MICE CM 32

17
MICE CM 32 Wrap UP

description

MICE CM 32. Wrap UP. Step IV “Almost There”. We Must “Keep Our Eyes on the Prize”. But. All Magnets MUST WORK! No Mistakes, No risk taking, We get no MORE Mulligans! Then: Assembly and integration of all the subsystems in limited space this year is a challenge! - PowerPoint PPT Presentation

Transcript of MICE CM 32

Page 1: MICE CM 32

MICE CM 32

Wrap UP

Page 2: MICE CM 32

Step IV“Almost There”

We Must “Keep Our Eyes on the Prize”

Alan Bross MICE CM 32 February 8-11, 2012 2

Page 3: MICE CM 32

But

Page 4: MICE CM 32

• All Magnets MUST WORK!– No Mistakes, No risk taking, We get no MORE

Mulligans!Then:• Assembly and integration of all the subsystems in

limited space this year is a challenge! • Integration/Engineering activity needs better

communication.• Positioning of magnetic-field sensitive equipment

is now highly critical.

Alan Bross MICE CM 32 February 8-11, 2012 4

Page 5: MICE CM 32

What are the implications of this?

We can sleep When we are

Dead*

*Apologies to Warren Zevonwho is, unfortunately, now sleeping

Page 6: MICE CM 32

Instrumentation, DAQ, Online, Offline, Analysis

• Target operations and Development– Projections indicate stable and long-term running

in MICE• Cerenkov, TOFs, KL, Trackers

– Ready to Go (Mostly)• EMR

– On Track• DAQ, Online, Monitoring and Analysis

– All making Excellent progress

Alan Bross MICE CM 32 February 8-11, 2012 6

Page 7: MICE CM 32

Step IV….

Magnets, Magnets, &

more Magnets*

*Plus some explosive bits

Page 8: MICE CM 32

Spectrometer Solenoids

• First SS ready for leak check in 2 weeks– Arrives at RAL

mid-June• Second in

close pursuit– Arrives at RAL

late August

Alan Bross MICE CM 32 February 8-11, 2012 8

Page 9: MICE CM 32

AFC

Alan Bross MICE CM 32 February 8-11, 2012 9

Page 10: MICE CM 32

LH2 System

R&D complete and Test cryo decommissioned – June 12

Alan Bross MICE CM 32 February 8-11, 2012 10

Page 11: MICE CM 32

And then a bit of magic*….

*I mean much hard work!

Page 12: MICE CM 32

Step IV

Goal: Make this graphic a Photo - Christmas ‘12

Alan Bross MICE CM 32 February 8-11, 2012 12

Page 13: MICE CM 32

And then, there will be no sleep,

even when we are Dead (tired)

Page 14: MICE CM 32

Alan Bross MICE CM 32 February 8-11, 2012 14

Page 15: MICE CM 32

Step VI

Alan Bross MICE CM 32 February 8-11, 2012 15

My Goal: Photo Christmas ’15±

Page 16: MICE CM 32

“May you live in exciting Times”*

• The next 9 months WILL be exciting!– And we all hope very rewarding

• 2013 WILL yield the first cooling measurements

• And prepare the way for MICE – the Final Frontier

*Chinese curse? - 寧為太平犬,不做亂世人

níng wéi tàipíng quǎn, bù zuò luànshì rénAlan Bross MICE CM 32 February 8-11, 2012 16

Page 17: MICE CM 32

On To CM 33

Alan Bross MICE CM 32 February 8-11, 2012 17

Next time: Haggis, deep-fried Snickers and Single-Malt

Apologies to Yordan