page 7: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/7.jpg)
7
Fabrication Cost & Procurement Status
• JFE steel order (JFE, Kurashiki, Japan)– 100 mm thick main plates, 50 mm backing plates– Steel of magnetic uniformity– Material total ~$70,000 for 12 plates (8 end, 4 ctr, 8 backing plates)– Delivery: ~16 weeks
• Machining– Separate vendor, to be identified– ~$2850, each plate
• Framework drawings– Some dwgs. out for quotation– 3 suppliers queried– Awaiting responses
9/23/2013
![Page 8: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/8.jpg)
8
Work to complete • Modifications to shielding plates
– Reposition crossbars– Virostek plate extension mounts and flux leakage mitigation parts– Finalize position and size of slots for tracker waveguides (angled, not
normal to surface)– Add drilled/tapped holes for bolted connections, hoist rings, crossbar
mounts– Assembly and detail drawings for all of the above items
• Deflection/Stress Analysis– Recheck new model in ANSYS Workbench– No surprises expected, but need verification
• Structural Framework– Assembly and detail drawings for restraints bars & lower support arms
9/23/2013
![Page 9: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/9.jpg)
9
BACK-UP INFORMATION
9/23/2013
![Page 10: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/10.jpg)
10
Assembly Procedure(in progress)
9/23/2013
![Page 11: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/11.jpg)
11
Install Section 1
Machined surfaceson channelmate to pink bar
Section 2 is similarly installed
Hoist ring spacer provides correct tilt
Clearance to back of channel
Hoist ring
9/23/2013
NOTE: Slides 11-14 show old design, but technique remains current
![Page 12: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/12.jpg)
12
Install Section 3 (and 4)
Lower hoist rings removed;
guide blocks installed
(also shown on isometric, Slide #4)
Plate guided into engagement
during lowering
9/23/2013
![Page 13: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/13.jpg)
13
Install Restraint Bars
9/23/2013
All beam-to-channel connections will also be bolted
![Page 14: MICE Partial Return Yoke PRY Fabrication](https://reader036.fdocuments.in/reader036/viewer/2022062310/56815f82550346895dce86c2/html5/thumbnails/14.jpg)
14
(Assembly Technique – continued)
• … Install Virostek plate extensions• Install spectrometer solenoids and AFC• Build and install shielding on north side, same technique as
south side• Install north/south load-sharing cross bars
9/23/2013