MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern
description
Transcript of MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern
![Page 1: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern](https://reader035.fdocuments.in/reader035/viewer/2022070404/56813c30550346895da5afa7/html5/thumbnails/1.jpg)
MICE Collaboration meetingMay 31st – June 3rd 2009
RALTim Hayler, Andy Lintern
DRAFTSEQUENCE OF EVENTS
STEPS 1 - 3
![Page 2: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern](https://reader035.fdocuments.in/reader035/viewer/2022070404/56813c30550346895da5afa7/html5/thumbnails/2.jpg)
Draft sequence of eventsdepending on deliveries and ISIS schedule
• Install TOF1 and KL in place for step 1• Run step 1 (Sep 2009)• Remove TOF1 and KL (move downstream)• Install spectrometer solenoid (SS1) in step 2, in beam, position. Cool down, run to full
current.• Install diffuser• Test diffuser• Perform quench test• Test diffuser• Remove diffuser• Move SS1 to parked step 2 position (This operation defines the space needed
upstream of SS, is there enough room?). Install tracker into bore and align.• Move SS1 with tracker back into beam position.• Install diffuser, V plate in front of SS1 and TOF1 into cage.• Install TOF2 and KL downstream of SS1.• Run step 2 (Q4 2009)
![Page 3: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern](https://reader035.fdocuments.in/reader035/viewer/2022070404/56813c30550346895da5afa7/html5/thumbnails/3.jpg)
Install KL and TOF1 in place for STEP 1
![Page 4: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern](https://reader035.fdocuments.in/reader035/viewer/2022070404/56813c30550346895da5afa7/html5/thumbnails/4.jpg)
Remove TOF1 and KLInstall SS1 in step 2 positioncool down run to full current
![Page 5: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern](https://reader035.fdocuments.in/reader035/viewer/2022070404/56813c30550346895da5afa7/html5/thumbnails/5.jpg)
Install diffuserTest diffuser
Perform quench testTest diffuser
Remove diffuser
![Page 6: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern](https://reader035.fdocuments.in/reader035/viewer/2022070404/56813c30550346895da5afa7/html5/thumbnails/6.jpg)
INSTALL TRACKERInstall and align the tracker into SS1 whilst in the parked, step 2, position. (This operation defines the space needed upstream of the SS, is there enough room?)
![Page 7: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern](https://reader035.fdocuments.in/reader035/viewer/2022070404/56813c30550346895da5afa7/html5/thumbnails/7.jpg)
• Move tracker and SS1 back into the in beam position for step 2• Install diffuser• Install V plate and TOF1 cage• Install TOF2 and KL
![Page 8: MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern](https://reader035.fdocuments.in/reader035/viewer/2022070404/56813c30550346895da5afa7/html5/thumbnails/8.jpg)
STEP 3