MICE Integration EngineeringJason Tarrant - STFC
Contents» Device Interfaces – General» AFC» Spectrometer Solenoids» RFCC» EMR / KL» South Mezzanine (summary)
![Page 2: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/2.jpg)
MICE Integration Engineering Device Interfaces - General
MICE centre to grouted inplate = 1649 mm-120 mm, rolling platform-1515 mm, base to centre= 14 mm min shim
Shim to take up heightand clocking (rotation)deviations
![Page 3: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/3.jpg)
MICE Integration Engineering AFC
» Geometry– Tesla support system modifications = suspension system turrets changed (model received 3/7/11)
1534!Asked to changeback to 1515
![Page 4: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/4.jpg)
MICE Integration Engineering AFC
» Geometry– Hydrogen Safety Vacuum Line clash with South Mezzanine
Old
flo
or
hei
gh
t
Rai
sed
flo
or
hei
gh
t
![Page 5: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/5.jpg)
MICE Integration Engineering
Clash with rails
Clash withsupport leg
AFCs not shownso vacuum pipe run can be seen
![Page 6: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/6.jpg)
MICE Integration Engineering
Beams cut back
Support legmoved tonext beam
Raised & narrowedfloor section(removable butH system partstemporarily moved)
Cut required in floor panelaround vacuum pipe
![Page 7: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/7.jpg)
MICE Integration Engineering Spectrometer Solenoid
» Interface with rolling platforms
Mismatch withlatest model
![Page 8: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/8.jpg)
MICE Integration Engineering Spectrometer Solenoid
» Interface with rolling platforms
BoltedInterface withadjustment?
![Page 9: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/9.jpg)
MICE Integration Engineering Spectrometer Solenoid
» Geometry
Rotate for convenience?
Port closeto mezzanine
![Page 10: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/10.jpg)
MICE Integration Engineering Spectrometer Solenoid
» Geometry
Brackets not alignwith latest model
![Page 11: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/11.jpg)
MICE Integration Engineering RFCC
Ports to be moved?
Services tray to be moved
Mezzanine to beshortened locally & raised (poss. wholelength to preventtrip hazard?
1m walkway(0.8m min)
![Page 12: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/12.jpg)
MICE Integration Engineering RFCC
Ports to be movedto opposite side
Services tray replacement(need water pipe move)
Mezzanine narrowed & raised at front
Width of walkway < 800mm (localised)
Gas
pan
el
![Page 13: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/13.jpg)
MICE Integration Engineering RFCC
![Page 14: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/14.jpg)
MICE Integration Engineering EMR
![Page 15: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/15.jpg)
MICE Integration Engineering
Mezzanine & EMR Beams cut back
Floor plates removed
Hydrogen frameclash (work postponed)
![Page 16: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/16.jpg)
MICE Integration Engineering Mezzanine & EMR Potential clash
With support pillars
June2011
Step VStep VI
Step IV
Supportlegs moved
Beams cut back
Removablefloor section
![Page 17: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/17.jpg)
MICE Integration Engineering South Mezzanine change summary
» Move 4 of 5 support legs to another beam» Fit cross beam between support legs to support
intermediate beams before cutting intermediates» Fit removable platform sections spanning
between support leg beams– Higher & narrower than current mezzanine (avoids
RFCC & AFC pipe line)– Outer beam = kick plate– Rail with dog leg fitted to outer beam
![Page 18: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/18.jpg)
MICE Integration Engineering South Mezzanine change summary
![Page 19: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/19.jpg)
MICE Integration Engineering South Mezzanine change summary
Hydrogensupply
Existingmezzanine
Movedsupports
Cut beamsRemovable
sections
Fixed crossbeam (supports
Intermediatebeams)
![Page 20: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/20.jpg)
MICE Integration Engineering South Mezzanine change summary
![Page 21: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.](https://reader030.fdocuments.in/reader030/viewer/2022032414/56649ef55503460f94c08f76/html5/thumbnails/21.jpg)
MICE Integration Engineering South Mezzanine – Before change!
» Is the narrow walkway acceptable for safety?» Can the H system frame & pipes be raised to give headroom?»
» Is the raised floor compatible with the hydrogen racks?» What needs to be installed / moved along the mezzanine
walkway? Is it compatible?» Structurally OK?
Can H system frame /pipes be temporarily re-moved to move platforms?